永久性工程 的英文怎麼說

中文拼音 [yǒngjiǔxìnggōngchéng]
永久性工程 英文
permanent project
  • : Ⅰ副詞(永遠; 久遠) perpetually; forever; always Ⅱ名詞(姓氏) a surname
  • : Ⅰ形容詞(時間長) for a long time; long Ⅱ名詞(時間的長短) of a specified duration
  • : Ⅰ名詞1 (性格) nature; character; disposition 2 (性能; 性質) property; quality 3 (性別) sex ...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • 永久性 : perpetual; permanency
  • 永久 : permanent; perpetual; everlasting; forever; for good (and all)
  1. Zhuzhou hydropower junction project is a large - scale project with great capital invested, and the project would impropriate the land and work on the neighborhood environment. especially when the project develops up to a certain degree, the influence would be profound. therefore, the construction and operation of zhuzhou hydropower junction project should be on the basement of sustainable development in order to meet the need of the development of economy, environment and social service

    株洲航電樞紐是一個規模大、耗資多、影響面廣的大型,它以佔用土地、影響環境為代價,特別是內河航道發展到一定度后,這種影響將更為廣泛,因此,株洲航電樞紐的建設與運營應謀求其可持續發展,以滿足移民區域及移民安置影響地區目前及將來經濟、環境、社會發展的需求。
  2. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓水流沖毛技術,大大提高了施效,減少了倉面污染;模板大量採用定型鋼模板施技術,提高了壩體混凝土成型質量和進度;在二期混凝土施區域,為免除人鑿毛勞動強度,採用免拆金屬模板網作為一期混凝土模板;鋼筋連接改進傳統的電焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提高了接頭強度和鋼筋連接速度,施安全大大加強,質量穩定有效提高,經濟成本大大降低;三峽二期持續高強度混凝土施系統的研究,使三峽成為名符其實的「世界一流」成為可能;三峽二期混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體和耐
  3. Article 31 when construction projects of a permanent nature are being erected on either side of a highway, the distance from the edge of the building facing the highway to the outer rim of the roadside ditch of the highway should be no less than 20m for state highways, 15m for provincial highways, 10m for county roads, and 5m for township roads

    第三十一條在公路兩側修建永久性工程設施,其建築物邊緣與公路邊溝外緣的間距為;國道不少於二十米,省道不少於十五米,縣道不少於十米,鄉道不少於五米。
  4. Permanent surveying markers as referred to in paragraph 1 of this article include wooden or steel signals and stone markers established at triangulation points, baseline points, traverse points, military control points, gravimetric points, astronomic points and leveling points of various orders and classes, as well as fixed markers used for topographic mapping, engineering surveying and deformation measurement, and installations at seabed geodetic points

    第一款所稱測量標志,是指各等級的三角點、基線點、導線點、軍用控制點、重力點、天文點、水準點的木質覘標、鋼質覘標和標石標志,以及用於地形測圖、測量和形變測量的固定標志和海底大地點設施等。
  5. The pre - stressed anchor supporting structure with beam and column is analyzed theoretical in this paper, combined with theoretical study and design of such supporting structure, which is one of the plan projects of construction science and technology in hunan province. the topic provides engineering aiming with practical and concise computation method, and also provides the advice for structure with proper theory foundation and schemes to some extent

    本文結合湖南省建設科技計劃項目「肋樑柱錨桿擋土墻設計關鍵問題及計算軟體開發」 ,對預應力肋樑柱錨桿支擋結構進行了理論分析,提供了適合於的、比較簡捷的實用計算方法,同時也為該類支擋結構設計提供一定的理論依據和設計建議。
  6. Based on the selection of the accelerating agents for the wet shotcrete, the applicability of the setting time for the accelerating agents got from the tests concerned are discussed herein, from which a proposal is put forward that the alkali - free accelerating agent is suggested to be preferentially applied to the wet shotcrete for the permanent project

    摘要根據濕噴混凝土速凝劑品種選擇試驗結果,討論了速凝劑凝結時間試驗結果的適用,開提出了濕噴混凝土應優先選用無堿速凝劑的建議。
  7. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽的科研項目,綜述三峽以來的主要科研成果及應用情況,包括:一期土石圍堰基礎處理與施技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施機械選型;混凝土的原材料和耐優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  8. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽的科研項目,綜述三峽以來的主要科研成果及應用情況,包括:一期土石圍堰基礎處理與施技術;大江截流上下游土石圍堰平拋墊底研究;二期圍堰防滲研究;大江截流計算機科學管理;大壩混凝土澆築方案及主要施機械選型;混凝土的原材料和耐優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  9. A solid - waste containment system can be simplified as a slope which contains a layer of geomembrane ( which is simplified as interlayer slope in the rest part ). shaking table model test and numerical analysis have been done to study the seismic stability of interlayer slope based on the two - part wedge theory in this paper. many factors which affect the slope stability ratio, including horizontal seismic coefficient, slope angle, soil - geomembrane interaction coefficient, slope length, layer thickness and soil character, have been took into consideration

    填埋場防滲基坑的邊坡可以簡化成含土膜夾層的土坡(以下簡稱夾層土坡) ,本文根據「雙滑楔體」理論思想,對夾層土坡的地震穩定問題進行了較為系統的模型試驗和數值分析,著重考慮了水平地震系數、夾層土坡坡角、土膜與覆蓋層土體摩擦系數、夾層邊坡長度和厚度、夾層土坡覆蓋層土體質等因素對土坡安全系數的影響,並對地震作用下夾層土坡的變形進行了初步的研究,給出了對實際設計有參考價值的結論。
  10. Enhancements or improvements on the self - owned land that with limited useful lives

    凡在自有土地上從事非整理改良之成本皆屬之。
  11. Article 26 a construction unit shall, in carrying out engineering construction, seek to get around permanent surveying markers ; if it is absolutely impossible to get around such markers and necessary to have them removed or rendered ineffective, the construction unit shall acquire consent from the unit that has established the permanent surveying markers, and, obtain approval from the competent department of surveying and mapping administration under the state council or from the department of surveying and mapping administration of the people ' s government of the relevant province, autonomous region or municipality directly under the central government

    第二十六條進行建設,應當避開測量標志;確實無法避開,需要拆遷測量標志或者使該測量標志失去效能的,建設單位應當取得設置測量標志單位的同意,經國務院測繪行政主管部門或者省、自治區、直轄市人民政府管理測繪作的部門批準。
  12. Under cepa ii, the residency requirement is waived for hong kong permanent residents employed as engineering technical staff and financial managerial staff. registered capital requirements for domestic and joint - venture construction enterprises remain slightly different

    根據cepa第二階段,香港服務提供者在內地設立的建築業企業中,出任技術人員和經濟管理人員的香港居民,每年在內地的居住時間不受限制。
  13. The number of department heads at or above the assistant project manager and chief engineer levels of the west rail division in the kowloon - canton railway corporation kcrc holding hong kong permanent resident status, and the number of such staff who are chinese

    九廣鐵路公司「九鐵」西鐵部的助理項目經理及總師或以上職級的主管中,有多少為香港居民及其中
  14. In this thesis, the unloading region of a typical cross section of shiplock slope of tcp is given, that is 15570 according toin - situ test and geological survey. considering the effects of excavation unloading, numerical analysis for shiplock slope is made by fem and flag. using the theory and software described in this thesis, the excavation analog and the stability analysis of the typical cross section of the three gorges shiplock high slope has been carried out

    本文選取三峽船閘邊坡的典型剖面15570剖面,根據現場試驗和地質調查確定的卸荷范圍,考慮卸荷帶巖體力學參數隨開挖過而變化,採用二維彈塑有限元法、二維彈塑顯式有限差分法進行了邊坡施開挖數值模擬。
  15. 24 " contractor equipment " means all appliances and things of whatsoever nature ( other than temporary works ) required for the execution and completion of the works and the remedyingof any defects therein, but dose not include plant, materials or other things intended to form or forming part of the permanent works

    24承包商的設備是指在實施、完成及其缺陷修補過中所需要的全部裝置和任何質的物品,但不包括預定構成或構成一部分的設備、材料或其它物品。
  16. The three gorges project is a world - famous water conservancy center project. the main parts of it are the body of concrete dam, permanent ship casket, electricity - produce department, etc. these are all large volume concrete which influence the ageing resistance of the project directly, and they also have much to do with ( he concrete of moderate heal portland cement armature and concrete aggregate, etc

    長江三峽,是舉世矚目的特大型水利樞紐的主體:混凝土大壩壩體、船閘,發電廠房等均為大體積混凝土,這些混凝土的耐既與施質量有直接關系,也與組成壩體的小熱硅酸鹽水泥、骨料、鋼筋等原料有密切的關系。
  17. The soil nailed support system for deep foundation pit supporting and slope stability has got more application for its advantages, such as easy to implement, safe and less investment. this technology for temporary and permanent structures is currently growing with increasing local experience, and many countries increasingly recognize its specific advantages, especially for stabilization of railroad and highway cut slopes

    在基坑開挖支護中,土釘支護作為臨時支護有突出的經濟技術能,具有很大的推廣應用價值和潛力,並且除了作為臨時支護使用外,也可作為一種能可靠的擋土,在鐵路、公路的建設中也有著廣闊的應用前景。
  18. After the engineering slope was dug, several small plastic zone the designed rock - fill dam will coming in the temporary slope, because rock - fill dam change the stress field on a small degree. but a gravity dam will arouse a great area of plastic zone in the permanent slope, which will bring a stability problem. after detail and depth study, the rock - fill dam project is more compatible of the engineering geology condition in nuozadu hydraulic - power station ' s dam site

    邊坡開挖后,擬定的堆石壩方案由於嵌入淺,應力的調整有限,塑區主要分佈在壩頂高附近的較小范圍內;而擬定的重力壩方案,由於嵌入深,引起了一定度的應力調整,邊坡巖體表層產生了鬆弛變形,塑區主要分佈在壩頂高到坡頂前緣(邊坡)的v ivb類巖體分佈區。
  19. The high rock slope of permanent shiplock is important part of the three gorges project. this article analysed comprehensively the engineering geology condition, deformation and stability of the high rock slope

    以三峽船閘高邊坡為研究背景,結合前期勘測和一、二期開挖施實際,綜合分析了船閘地質條件、邊坡變形及穩定等。
分享友人