水邊圍站 的英文怎麼說

中文拼音 [shuǐbiānwéizhàn]
水邊圍站 英文
shui pin wai
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 邊Ⅰ名詞1 (幾何圖形上夾成角的直線或圍成多邊形的線段) side; section 2 (邊緣) edge; margin; oute...
  • : Ⅰ動詞1 (四周攔擋起來 使裡外不通; 環繞) enclose; surround; corral 2 (繞; 裹) wrap Ⅱ名詞1 (四...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  1. The works mainly comprise the demolition of an existing stepped ramp of a footbridge nf85 ; construction of a lift shaft and link slab to connect to the existing footbridge ; improvement works to an existing bus lay - by adjacent to the footbridge ; and associated road, drainage and landscape works

    工程主要包括在橫跨青山公路近的現有行人天橋nf85拆除現有臺階斜道興建升降機槽及連接臺以連接該現有行人天橋改善近該行人天橋的巴士及相關的道路排系統和環境美化工程。
  2. Based on the discuss of the geologic environment of the high slope of spandrel groove jinping i hydroelectric power station. and the engineering geological conditions of rock mass are carefully studied in the paper. the modified csmr are adopted to perform the classification of the slope rock mass, the results of which are combined with the macroscopic stability of the high slope. on the basis of these, the methods of geological diagnosis and the finite element analysis are applied to analyze and compute the overall stability of the high slope

    本文在闡明錦屏一級壩區巖體的形成和演化特徵的基礎上,詳細研究了拱肩槽高坡巖體的結構特徵及岸坡巖體淺表生改造特徵,建立了岸坡巖體淺表生改造與岸坡演化模式,分析研究了巖體的物理力學性質,採用修正的csmr法對拱肩槽高坡的巖體質量進行分級研究,在此上基礎之上,採用地質分析判斷和有限元分析等方法,對高坡整體穩定性進行了系統分析、計算與評價;應用塊體理論對高坡的局部穩定性進行了分析計算,確定局部不穩定塊體的規模、出露范,從而對拱肩槽高坡的局部穩定性有了系統全面的認識和了解。
  3. In another companya lucky one, for not all had vodkathe soldiers stood in a group round a broad - shouldered, pock - marked sergeant, who was tilting a keg of vodka, and pouring it into the covers of the canteens held out to him in turn

    在另一個更走運的連隊里,不是人人都有伏特加酒,士兵們擠成一團,在那麻面肩寬的上士周,這名上士側著小桶,向那依次地擱在手的軍用壺蓋子中斟酒。
  4. Take route 610, 614, 615 & 721 and alight at tuen mun fung nin road stop or

    乘輕鐵610 、 614 、 615及721線,于輕鐵豐年路水邊圍站落車
  5. Take route 610, 614, 615 & 721 and alight at tuen mun fung nin road stop or shui pin wai stop

    乘輕鐵610 、 614 、 615及721線,于輕鐵豐年路水邊圍站落車
  6. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石堰基礎處理與施工技術;大江截流上下游土石堰平拋墊底研究;二期堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及力學、高坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  7. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石堰基礎處理與施工技術;大江截流上下游土石堰平拋墊底研究;二期堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及力學、高坡穩定、混凝土襯砌墻的結構與支護研究;特大型輪發電機組的科學研究。
  8. Based on the simplified structure of rock mass, flac ( superscript 3d ) numerical modeling technique is used to systematically analyze the distribution features of the secondary stress field, strain field and plastic zones in the surrounding rock mass of the underground cavities after the excavation

    摘要在巖體結構模型概化的基礎上,採用flac (上標3d )數值分析方法,系統研究了瀾滄江某大型大跨度、高墻地下洞室群開挖完成後巖的二次應力場、變形場和塑性破壞區的變化特徵。
  9. By the data observed on - site, it indicate that the reinforcing plan which the plant to disembark and the dam to be connected has solved the problem that the plant to disembark occurs resonance vibration with the frequency of the turbogenerator units, but the problem of resonance vibration of the downriver structure of the plant has not been solved, hence the study of the reinforce structure of the downriver plant must be made

    廠房在此長期嚴重的振動下,立柱出現平周裂縫,門窗墻壁也均產生裂縫,威脅到電的安全運行。現場測試表明上游廠壩間在一定范內連接加固,雖然解決了廠房上游一階頻率與轉頻的共振問題,但對下游結構作用不明顯,因此需要對廠房下游結構的加固作進一步的研究。
分享友人