  1. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大工程經驗的基礎上,結合蓮花站在1995年及1996年導流渡汛工程措施設工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  2. Brings forward the basic network cell model of symmetrical blast vault and asymmetric blast vault. then studies and analyses airflow in vault of main voltage switchyard hall of xiluodu hydropower station which is far cry and large numbers of airflow conflux, brings forward concept of “ virtual embranchment ” and corresponding basic network cell model, regresses calculate expressions of flux uniformity coefficient and impedance of “ virtual embranchment ” of vault of main voltage switchyard hall of xiluodu hydropower station

    而後又採用cfd數值模擬的方法對溪洛渡站主變洞排風拱頂這種多股氣流匯流的長距離通道內的氣流流動進行了分析,提出了「虛擬分支」的概念和相應的網路基元模型,並回歸得到了溪洛渡站主變洞排風拱頂各個排風「虛擬分支」風均勻系數以及阻抗的算公式。
  3. Verification regulation of ion chamber dosimeters used in radiotherapy

    治療離室劑檢定規程
  4. Based on the demand of power department, a full distributed multifuncitional monitoring device is studied. this instrument not only can measure the data of hydroelectric plant, but also integrate the funcition of control the dynamotor, by cooperate with the program of epigynous system, it can realization the auto generate electricity on the hydroelectric plant and ordinal startup - stop of the dynamotor. 2 furthermore, performance of integrated dft arithmetic enhances the acturacy and reliability of measure. by communication several devices can run online to be controlled dispersedly and managed centrally

    本文分析了國內外站自動控制裝置的研究和發展狀況,尤其是國內小型站的自動化現狀,針對現有力部門的需求,設並實現了一種單元式的微機自動監控裝置,該裝置不僅實現了對站內各種模擬參數和數字信號的實時監測功能,還對輪發機組進行了調控,通過與上位機處理程序的配合,可以實現站的自動發控制、機組順序啟停;在測機組機端壓和流參數的時候,採用32點離散傅立葉演算法( dft ) ,增加了測的準確性和可靠性;通過通訊可以實現裝置的聯網運行,做到「分散控制、集中管理」 。
  5. Comparing with the method of equal differential increment rate, dcpm - fga has better optimization quality. the agc software of hydropower station based on dcpm - fga can reduce water consume, and enhance the economic performance of hydropower stations

    實例算結果表明,與等微增率方法相比,基於dcpm - fga的站agc具有更好的優化品質,能有效降低損耗,提高站的經濟效益。
  6. The method that measuring horzontal component of the earth magnetic field with digital quantometer is introdnces, the computational formule are given, systematic error are discussed, the advantages of the this method with tangent galvanometer measuring horizontal component of the earth magnetic field are simply expounded

    摘要介紹了用數字沖擊地磁場平分的方法,給出了算公式,對系統誤差進行了討論,簡述了該方法與用正切法測地磁場平分的優點。
  7. They include : a aluminium tank for underwater weighing, spirometers, an on - line data acquisition system for evaluating respiratory gas exchange, a heavy duty, over - sized treadmill, mechanically braked and electrically braked cycle ergometers, automated blood chemistry analysers, telemetry heart - rate monitors, core temperature monitoring system, and ibm compatible and macintosh computers

    這些儀器包括下稱重測試系統、肺活、即時呼吸系統分析儀、加長跑臺、功率自行車、自動血液生化分析儀、遙感心率表、體內核心溫度監測儀、 actigraph加速度、 mrx標儀、以及相應的腦設備。
  8. The square pattern has been obtained for the first time in dielectric barrier ar / air discharge at atmospheric pressure by using the double water electrodes and its spatio - temporal dynamics is measured by optical method. the phase diagram of pattern types as a function of air concentration and applied voltage by fixing other parameters is given

    本論文採用特殊設的雙極介質阻擋放實驗裝置,首次在氬氣與空氣的混合氣體中獲得了大氣壓常溫下的穩定正方網格斑圖,並對其進行了時空動力學測
  9. Built up the optimal compensation regulation model of cascade hydropower stations for water resources system in the main stream of the yellow river, adopted poa method to solve optimal model in order to analysis water supply and generation electricity compensation benefits, discussed its distribution project and implementation countermeasures

    本論文主要針對黃河幹流資源系統建立幹流梯級庫、站補償調節優化模型,採用逐步優化演算法( poa )求解模型,定分析算了黃河幹流以及補償效益,探討了黃河幹流補償效益的分配方案和實施對策。
  10. Static benefits are generated from peaking and valley - filling, which are further divided into capacity benefits and coal saving benefits. dynamic benefits come from its fast starting and flexible operation, including frequency regulation, synchronous condenser operation, fast coverage of steep load gradient and synchronous spinning reserve. as for the calculation of static benefits of pumped storage plant, the alternative coefficient method is normally adopted at present

    目前在抽蓄能站的靜態效益算中,一般採用替代系數法,即用抽蓄能站的裝機容乘以容替代系數( 1 . 05 1 . 1 )算抽蓄能站的替代容;用抽蓄能站的發乘以替代系數( 1 . 05 )算替代站的發,再根據循環效率的大小算抽蓄能站的燃料消耗。
  11. Relating closely to the main problem of the high sidewall and wide span underground cavities excavation stability of xiluodu hydroelectric project, the evolution characters of geo - stress field in deep - cutting gorge and the whole features of the stress field, strain field and plastic failure zone around the underground chambers after excavation are studied systematically in the dissertation, based on a great deal of data gathered in field investigation and taking the flac3d v2. 0 software as basic computation tools. meanwhile, in the course of research, the new methods of dynamic numerical simulation are summarized and applied. furthermore, the effects of rock mass qualities, initial geo - stress field and excavation procedure on surrounding rock mass stability are discussed

    本文緊密結合溪洛渡工程大跨度、高邊墻復雜地下廠房洞室群,施工開挖過程中和開挖后圍巖穩定性研究這一重大課題,在詳盡的野外地質調查工作和對大基礎地質資料的整理與分析基礎上,以目前國際工程地質界公認的最新通用軟體flac ~ ( 3d ) 2 . 0版作為基本算工具,從整個壩區地應力場的研究開始,通過動態數值模擬分析這一新的模擬思路,系統地研究了深切峽谷區地應力場多階段的特徵和演變規律,進而對左、右岸地下廠房洞室群開挖全過程中圍巖應力場、變形場和塑性破壞區的變化特徵,進行了全過程動態數值模擬研究,並詳細討論了圍巖質、初始地應力場、施工開挖順序對大型地下洞室群圍巖穩定性的影響。
  12. Di - on electric one of the beijing hi - new - tech enterprise develop and manufacture lots of equipment like sf6 dewpoint meter dp100, cable fault location system cfl6000 and more. di - on electric supply the most advanced technology and equipment on such as gis surge arrestor on line monitoring, resistance measuring, ac dc metrology, thermal - temperature bridge, power transformer diagnostic and testing, cable diagnostic and fault location, sf6and oil moisture measuring, oil treatment and testing, optic fiber temperature monitoring, circuit breaker testing, relay testing and more

    迪揚氣在gis和避雷器的帶測試與故障診斷分析,纜的故障定位與局放檢測,變壓器抗器的各種測試診斷與溫度監測, sf6的分測與回收,絕緣油的測試分析與濾油處理,紅外測溫與光纖在線測溫,以及各種阻測試與,溫度等方面擁有世界一流的技術與成熟的儀器設備。
  13. The correlated degree of the density of deformed and failured masses and correlative dynamic force factors in tiger - leaping gorge reach are analyzed by effect measure analysis method which combines qualitative and quantitative analysis, and the key dynamic factors of bank - slope stability are established, which can provided the scientific information for origin division, evaluation, prevention of geological hazards and project planning

    本文採用定性與定相結合的效果測度分析方法,對虎跳峽河段岸坡變形破壞密度與相關動力因子進行關聯度化分析,從而確定了影響岸坡穩定的關鍵性動力因子,可為開發中的岸坡災害成因類型劃分、危險性評價、災害治理和工程規劃設等提供科學依據。
  14. This paper elaborates the parameters selection of the 700mw turbine for laxiwa power station located upstream yellow river, which is coming into construction soon. through statistical calculation of specific speed for turbines with large capacity, high operating head in domestic and oversea power station, utilizing turbine homologous theory. adopting regression statistic calculation method, it has got specific speed statistic equation., the demonstration of primary parameters selection, and the primary target parameters suitable for laxiwa power station

    本文針對黃河上游即將開工建設的拉西瓦站700mw輪機的參數選擇進行了研究,通過對國內外的大容、高輪機的比轉速統算,利用輪機的相似理論,採用回歸統算方法,統出了比轉速統方程,並進行了輪機主要參數選擇論證,提出了適合拉西瓦輪機的主要目標參數。
  15. Water loss calculation and check for liujiaxia hydropower plant

    劉家峽廠空耗算及考核
  16. And study the quantified methodology of self - restraint the source, the soil erosion reducing, the soil nutrient prediction and reservoir mud alluvial prediction, and applies the model count the water conservation benefit in lingchuan county magedang experimental unit in shanxi province

    並分別探討了涵養源、減少土壤侵蝕、減少土壤養分流失及減少庫泥沙淤積的效益算方法,以山西省陵川縣馬屹當小代燃料試點工程為例進行了土保持效益的實例算。
  17. Based on the discuss of the geologic environment of the high slope of spandrel groove jinping i hydroelectric power station. and the engineering geological conditions of rock mass are carefully studied in the paper. the modified csmr are adopted to perform the classification of the slope rock mass, the results of which are combined with the macroscopic stability of the high slope. on the basis of these, the methods of geological diagnosis and the finite element analysis are applied to analyze and compute the overall stability of the high slope

    本文在闡明錦屏一級站壩區巖體的形成和演化特徵的基礎上,詳細研究了拱肩槽高邊坡巖體的結構特徵及岸坡巖體淺表生改造特徵,建立了岸坡巖體淺表生改造與岸坡演化模式,分析研究了巖體的物理力學性質,採用修正的csmr法對拱肩槽高邊坡的巖體質進行分級研究,在此上基礎之上,採用地質分析判斷和有限元分析等方法,對高邊坡整體穩定性進行了系統分析、算與評價;應用塊體理論對高邊坡的局部穩定性進行了分析算,確定局部不穩定塊體的規模、出露范圍,從而對拱肩槽高邊坡的局部穩定性有了系統全面的認識和了解。
  18. Standard test methods for water in crude oils by coulometric karl fischer titration

    卡耳費瑟滴定法測定原油中的標準試驗方法
  19. Aiming at mulongtan hydropower station, this paper introduces the meaning of and protection about the temperature of hydro - generating units, the system composition, the configuration and work elements of sensors anti instrument, the means of realization with plc for temperature protection, and puts forward several measure of enhancing the temperature control system

    摘要輪發機組溫度的監測是機組安全運行的重要保證,是算機監控系統監測的重要參數,介紹了木龍灘輪發機組溫度測和溫度保護系統的一般組成模式,測溫傳感器、儀表的配置與工作原理,及採用plc實現溫度保護的方法,並提出了提高溫控系統可靠性幾點措施。
  20. In the power market, reasonable annual forward electric quantity constucted. is an important guarantee of anticipated profits of the owner " ertan hydropower development company "

    力市場環境下,合理地制定該站的年期貨劃是二灘公司實現其預期效益的重要保證。