水電 的英文怎麼說

中文拼音 [shuǐdiàn]
水電 英文
hydroelectricity; hydropower; water and electricity
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  1. Stability analysis on adjoining rock of large - scale underground chamber group of suofengying hydropower station

    索風營水電站大型地下洞室群圍巖穩定分析
  2. After long - term synthetic action of these factors, the complicated rock mass in the right dam foundation come into being. the adjoining rock engineering geological classification of water - conservancy and hydraulic - power project reconnaissance code ( gb50287 - 99 ), geomechanic system ( bieniawski, 1973 ), rock mass quality index z ( xiaowang, 1995 ), artificial neural network and field classification were used in the rock mass quality classification

    本文採用水電工程地質勘察規范( gb50287 - 99 )的圍巖工程地質分類、巖體rmr分類( bieniawski , 1973 ) 、巖體質量指數z分級(小灣, 1995 )以及人工神經網路分類,對壩區巖體按其基本指標作出定量化評分、分級。
  3. This thesis tries to solve the problems in the design and construction of jinping cascade 2 hydropower station. a typical section is selected to analysis seepage, seepage control and fem numerical simulation. the influence of different plans of excavation and support on seepage field of subsurface water and stability of adjoining rock are studied. the homologous support pattern is suggested according to the research results

    本文就錦屏二級水電站(一期)深埋長隧洞的設計和施工中面臨的一些問題,選取隧洞的一個典型斷面進行滲流、滲控分析和開挖及支護的有限元數值模擬,從而就深埋隧洞不同的開挖及支護方式對地下滲流場及圍巖穩定性的影響和所應採取的支護措施等方面進行了探索、研究。
  4. The analysis of applying antibiotic the most frequently used medicines were those for balancing water, electrolite, acid and alkalescence ( 28. 8 % ) in the body, and followed by anti - infection ( 15. 3 % ) and vitamin ( 9. 8 % )

    手術病人抗生素應用分析使用頻率最高的藥品是調節解質和酸堿平衡類藥,佔28 8 ,其次為抗感染藥,佔15 3 ,第三位是維生素類藥品,佔9
  5. Considering amendatory forecast runoff value will affect the operation strategy, a step - by - step decision method is proposed, which is useful for manager ' s making an optimized decision. the mid - long runoff forecast system of longxiriver is developed with the c + + language

    ( 5 )考慮徑流預測值修正後對水電站運行策略的影響,提出了水電站優化調度的滾動決策方法,為水電站及其庫最優運行策略的採用提供依據。
  6. Proposed acquisition of hydro - power plant hong kong, september 9, 2002 - aminate manufacturer, kingboard chemical holdings limited sehk : 148 " kingboard chemical " today announces its non wholly - owned subsidiary, kingboard copper foil holdings limited ses : kbcf " kingboard copper foil ", has signed a memorandum of understanding with yingde city people s government to acquire the fixed assets of a 72mw hydro - power plant in yingde for rmb700 million

    覆銅面板生產商建滔化工集團香港聯交所: 0148建滔化工今日宣布其附屬公司建滔銅箔集團有限公司新加坡交易所: kbcf建滔銅箔與英德市政府簽訂一項諒解備忘錄,建議收購英德市白石窯7 . 2萬千瓦容量水電廠的固定資產,總代價為人民幣七億元。
  7. Taiwan taichung baseball field s night illumination facility, water electricity construction

    省立臺中棒球場夜間照明設備水電工程
  8. Taiwan taichung baseball field s night illumination facility, water & electricity construction

    省立臺中棒球場夜間照明設備水電工程
  9. Bda is equipped with advanced facilities for international telecom, water, electricity, natural gas, steam, heat, and separate drainage systems for sewage and rainfall

    開發區建有高平的國際通訊設施和水電天燃氣蒸汽熱源等管線站所及雨污分流的排系統。
  10. Rates include : television, bed linen, heat and electricity

    -設備包括:視,床單,暖氣和水電
  11. Industrial limited company of electrical machinery of branch water makes the arc arc welding generator of three - phase direct current professionally, exempting and is shocked by electricity the dangerous advantage, stop the worker fitting the accident and happenning, 200 to 600 amperes are complete in specifications

    水電機工業有限公司專業製造三相直流焊機,擁有免遭受擊危險優點,杜絕工安事故發生, 250至600安培規格齊全。
  12. Sparq panchiao and fang - san submarine cable station, telecommunication control room s water electricity construction

    新世紀資通板橋信枋山海纜站機房水電工程
  13. Sparq panchiao and fang - san submarine cable station, telecommunication control room s water & electricity construction

    新世紀資通板橋信、枋山海纜站機房水電工程
  14. On the basis of collecting and arranging a large amount of projects experience, conbined with construction diversion flood passing measures design and hydraulic model test of lihua hydraulic pawer station in 1995 and 1996, the dissertation studies the issues related with characteristics of concrete face rockfill dam including the selection of construction diversion flood passing standard and measures, flood passing during construction period and embankment stage, coffer dam design, construction scheme and general schedule etc. and present preference for project construction

    本文在搜集整理大量工程經驗的基礎上,結合蓮花水電站在1995年及1996年導流渡汛工程措施設計及工模型試驗,對混凝土面板堆石壩的導流渡汛標準、導流方式及其選擇、施工期渡汛及壩體填築分期、圍堰設計以及施工方案及總進度等與混凝土面板堆石壩特點有關的問題進行研究,為工程建設提供一定的參考。
  15. Network for theory, history and criticism of architecture. mission statement, archive and colloquia

    -提供建築資訊建築論文建築圖紙建築圖庫水電建築結構法律法規資料。
  16. The following are the large projects undertaking by haifeng company : crude oil electricity plant project of north china oil field hydroelectricity factory, apartment ( 22 stories ) of yuanda real estate company of dalian shipping group, helios hotel of helios group in dalian development zone, tilt aqueduct bridge of shanxi hongqi reservoir ( total span : 267m ), supply and sale building and city construction building ( both are antique architectures ) of shanxi heyang city, sea drainage pipe of hainan fudao fertilizer factory ( 1520 ), 8 oilgas docks of hainan haiyan oilgas company, basha condensable gas transfer station of haiyan company, 10, 000m3 oilgas storage tank of arco company ( usa ) in hainan nanshan, gas pipe and fuel gas installation project of hainan nanshan electricity co., ltd, base and accessory project of hainan gas company, bei da huang cereal and oil market in harerbin, hainan cross island pipe, changhuajiang river pipe crossing project, taihangshan mountain earthwork project ( the 19th section of west - to - east gas transmission project )

    海南海峰公司承建大的工程項目:華北油田水電廠原油發站工程;大連船泊集團遠達地產公司的遠達公寓( 22層) ;大連開發區香港太陽神集團的太陽神大酒店;陜西紅旗庫斜拉渡槽工程(全跨267m ) ;陜西合陽供銷大樓及城建大樓(均為仿古) ;海南富島化肥廠排海管線( 1520 ) ;海南海燕油氣公司八所油氣碼頭;海燕公司白沙液化氣中轉站;海南南山美國阿科公司儲油氣萬立米大罐工程;海南南山力股份有限公司天然氣管線及燃氣安裝工程;海南南海天然氣有限公司基地及配套工程;哈爾濱北大荒糧油批發市場;海南環島管線;昌化江穿越工程;西氣東輸十九標段,太行山土石方工程。
  17. Brings forward the basic network cell model of symmetrical blast vault and asymmetric blast vault. then studies and analyses airflow in vault of main voltage switchyard hall of xiluodu hydropower station which is far cry and large numbers of airflow conflux, brings forward concept of “ virtual embranchment ” and corresponding basic network cell model, regresses calculate expressions of flux uniformity coefficient and impedance of “ virtual embranchment ” of vault of main voltage switchyard hall of xiluodu hydropower station

    而後又採用cfd數值模擬的方法對溪洛渡水電站主變洞排風拱頂這種多股氣流匯流的長距離通道內的氣流流動進行了分析,提出了「虛擬分支」的概念和相應的網路基元模型,並回歸得到了溪洛渡水電站主變洞排風拱頂各個排風「虛擬分支」風量均勻系數以及阻抗的計算公式。
  18. Journal of zhejiang water conservancy and hydropower college

    浙江水電專科學校學報
  19. Krtc cr3 s water electricity environment control constriction under construction

    高雄捷運標水電環控工程在建中
  20. Krtc co3 s water electricity environment control constriction under construction

    高雄捷運co3標水電環控工程在建中
分享友人