水面剖面圖 的英文怎麼說

中文拼音 [shuǐmiànpōumiàn]
水面剖面圖 英文
water-surface profile
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : [動]1. (破開) cut [rip] open 2. (分辨; 分析) analyse; examine; dissect
  • : Ⅰ名詞1 (繪畫表現出的形象; 圖畫) picture; chart; drawing; map 2 (計劃) plan; scheme; attempt 3...
  • 水面 : the surface of the water; table水面操縱 surface manoeuvering; 水面導航 surface navigation; 水面發...
  1. The three - dimensional topography figures of major typical hydrothermal regions are drawn on the basis of field - measured bathymetric data of the okinawa trough and collecting a large number of data on bathymetry, multibeam and seismic profiles of other major typical hydrothermal regions

    在沖繩海槽熱液活動區實測深資料的基礎上,廣泛收集了其他典型熱液活動區的深、多波束、地震等資料,據此繪制出主要典型熱液活動區的三維地形
  2. In this paper, the finite - element numerical analysis calculation is applied to the foundation of high - rise and multi - floor building and the evolvement law of stress and displacement of tunnel used by urban traffic to explore the mutual influence between the wall rock of underground space and high - rise building foundation, taking account of the specific construction situation in the " sanmu garden " project in dadukou district in chongqing, from the perspective of underground space static - force structure stability analysis to open a underground tunnel with 6m in span and 7. 5m in height for track traffic 20m below the surface. this paper, taking considerations of three different states, i. e. the natural state without any artificial interference, the state of high - rise buildings on the surface, and the underground tunnel state with excavation for track traffic, and four plane lines and four vertical lines, analyzes and studies the distributing law of stress and displacement of calculation section from the following aspects : ( 1 ) the main stress vectorgraph, displacement distribution graph ( ux, uy ) and chromatogram graph of stress isoline ( 1, 2, xy ) of section under different states ; ( 2 ) the contrastive distribution curve of stress ( 1, 2, xy ) of different plane and vertical lines under the same state ; ( 3 ) the contrastive distribution curve of stress ( 1, 2, xy ) of the same plane and vertical lines under different states, wishing to provide references for underground space utilization and project designing and construction of the tunnel under high - rise buildings in the future

    本文結合重慶市大渡口區「三木花園」開發建設項目,從地下空間靜力結構穩定性分析角度出發,針對在該項目中涉及的高層和多層建築物以及在其地下20米處開挖了一個用於軌道交通的跨度6米,高7 . 5米的地下隧道這一具體工程情況,採用2d - 3d -有限元結構分析程序對高層與多層建築物的地基基礎及其與城市軌道交通使用的地下隧道圍巖的應力與位移演變規律進行了有限元數值分析計算,探索了地下空間圍巖與高層或多層建築物地基基礎之間的相互影響,通過考慮未受到任何人為擾動影響的天然狀態、地表存在多層或高層建築物狀態和地下開挖用於軌道交通的地下隧道狀態等三種不同狀態以及4個線和4個垂直線等不同情況,從以下幾個方具體分析研究了計算斷的應力與位移分佈規律: ( 1 )在各種不同狀態下計算斷的主應力矢量、位移分布( ux 、 uy )以及應力等值線色譜( _ 1 、 _ 2 、 _ ( xy ) )等; ( 2 )相同狀態下不同平與垂直線的應力_ 1 、 _ 2和_ ( xy )對比分佈曲線; ( 3 )不同狀態下相同平或垂直線的應力_ 1 、 _ 2和_ ( xy )的對比分佈曲線等,為今後在對地下空間的開發利用以及在高層建築物地下開挖硐室時的工程設計和工程施工提供參考依據。
  3. Figure 10 - typical section of caisson foundation for cooling water pumping station

    10 -冷卻用站沉箱地基
  4. At last, the paper presented the visualization implementation of the under working state for a cutter suction dredging simulator in detail after a brief introductions of the basic knowledge of computer graphics science. this part includes terrain visualization, interactive operations between vr model and control panel, the profile system of the dredge working state and so on

    在介紹完本文中用到的計算機形學的基本知識之後,文章詳細介紹了下視景模擬的設計方案和實施步驟,這里包括虛擬地形建模、使用vc + + 6 . 0結合opengl開發應用程序、虛擬模型與控制盤臺的交互、疏浚作業模擬等內容。
  5. Combined with practical data of shannxi lin hekou hydropower plant, the temperature filed of m and n schemes during construction and operation are simulated and analyzed. the isoline map of stable temperature field of the arch crest girder section and the vertical section in the center of arch dam, the isoline map of unstable temperature field of the arch crest girder section and the vertical section in the center of arch darn during construction and operation and the maximal and minimal temperature value during construction and operation are provided. the distribution law of temperature in the dam and the form reason of high - temperature zone are analyzed and the effect and feasibility of cooling and the zone of cooling are discussed

    結合陜西藺河口電站工程實際資料,對m方案和n方案溫度場進行了施工期和運行期全過程模擬計算分析,給出了拱冠梁和壩體中心縱準穩定溫度場等值線以及施工期、運行期拱冠梁和壩體中心縱非穩定溫度場等值線,提供了施工期逐月和運行期每年最高、最低溫度等成果,分析了壩體溫度分佈規律以及高溫區形成的原因,並探討了預埋冷卻管的效果和可行性以及預埋冷卻管的區域。
  6. Firstly, the lithologic features of bore holes in judian lake ? qingshuibo lake sedimentary area is analyzed, and five typical sections are drawn

    首先,分析巨淀湖?清泊沉積區鉆孔中沉積物的巖性特徵,繪制5個典型
  7. With the methods of parametric inputting, interactive inputting and graphic inputting, this system can build the three - dimensional models of ship and modify the model from time to time. moreover, this system can transform the models into ship line drawings that include waterline drawings, transverse section drawings and vertical section drawings

    在此基礎上,本文利用參數化輸入、人工互動式輸入和形導入等多種方法建立船舶的立體模型,並能實時編輯修改;進一步地,系統能夠由三維模型反演出型線,即、橫、縱
  8. Figure 7 - typical section of rock fill mound foundation for cooling water pumping station

    7 -冷卻用站毛石堆地基
  9. It is found that the degree of mineralization and metamorphic coefficient and conversion potential of formation water, the fault is zone of sluicing of atmospheric infiltration water flowing from basin west margin to east ( centripetal flow ) and sedimentary compaction water flowing from qija gulong depression to west ( centrifugal flow )

    通過地層礦化度和變質系數等參數的分佈規律及一系列折算的分析發現,該斷裂對是不封閉的,並且是盆地西緣大氣滲入向東流動(向心流)及齊家古龍坳陷沉積壓實向西流動(離心流)的共同泄帶。
  10. According to theories of hrm, the paper applies positivism to study hrm situation in lin shui power plant ( lspp ), and finds out main problems. though detail analysis, author takes into concrete situation of lspp an effective hrm system is designed for the enterprise and can be used for reference by the other enterprises with meddle and small in scale, which start an undertaking. in section 1, lspp and its hrm are introduced, then the paper analyses the necessity of the redesign of hrm system in lspp

    本文試藉助現代人力資源管理理論,通過對鄰縣火電廠(簡稱鄰電廠)人力資源管理狀況的析,重點針對該廠崗位分析、績效考核、薪酬管理三個方內容,找出其人力資源管理中存在的主要問題,經過認真分析和研究,結合鄰電廠的實際情況,提出重建人力資源管理系統的思路和科學方法,同時為其他國內中小企業進行現代人力資源管理提供借鑒。
  11. The experimental study is designed to observe the flow process by use of morphological method in different kind of soils. macropore geometry is subsequently characterized by using fractal dimensions of staining patterns on horizontal cross - sections. the results prove that water flow in structured clay soils is strongly influenced by the presence of macro - pores and their geometries

    為了更深入地了解物質在多孔介質中的運移,本論文進行了土柱模擬實驗,將含顏料的分滲入不同類型的土壤中,然後對其不同深度的進行觀察,並且進行了像分析,發現顏料的分佈滿足分形特徵,分在土壤中的運移存在優勢流現象,受到大孔隙的影響很大,這與上述隨機模擬的結果是一致的。
  12. On the basic of analyzing the spatial distribution of the hydrogeologic stratum, it abstracts the concept module of the void hydrogeologic profile, and sets down the rule on making up the stratum section, it also analyses the data structure and the steps of automatic generating the hydrogeologic profile, and discusses the appliancation of component gis on the the automatic generate method

    在分析孔隙文地質層的空間分佈規律的基礎上,抽象出孔隙文地質的概念模型,制定了地層構建規則。同時,本文也分析了自動構建文地質的數據結構及其構建的具體流程,並探討了組件式gis技術在自動繪制文地質中的應用。
  13. Many bore holes in shuangwangcheng reservoir which lies in the sedimentary area are drilled and lots of terra drill data are collected. five typical sections, i. e. section i ? i, ii ? i, iii ? ii, iv ? v ' and v ? v are drawn. the vertical sedimentary sequence of this sedimentary area is divided cbmbining the granularity features of sediments

    課題組與山東省利勘測設計院合作,對湖區內的雙王城庫進行了鉆探研究,搜集了大量的地質鉆孔資料,經沉積物巖性特徵分析,繪制出雙王城庫外圍1km處圍繞庫的5個典型(即? 』 、 ? 』 、 ? 』 、一』和? 』 )的,結合沉積物粒度特徵,劃分出該沉積區的垂向沉積序列。
  14. That is the state - rtm ownership, much - centered planning economy management, modem circulation network to beestablished, the unharmonized relationship between publishing houses andbookstores, the unclear ownership, the unreasonable construction between industryand profit, the feeble market supervision and the low level of management andadministrative character. the last one of this dissertation is comprised of three sections. first, it givesthe aim of our country ' s book distribution management system, that is to say byfurthering the reform of book distribution management system, we should establisha better system of book distribution

    文章第二部分從八個方闡述和析了現階段我國書發行管理體制改革中存在的主要問題,即所有制結構的單一全民性;實行高度集中的計劃經濟管理;現代化營銷網路體系尚未建立;社店關系不順;產權不明晰;產業結構和利潤結構不合理;市場監管不力;經營管理平和人員的素質偏低。
  15. Figure 8 - typical section of driven pile foundation for cooling water pumping station

    8 -冷卻用站打入樁地基
  16. Figure 9 - typical section of bored pile foundation for cooling water pumping station

    9 -冷卻用站鉆孔樁地基
  17. And it also can not give the exact appearance place. aiming at this question, basing on studying the underground cavity in laxiwa hydroelectric station, through establishing entity model, combining model, slicing model, and vector analysis, article introduce a method of analyzing the stability of block and get the certain search. all the graph result is showed in autocad, which is a graph software

    針對此問題,本文以拉西瓦電站地下洞室為研究場所,以autocad形軟體為平臺,建立地下洞室和結構的實體模型,通過對實體模型的組合、切獲取結構的洞頂及洞壁展示,再以結構展示為基礎,應用矢量運算對塊體進行穩定性分析,並在autocad中顯示結構展示和塊體展示
  18. Hydrogeologic profile is the most intuitionistic and effectual expression of hydrogeologic stratum

    文地質文地質層在垂向上最直觀最有效的表達方式。
  19. Presently, hydrogeologic profile is mostly drew by handcraft or by some software such as cad or excel linking with some programme languages

    目前,文地質主要採用傳統的人工繪制方法或利用cad 、 excel等工具結合一些編程語言進行繪制的方法。
分享友人