水面以上 的英文怎麼說

中文拼音 [shuǐmiànshàng]
水面以上 英文
above the surface of the water
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : 上名詞[語言學] (指上聲) falling-rising tone
  • 水面 : the surface of the water; table水面操縱 surface manoeuvering; 水面導航 surface navigation; 水面發...
  1. The bridge has a 100 ft vertical clearance over the river in the canyon.

    橋梁在深谷水面以上的垂直凈空為100英尺。
  2. " fog, mist " haze are all water vapor at ground level and above.

    「fog,mist,haze」均為地及地蒸氣。
  3. Laird assured us that the hydrofoil fin makes the board glide above the water

    萊爾德向我們保證翼可讓板在水面以上滑行
  4. The segment of the boundary above the water table and below the phreatic surface is called the seepage face.

    水面以上和潛下的一段邊界叫做滲出
  5. According to the hong kong observatory s tidal records at the tai po kau tide gauge station, the highest sea level was 2. 94 metres above chart datum on that day

    根據香港天文臺大埔?測潮站的記錄,當日的最高位為海圖基準2 . 94米。
  6. The focal plane of the light is 200 feet above mean sea level, and in clear weather it should be seen at a distance of 23 nautical miles

    燈光的焦平位於平均海平200尺,如天氣清朗,遠至23海里的域也能看見。
  7. The tidal predictions are for victoria harbour and the tide heights are in metres above chart datum

    潮汐預報是維多利亞港為準。潮高度為海圖基準高度,米為單位。
  8. Tide height is in metre above the chart datum which is 0. 146 m below the hong kong principal datum

    高度為海圖基準高度,米為單位。香港的海圖基準在主平基準下0 . 146米。
  9. Water level in the tolo harbour was as high as 5. 4 metres above chart datum as compared with the normal high tide of 2. 2

    吐露港的潮高度竟達海圖基準5 . 4米,而正常的漲潮只有2 . 2米。
  10. Tide height is in metre ( m ) above the chart datum which is 0. 146 m below the hong kong principal datum

    高度為海圖基準高度,米為單位。香港的海圖基準在主平基準下0 . 146米。
  11. Their feet strapped in snowboard boots two feet above the water

    他們的腳用皮帶捆在水面以上兩英尺的滑雪靴里
  12. Their feet strapped in snowboard boots two feet above the water.

    他們的腳用皮帶捆在水面以上兩英尺的滑雪靴里. .
  13. Uninterrupted pedestrian connection from the statute square to the waterfront would be provided through the site. - the maximum building heights of the 4 " waterfront related commercial and leisure uses " sites are 15 mpd 2 storeys for the " ou " site, 25 mpd 4 storeys for the two " ou " sites and 13 mpd 1 storey for the " ou " site

    至於4幅"與海旁有關的商業及休憩用途"土地的最高建築高度為: "指定用途1 "地帶為主平基準15米兩層高2幅"指定用途2 "地帶為主平基準25米四層高,及"指定用途3 "地帶為主平基準13米一層高。
  14. 2. import and look for tailors, improve the quality of employees, pay attention to personnel training by the means of import and export, try to make twenty - five to thirty percent of the workers reach the level of technician. our leaders are tending younger, knowledge and internationalized. add the investment in technology, improve the technology quantity and investigate speed of our product to realize the goal that from the mainland market to the international market

    努力培養引進相應人才,在今後五年中一方要加強內部員工培訓,通過引進來送出去的方式,努力使員工達到技師的占職工總數的25 % - 30 %決策層班子逐步趨向年青化知識化專業化乃至國際化,一般管理人員到達到具有大專平中高級技術職稱工程技術人員應佔全廠職工總數10 % - 15 % 。
  15. Through the analysis and calculation the conclusion can be made that during the process of the timbering of excavation, the magnitude of soil stress decreases with the increase of the displacement on the base of the still earth pressure, and the earth pressure distribution varies from the triangular distribution of the still earth pressure to other distribution with the displacement of the timbering structure. the thesis introduces the bedding coefficient in the horizontal direction varying with the soil displacement from soil - structure interaction mode, therefore calculation can be made to get more rational calculation result using elastic foundation finite element method which is the same to timbering structure both upwards and under excavation surface

    通過分析計算可得出,在基坑支護過程中,土壓力的大小在靜止土壓力值的基礎隨支護結構向坑內側位移增大而減小;土壓力的分佈由靜止土壓力的三角形分佈隨支護結構位移變化成其它分佈;由土-結構共同作用模式引入隨土體位移變化的平向基床系數,使支護結構在開挖部分同下部分一樣,均可採用彈性地基有限元法進行計算,得出更為合理的計算結果。
  16. As antirust paint for steel surface of ship hull in non - immersed areas and as container intermediate paint

    主要用於船體部分,集裝箱中間漆等鋼鐵表的防銹用漆。
  17. As antirust paints for ship hull in non - immersed areas, compatible with alkyd, phenolic and chlorinated rubber finish

    主要用於船體部分的防銹用漆,可與醇酸、酚醛、氯化橡膠漆配套使用。
  18. The spray dome formed by the explosion rose to a height of 900 feet above the surface of the water.

    爆炸時形成的噴圓頂升達水面以上約900英尺。
  19. I figured he meant it felt like it was gliding above the water

    為他的意思是它讓你覺得像在水面以上滑行
  20. The rigid limit equilibrium computation and finite element computation have been performed which concluded that the integral stability coefficient of no. 2 landslide shall be the minimum value when water level is 2145m a. s. l., then the coefficient increases slightly as the reservoir water level rises up, there exists, however, a fact that the stability coefficient of local section may tend to decrease continuously along with the rise of reservoir water level

    進行了剛體極限平衡計算和有限元計算,證明號滑坡的整體穩定系數在2145m位時最低,在此,將隨庫位升高而略增;但局部斷穩定系數有隨庫位升高而不斷下降的情況。
分享友人