水面高程 的英文怎麼說

中文拼音 [shuǐmiàngāochéng]
水面高程 英文
water level elevation
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (頭的前部; 臉) face 2 (物體的表面) surface; top 3 (外露的一層或正面) outside; the ri...
  • : Ⅰ形容詞1 (從下向上距離大; 離地面遠) tall; high 2 (在一般標準或平均程度之上; 等級在上的) above...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 水面 : the surface of the water; table水面操縱 surface manoeuvering; 水面導航 surface navigation; 水面發...
  1. For cartographical purposes heights are necessarily recorded above the geoid (sea-level).

    就制圖的目的來說,所以需記錄的出大地(海平)的
  2. What ' s more, we put forward some experienced formulas on the basis of the cortical analysis. the result of the research show that by installing diffluent piers with low ridge, we can eliminate the root of oscillatiny water jump, perfect the energy dissipation effect of water jump, also, we can improve the flow condition of down - stream. the fact that the main flow of down - stream is in the middle, not only effectively lower the speed of the bottom flow in the ridge rear, alleviate the erosion to the river bed, but also avoid the heavy wave resulted from the main flow in the surface, thus improve the surface wave of down - stream obviously. we can work out the body style parameters of diffluent piers with low ridge according to the project flow condition and experience formulas, and then reckon the down - stream surface wave condition for the protected building of the down - stream bank

    研究結果表明:設置低坎分流墩后,消除了擺動舌擺動的根源,提躍的消能效果,改善了下游流流態。下游體的主流在中部,既有效的降低了坎后流底流速,減輕流對河床的沖刷,又避免了主流位於表導致波浪過大的結果,下游的波浪明顯得到削減。依據經驗公式,可根據工流條件設計出低坎分流墩的體型參數,進而估算出下游沿波浪,為下游岸邊的砌護提供依據。
  3. Another based mathematics model about the anchor cable is used for ship - anchor system. the numerical calculation have been worked by programmed in the matlab language. at the same time the influence that the dragging speed of antisubmarine helicopter and the height over the surface of ocean acts on the shape and the tension of underwater cable, and that the current velocity and the diameter of anchor cable acts on the shape and the tension of anchor cable, has been calculated

    把建立的下拖索數學模型和錨索數學模型分別應用於航空吊放聲納探頭?纜繩動力學系統和船?錨系統,採用matlab語言編進行了數值計算,同時分別計算和分析了反潛直升機拖速、距海度對拖索形狀和張力的影響以及海流速度、錨索直徑對錨索形狀和張力的影響。
  4. The incident wave height h1 / 3 is in the range from 0. 1m to 0. 25m, and the peak period tp in the range from 1. 0s to 2. 0s. the ratio of s / h1 / 3, which refers to the subface level of wharf deck ( s ) to the incident wave height ( h1 / 3 ), is between - 0. 1 and 0. 7. three different shore connecting types : open - piled, permeable slope with armored 1ayer of dolosse b locks and impermeable slope with armored layer of concrete plate, are set in the experiment for the research on the effects of boundary condition with different shore connecting types on the wave impact

    本文的物理模型試驗在大連理工大學海岸和近海工國家重點實驗室的大波流槽中進行,試驗中選用的隨機波靶譜為改進的jonswap譜,入射波波h _ ( 1 / 3 )范圍為0 . 1m 0 . 25m ,譜峰周期t _ p范圍為1 . 0s 2 . 0s ,碼頭板的相對凈空(碼頭板底距離靜的距離s與入射波波h _ ( 1 / 3 )的比值)范圍為- 0 . 1 0 . 7 ,其中s / h _ ( 1 / 3 )為負值時表示碼頭板底位於靜以下。
  5. Because the elevation data we have acquired through gps is too variable to satisfy the mapping accuracy requirement the elevation value is solved by the water lever observation in the hydrology station and datum horizon correction of sounding observation

    由於gps的rtk模式測量所獲取的精度不能滿足測圖精度要求,因此其值是通過測量深值、結合其統一到基準的改正數、根據相關文部門各位站提供的位觀測資料綜合計算獲得。
  6. Then the periodic properties of geocenter motion in the x, y, z components are summarized. considering the statistical precision of the gps observations, the geometrical distribution of gps stations and their physical stablility, a new method to determine the parameters of geocenter motion is studied and analyzed. in order to have a better understanding of its effect on the height datum origin, the rule of geocenter motion in the horizontal and vertical components are also analyzed and some useful conclusions are drawn

    提出了將譜分析與抗差估計相結合的抗差譜分析方法,並用該方法分析了地心運動時間序列的主要周期特性;為合理地確定地心運動參數,詳細研究與分析了一種新的定權方法對求解地心運動參數的作用,該方法充分利用了gps觀測量的統計精度、點位的幾何分佈以及物理穩定性;為了明確地心運動導致的基準的變化,分析了地心運動對地點的平分量和垂直分量的影響規律。
  7. Abstract : digital basinis made from digital elevation model considering spatial variability within a catchment. on the basis of digital basin, the digital approach to describing hydrological processes within a catchment is investigated. digital hydrological model is regarded as a modern physically - based modeling technique that includes a large amount of information. the case study on the shiguanhe catchment in the huaihe river basin, intensified observation field of gewex asian monsoon experiment project, has shown that the digital mode lperforms very well not only in simulating runoff processes at any specific site, but also in simulating spatial distribution and temporal variation of hydrological elements and state variable ( especially soil moisture ), if compared with traditional hydrological models. that provides solid foundation for full use of now available observation in formation and in - depth mining of hydrological data

    文摘:考慮流域下墊空間變異性,基於數字模型構建了數字流域,並在此基礎上對描述流域文物理過的數字方法進行了探討.文章認為,數字文模型是一種有物理基礎的包含大容量信息的現代模擬技術.史灌河流域實例研究表明,數字文模型可以十分方便地輸出文要素和狀態變量的空間分佈與時間序列,這對充分利用現有觀測信息進行文信息的深層挖掘創造了條件
  8. High - qualified designers and engineers of chaowei are able to provide various high - qualified design services such as ic software program, circuit board, product appearance, products structure, and product package, etc. the factories directly under chaowei have advanced production abilities including mould making, inection moulding, surface spray - painting, silk - screening, shift - screening, smt, welding and assembling, quartz clock core production, and quality check and assurance. chaowei held many design patents and utility model patents, at the same time, national clock and watch quality certification, national technical supervision bureau certification, usa fcc and astm security authentication, canada ic, and euro ce are achieved, the rich experience in oem and odm can ensure high quality products and professional service

    超維公司擁有一批素質的專業設計師和工師,有能力為國內外客戶提供包括ic軟體編線路板設計產品外觀設計產品結構設計產品包裝設計等多方準的設計服務超維的直屬工廠則擁有模具製造注塑成型表噴漆絲印移印smt焊接裝配石英鐘機芯製造品質檢驗測試等先進的生產能力超維公司的產品擁有大量的外觀設計專利和實用新型專利,同時獲得了國家鐘表質量檢驗中心的合格證書國家技術監督局檢驗合格證書美國fcc認證和astm安全認證加拿大ic認證歐盟ce認證。
  9. This paper introduces the signif9cance of geoid refining and three methods for refining geoid, and by using the abnormal height of gps / leveling point, sets up several mathematic models of local geoid and makes the experiments and precision analysis

    介紹了大地精化的意義和精化大地的3種方法,用gps /準重合點的異常,建立了區域大地的幾種數學模型並做了實驗和精度分析。
  10. According to the result of physical modeling, the regression equation about the decrement of tidal bore height, the percentage of water - resisting area and the distance away from the upstream bridge site is constructed in this paper, the regression equation can be applied in the impact which bridge has on the tidal bore height in qiangtang esturary

    根據模型試驗結果,建立了涌潮度的減小值與中潮位橋墩阻積百分比和上游離橋址距離的多元回歸方,可供錢塘江河口建橋對涌潮度的影響計算參考使用。
  11. In general the accuracy of geoidal heights, as given by spirit leveling, much exceeds that of any other system.

    一般說來,準測量測出的大地的精度,遠遠超過任何其它方法的精度。
  12. In order to direct the water to the forebav of the pump station from the original canal, a channel long 135 m is designed. it crosses through the terrain top with a depth of more than 50 m. soil of the channel slopes is a strongly - weathered silty and sandy mudstone with many well - developed reticular cracks and takes the structural surfaces almost same as the channel slopes

    東深供金湖泵站位於塘廈鎮東,屬低山、殘丘地貌,地22 60m ;泵站前池進渠橫切山脊,連接原東深供河,設計開挖1條長135m的進渠,坡50多米,邊坡土質為強風化的粉砂質泥巖,網狀裂隙發育,結構基本與坡重合;坡體土質中含有較多的粘土礦物,具有遇軟化的特性。
  13. The no. 112 missile destroyer ship is the most modern warship with the largest tonnage and complete military devices

    112號導彈驅逐艦,是我國自行設計製造的現役噸位最大現代化度最作戰功能最全的最新型作戰艦只。
  14. Based on t213 and other observational datasets, a severe heavy rain occurred in changjiang - huaihe basins during 4 - 5 july 2003 is studied. the primary diagnostic analyses show that double or single block is the characteristics of the macroscale circulation in this rainfall process. the strong conflict of warm and cold mass, mesoscale convergence on meiyu front, shear line, and stably maintaining of high and low jets make for the rainfall

    本文採用地空常規資料,每6h一次的降資料,以及t213數值預報資料,對2003年7月4 - 5日發生在江淮地區的一次梅雨鋒暴雨過的影響系統及其可能機制進行了初步的診斷分析,發現,緯雙阻、單阻形勢是這次暴雨過發生的大尺度環流特徵;冷暖空氣的激烈交鋒、梅雨鋒上的中尺度輻合線、 700hpa 、 850hpa上的低渦、切變線以及穩定維持的低空急流是導致這場暴雨的直接影響系統;該地區維持一個能、飽和、潛在不穩定的環境,有利於特大暴雨的產生和維持。
  15. Chapter two ascertains main technological factor of dong gou lock reconstructing, including forecast the cargo and volume through the lock to reason about representative type of vessel designed for through the lock and its operation organize. chapter three design the renovate engineering through ascertaining the main technological factor scale of the lock, dimension, designed water level and altitude, including design of structure of the lock, lock chamber and lock gate, and select the main technological factor and pattern of headstock gear. chapter four draws a comprehensive compare of the two design scheme of the renovate project with engineering project economy evaluation method, and makes out the recommended scheme, and furthermore, to calculate the economic evaluation index of the recommended scheme and makes the economic sensitivity analysis of the scheme and finally demonstrate economic feasibility of the scheme

    本論文共分四章:第一章主要介紹了原東溝船閘的地理位置和營運現狀,說明了船閘在航道建設和資源綜合利用中的作用及東溝船閘改造的必要性;第二章東溝船閘改造的主要技術因素確定其中包括東溝船閘過閘貨種和貨運量發展的預測,並確定東溝船閘的設計代表船型及營運組織;第三章東溝船閘改造工設計本章通過船閘改造工主要技術參數:船閘規模、尺度、設計位和等的確定,設計了二個船閘改造方案,包括鋼筋混凝土整體塢式閘首結構、閘室和閘門的設計,並選定了啟閉機的主要技術參數和型式;第四章採用了工項目經濟評估方法對東溝船閘改造工二個設計方案進行全綜合比較后,確定了推薦方案。
  16. Abstract : variations of flow pattern, flow velocity in deep poo l and side bar, mainstream thread, and water surface, caused by excavation project, are investigated by two - dimensional mathematical model in an orthogonal curvili near coordinate system. the change of bed - load transport rate, and redeposition r ate are predicted. the influences of the excavation project on navigation are ana lyzed. grid - type and flat - type excavation alternatives are proposed and discuss ed

    文摘:採用正交曲線坐標系下的河道平二維數學模型,研究了嘉陵江何家磧邊灘采砂后河道流勢、流態、灘槽流速、主流位置、水面高程及比降的變化規律,預測了采砂方案完成後卵石推移質輸沙率變化及其對航道的影響,並對格形開挖和平整開挖方案進行了比較分析
  17. But there had phenomena that the middle surface was higher than the both sides " and even the sink bank one was lower than the convex bank one

    但彎道中也出現了中心線兩岸低的情況,甚至還有凹岸太原理工大學工碩士學位論文2低而凸岸的情況。
  18. The paper has made a comprehensive study to marine carbonate oolitic reservoir in triassic of feixianguan group of intra - platform taphrogenic trough basin in north - east past of sichuan basin. according to the principle of high resolution stratigraphic sequence, combined with original results gained form the area, the author have built up the base level cycles and fades model of different stages based on the surface identification mark of base level cycle using the information of geology, seismic, logging, core and outcrops

    1 、依據層序地層學解析度基準旋迴原理與識別技術,建立了裂陷槽向上變淺直至露出中形成的基準旋迴變化的7種特徵性識別標志,包括泥巖表乾裂、淡選擇性溶蝕、白雲化現象、白雲巖、石膏、伽瑪曲線值、向上變厚、變粗序列、向上變細、變泥、變紅序列、向上值變低序列等。
  19. ( 2 ) validate whether the crest elevation can meet the require of energy dissipation and erosion prevention during the beginning period of flood discharge. ( 3 ) calculate the altitude of downriver cofferdam, and make it meet the require of energy dissipation and erosion prevention. ( 4 ) calculate some average velocity of flow through some sections, including contracted section in stilling basins behind upriver cofferdam, if the hydraulic jump happen in lower reaches of the river. the program will calculate the average velocity of flow of contracted section and the length of the apron

    主要設計內容包括:計算上游圍堰后消力池的尺寸;驗證泄洪初期壩是否能夠滿足消能防沖需要;計算下游圍堰堰頂,使其滿足泄洪期圍堰和壩體過流的消能防沖和工進度的需要;計算部分斷平均流速,包括:上游圍堰后消力池中收縮斷的斷平均流速;壩首和壩末的斷平均流速;當下遊河道發生躍時,計算下遊河道的收縮斷平均流速及需要鋪設護坦的長度。
  20. In this paper a date from some real projects are used to analyse the facors that will affect the energy dissipation and erosion prevention. such as flood discharge across the cofferdam, crest elevation, downriver cofferdam, roughness coefficient and the gradient of the surface of dam, and so on. in this paper, the program based on hydraulics is checkout by the tankeng waterpower project in zhejiang. the results prove that this program can be used to design any project where there is no obvious side shrinking phenomena

    本文結合工實際對影響圍堰和壩體消能防沖的各種因素,包括過堰流量、壩、下游圍堰堰頂、壩糙率、壩坡度等進行了分析,並藉助力學知識和計算機語言編寫了圍堰和壩體的優化計算序,並利用浙江灘坑電站工對所提出優化計算序進行了驗證,證明了該序在沒有明顯的側收縮的影響下,計算結果與實際情況較為吻合。
分享友人