水閘的構築 的英文怎麼說

中文拼音 [shuǐzhádegòu]
水閘的構築 英文
lockage
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : anchor gate
  • : 4次方是 The fourth power of 2 is direction
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • : 築名詞(貴陽的別稱) another name for guiyang
  • 水閘 : water gate; water lock; penstock; dam; sluice; pen; sasse; canal-lock
  • 構築 : construct (millitary works); build
  1. Based upon the present regulation, the design and construction check and structure strength check, the electric power generation water inlet anchor gate crane platform ' s hydro - engineering structure of fushui power plant were conducted and an analysis for the reasons of building structure fracture was carried out

    摘要進行了富電廠發電進門啟閉機平臺安全檢測,依據現行規?對其建物進行了設計與施工復核、結強度復核和建裂縫成因分析。
  2. With the further economic growth and the implement of development of the western regions, hydroelectric construction in our country is undergoing rapid growth, anumber of high - dam power - station is in building or in programming. in view of its higher - head and larger magnitude of spill structure outlet, it is difficult for conventional concrete or reinforced concrete structure of pier and pier room to support its vast water pressure. coupled with the improvement of prestressed method, it has been the noteworthy tool in solving the problem

    隨著我國經濟加速發展及西部大開發戰略實施,我國電事業也迎來了迅猛發展大好時機,一批高壩電站正在建設或規劃之中,其泄物孔口及頭愈來愈大,常規混凝土或鋼筋混凝土墩結難以承受如此之大推力作用,隨著預應力技術成熟,這一技術已成為解決該問題關鍵技術措施之一。
  3. However, the condition of hydraulic structure and structural complexity gives difficulties to the reliability analysis. so the reliability make less, especially in pump station and water gate

    但是,對于具體工建可靠性分析問題,由於工結條件、工程復雜性,因此在結設計可靠性研究方面進展甚微,尤其是對泵房、工建可靠性分析研究甚少。
  4. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程科研項目,綜述三峽工程開工以來主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆方案及主要施工機械選型;混凝土原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船引航道布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻與支護研究;特大型輪發電機組科學研究。
  5. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程科研項目,綜述三峽工程開工以來主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截流計算機科學管理;大壩混凝土澆方案及主要施工機械選型;混凝土原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋混凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船引航道布置、輸系統及力學、高邊坡穩定、混凝土襯砌墻與支護研究;特大型輪發電機組科學研究。
  6. Ordinary it takes over 30 % cost of total irrigation buildings. in seasonal frozen soil area, frozen heave produces frozen - heave forces on the slab - foundation. it often make the slab - foundation damage due to bending, twisting and growth - up if the construction is build following non - frozen soil design methods

    季節凍土區涵工程是利工程建設中常見一種結,一般占工建物工程造價三分之一以上,在季節凍土區由於土凍結后產生凍脹,對板基作用有凍脹力,所以按照融土壓力設計板基經常發生彎曲、扭轉、上抬等破壞。
分享友人