水道整治工程 的英文怎麼說

中文拼音 [shuǐdàozhěngzhìgōngchéng]
水道整治工程 英文
channel regulation works
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ形容詞1 (全部在內; 完整) whole; all; complete 2 (整齊) neat; tidy; orderly Ⅱ動詞1 (整理; 整...
  • : Ⅰ動詞1 (治理) rule; administer; govern; manage 2 (醫治) treat (a disease); cure; heal 3 (...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 水道 : water channel; channel; waterway; watercourse; water carrier; water race; water lane; klong; lago...
  • 整治 : 1. (修理; 整理) renovate; repair; dredge (a river, etc. ) 2. (使吃苦頭) punish; fix
  1. In regulation works of mountainous channel, determination of designed lowest navigable water level of reach with fluctuating backwater area is a common problem

    摘要變動回區河段設計最低通航位確定是目前山區航中經常遇到的問題。
  2. Through checking computations, it was shown that the analogue accuracy of the model was quite high, which can provide important basis for scientific decision - making on engineering measures. through analogue calculation and analysis of many regulation schemes, it was shown that combining the diversion weir works with the bed fixing works at the south branch is reasonable and feasible in the implementation of loushuikouzi river regulation works. in addition, it is suggested that the bed fixing works at the south branch should adopt the improved compound section scheme

    經對多個方案的模擬計算與分析,表明漏口子河採用分流魚嘴和南汊固床相結合的措施是合理可行的,通過模型計算研究還提出了南汊固床採用復式斷面形式的改進方案建議,該方案保證了南汊枯期通航和不斷流,而且對南汊及撫遠鎮的保護具有正面作用。
  3. Through flume experiment and numerical simulation, preliminary work on computation of water surface profile in regulation river reach, numerical simulation of flow with single spur dike in flume, and 3 - d numerical solution of flow around spur dikes group are carried out in this paper

    本文通過模型實驗和數值模擬相結合的研究方法,在河段一維面曲線計算,單丁壩繞流數值模擬,紊流數學模型在航中的應用以及丁壩群附近流的三維流動特性等方面做了一些初步研究。
  4. A 2 - d hydrodynamic - numerical model was applied to typical rocky rapids called jiyutan by comparing different computational models. based on the comparison of different schemes, the change of the discharge and the flow current in a branch were analyzed, and the relationship between the flow condition and excavation area, scope as well as mode was discussed, the conclusions show : ( 1 ) in a branching rocky rapids, the velocity may be reduced and flow condition can be improved by excavating one channel partly

    本文在對各種數學模型比較的基礎上,應用二維動力數學模型研究典型石質汊流灘? ?廣西潯江鯽魚灘航方案,通過各方案計算結果比較,分析了不同汊的開挖及汊內不同開挖面積、開挖范圍以及開挖方式所引起的分流比及區域航力條件的變化規律,研究結果表明: ( 1 )對于石質汊流灘來說,在某一汊通過局部開挖河槽,擴大過斷面面積,可以達到降低段流速、改善局部流條件的目的。
  5. The behaviors of the inflow and sediment, the recent evolution rules and trend of the river channel in this section as well as the changing rules and causes of the change of the hechangzhou brai - ded channel are analyzed and the scheme researches, engineering design, construction and the effects of the control works at the entrance of the left branch of the hechang sandbar are presented in the paper

    根據鎮揚河目前的情況分析了該河段來來沙特點、近期河演變規律及演變趨勢,介紹了該河段二期的基本情況,並著重介紹了和暢洲左汊口門控制方案研究、設計、施效果等內容。
  6. Speciality in consultation field : research, design and supervision for sediment engineering in rivers, harbors and waterways, inclusive of river processes, flow and sediment motion, flood control engineering, selection of harbor location, navigation training works, bridge, and water supply projects, etc

    從事河流理和港口航方面的泥沙科學研究和設計、監理作,包括河演變和流泥沙運動規律、防洪、河港選址和航、橋梁和取等方面。
  7. Water supply, drainage, river regulation and desilting in hydraulic engineering ; management stratagy consultation of water resources and flood prevention

    供排、河防淤減淤咨詢、環境和防洪信息管理決策咨詢。
  8. Aiming at the 28km long river regulation and protection works on fuyuan reach where the river evolutions are complicated and the dimensions of control works are difficult to calculate, this dissertation is to study three - dimensional numerical analogue not only under natural conditions but also under ten regulation schemes, using the river sediment quasi - two - dimensional model associated with the river sediment plane two - dimensional model and the river three - dimensional model

    針對江演變復雜,布局及控導結構尺寸難以計算的撫遠28公里長江段的防護,按天然情況和10個不同方案利用河流泥沙準二維數學模型、河流泥沙平面二維數學模型和河三維流數學模型結合進行三維體的數值模擬。
  9. In order to control the flood and to mitigate wangering of the section, since the beginning of building water control works on the yellow river, some 3700 dams, battlements and revetments have beed set up. these works have played an impotant role in flood control

    人民黃以來,為了有效地控制洪,減少主流游蕩范圍,在該河段已修建了3700多由壩、垛、護岸組成的河,對保障防洪安全起到了重要作用。
  10. Abstract : variation of flow condition caused by the multi - pur pose regulation schemes has been investigated on the basis of measured date in r iver model. flood - control of the upper river, operation of the power - station, saf ety of the bridge and power - station, navigation and evolution of the river are a nalyzed. a reasonable and feasible project alternative and the improvement measur ement are proposed

    文摘:涪江潼南河段防洪是一項以防洪為主體的綜合性河岸,在平面二維數值模擬計算的基礎上再進行河模型試驗,比較分析各防洪方案下潼南河段流條件的變化,及其對上游防洪、河、大橋、電站、航運、河勢的影響,提出合理可行的方案
  11. The generating and controlling system of the upstream runoff, downstream tidal current and rotational flow in the physical model test for the yangtze river estuary deep channel training project is introduced

    摘要介紹了長江口深物理模型試驗中配置的上、下游潮汐及旋轉流發生和控制系統。
  12. Permeable pile dike is an important method for stream control in river restoration or construction, and is of some marked advantages including deep groundwork, large strength, simple construction, little emergency, easy maintenance, effective control on the flow trend and increasing the sedimentation

    樁壩是河中的一種,由於其根基深,強度大,施序簡便,具有少搶險,易護理,同時具有控導河勢和在灘地緩流落淤等功效。
  13. According to the test results from the yellow river water - sediment regulation, especially the first test, e paper analyzes the results of the scouring or deposition in the lower river and the area of the river - mouth bar, the adjustment of the channel morphology, the effect of channel regulation and the changes of flowing capacity of the lower reaches

    根據這兩次黃河調調沙試驗成果,特別是首次調調沙試驗成果,對下遊河沖淤效果、河口攔門沙區泥沙沖淤量及其分佈、河勢調作用及河過流能力變化進行了分析。
  14. The dissertation focus on the main conflict of flow and sediment change, by analyzing the flow and sediment features, and change in rivercourse of typical period in histry, collecting the data of riverbed change. according to the flow and sediment change condition, combining the existed water works, and based on the results of former researches, the study are conducted on the law of flow state change by comparing rivercourse conditions before and after the completion of sanmenxia project, which may provide some idea for flow state change when xiaolangdi project completed and put into operation and some basic clue for the prediction of variation trend of river section from tiexie to shendi, from shendi to tieqiao near zhengzhou, from tieqiao near zhengzhou to dongbatou, from dongbatou to gaocun and so on in the year 2010 and the period 2010 to 2020. the result may provide some reference for flood control of these wangdering river sections, and some guidelines for planning of water projects and arrangement of project sequence

    本課題緊緊抓住小浪底庫運用后沙變化這一主要矛盾,通過分析研究以往典型時期的沙特點和河演變特點,收集分析河床邊界條件變化資料,小浪底庫運用后沙資料變化,結合現有河建設情況,總結前人的研究成果,重點研究三門峽庫運用後下遊河河勢變化的規律和特點,探索小浪底庫運用後下遊河勢變化情況,分析預測游蕩性河鐵謝至神堤、神堤至鄭州鐵橋、鄭州鐵橋至東壩頭、東壩頭至高村等各個河段在2010年, 2010年至2020年期間的河勢變化趨勢,為分析游蕩性河段的防洪形勢,指導河建設的規劃和安排提供決策參考和依據。
  15. We shall adopt different regulation methods for waterways of different characteristics in waterway regulation engineering

    摘要航中,要把握每條的特性採用不同的方法。
  16. Finally, in orthogonal curvilinear coordinate systems numerical model is established and applied in the yangtze river estuary in which some regulation plans are taken include submerged jets and groins. verifications are also done to verify water level and velocity. flow fields are computed for the analysis of effect of regulation engineering on the whole water area

    最後,應用正交曲線網格技術,建立了正交曲線坐標系下廣義淺的計算模式,將之應用於長江口深的流場計算,進行實測位、流速驗證和流場模擬。
  17. At present, many fields remain to further research, especially the profound combination of gis technique with ece ( estuarine and coastal engineering ), which should be developed for the purposes as follows : ( 1 ) to serve the huge comprehensive work in changeable natural conditions and difficult construction conditions which takes a long period and covers a large region, e. g. the regulation work of deepwater channel in the yre ( yangtze river estuary ) ( 2 ) to combine the gis with applied numerical model ( 3 ) to study the hydrodynamic processes and characteristics of waves, tidal currents and sediment transport, as well as the affection carried by the regulation work in an estuary ( 4 ) to monitor and to analyze ees ( evolution of erosion and sedimentation ) and the variation of riverbed ( 5 ) to play a role of dynamic supervising of a engineering project

    目前尚有許多有待進一步研究的領域,尤其是以服務于長江口深理這樣規模大、周期長、影響區域廣、自然條件復雜、施情況多變的國家重點為目的,將gis與專業應用數學模型結合,對河口海岸波浪、潮流、泥沙運動的動力機制,以及建築物對其影響的研究,對入海航沖淤和河勢演變的監測分析,對施進展和效果實現「動態」監控和管理,尚缺乏同gis技術的深入有效結合。
  18. The operations of harbors and docks are seriously hindered by sedimentation, which discourage the development of harbor transportation and regional economy. it ' s an urgent and necessary problem of analyzing and solving sedimentation of harbor basins. the analysis and research on sedimentation of mawei harbor in fuzhou was carried out in this paper as an example

    馬尾萬噸碼頭位於彎凸岸,建成后在彎橫向環流的作用下不斷淤淺,雖經,並輔之疏浚,但並未從根本上解決問題,港池深時好時壞,嚴重影響碼頭正常使用,開展相關研究是十分必要的。
  19. The standard k - e model is adopted to simulate the flow of practical channel regulation projects. the numerical results show that the velocity distribution of flow in the regulation project river reach are mainly controlled by the geometries of natural river

    最後將標準k一:紊流數學模型應用於實際航應用中,引入相應的邊界條件,數值模擬了河段流的三維流動過
  20. Application of mathematical model to project optimization of laolonghu channel regulation works

    數學模型在勞龍虎方案優化中的應用
分享友人