永久電流 的英文怎麼說

中文拼音 [yǒngjiǔdiànliú]
永久電流 英文
permanent current
  • : Ⅰ副詞(永遠; 久遠) perpetually; forever; always Ⅱ名詞(姓氏) a surname
  • : Ⅰ形容詞(時間長) for a long time; long Ⅱ名詞(時間的長短) of a specified duration
  • : Ⅰ名詞1 (有電荷存在和電荷變化的現象) electricity 2 (電報) telegram; cable Ⅱ動詞1 (觸電) give...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • 永久 : permanent; perpetual; everlasting; forever; for good (and all)
  • 電流 : current; galvanic current; electric current; electricity; current flow電流保護裝置 current protec...
  1. To avoid manual labor of chiseling - grossness, in the area of second - stage concrete construction, permanently non - removed metal molding boards nets are used as molding boards of first - stage concrete. substitution joints of reinforcing steel bars for traditional electric welding and usage of equipments for joints of reinforcing steel bars efficiently improve strength of junctions and rate of connecting reinforcing steel bars, and safety of construction and stability of quality, and greatly reduce cost. it ' s possible that three gorges project become top - ranking project in the world by study on systems engineering of high - strength concrete construction

    混凝土縫面處理採用高壓水沖毛技術,大大提高了施工工效,減少了倉面污染;模板工程大量採用定型鋼模板施工技術,提高了壩體混凝土成型質量和工程進度;在二期混凝土施工區域,為免除人工鑿毛勞動強度,採用性免拆金屬模板網作為一期混凝土模板;鋼筋連接改進傳統的焊連接方式,採用大量採用鋼筋接頭機械連接技術,有效提高了接頭強度和鋼筋連接速度,施工安全性大大加強,質量穩定性有效提高,經濟成本大大降低;三峽二期工程持續高強度混凝土施工系統工程的研究,使三峽工程成為名符其實的「世界一工程」成為可能;三峽二期工程混凝土溫控綜合技術的應用,有效降低了壩體混凝土溫度的產生;混凝土表面處理及裂縫處理技術的應用,提高了建築物的整體性和耐性。
  2. A fault current limiter using permanent magnets has been designed and its performance simulated using a twodimensional time - stepping finite - element method incorporating a model of hysteresis for hard magnetic materials

    摘要按磁鐵設計製成的故障限制器,性能是靠含有硬磁材料的磁滯模型的2維時間分級有限元件方法獲得的。
  3. Unified power flow controller ( upfc ) is one of the most powerful and most promising controllers of facts. if we use upfc to control the transmission parameters, terminal voltage, line impedance and phase angle in normal situation and use it to compensate zero sequence and negative sequence currents when one of transmission lines is cut off, we can implement two phases operating in high voltage transmission lines, which can improve stability and reliability for the transmission system

    統一潮控制器( upfc )是功能最強、最具發展潛力的靈活交系統( facts )控制器之一,如果在常規條件下,用upfc實現輸線路的壓調節、移相、潮控制、阻尼振蕩等功能,在發生單相性接地或單相斷路故障時,由傳統的三相跳閘改為單相跳閘,用upfc的並補來濾除兩端系統的零序和負序,用upfc的串補來提高輸線的傳輸功率,以實現兩相長期運行,那麼輸系統的穩定性、可靠性將大大提高。
  4. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發機組的科學研究。
  5. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽工程的科研項目,綜述三峽工程開工以來的主要科研成果及工程應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截上下游土石圍堰平拋墊底研究;二期圍堰防滲工程研究;大江截計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;船閘的引航道布置、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發機組的科學研究。
  6. When the voltage exceeds the breakdown strength for a given insulation system, undesirable conduction paths will be created and the system will be either temporarily or permanently disabled

    壓超過確定絕緣系統的擊穿值時,將出現預料之外的路徑而且這個絕緣系統將暫時或地停止作用了。
  7. Bonding is the permanent joining of metallic parts to form an electrically conductive path that will assure electrical continuity and the capacity to conduct safely most any current likely to be imposed on it

    接合是金屬部分的一種性連接從而形成一個子導通道,確保子連續性以及容能夠更為安全地引導可能施加在金屬表面的任意
  8. Typically, permanent virtual circuits are set up between multiple backbone switches and between switches and devices with heavy network traffic

    一般而言,性虛擬路建在多個主幹網交換機之間和交換機與網路信息量大的設備之間。
  9. Firstly in the paper the research of hydraulic characters and the optimize of structure have being carried out on the four bigger design schemes of permanent internal dissipation discharge tunnel reconstructed from the right bank ' s diversion tunnel of gongboxia power station with a method of theoretical analysis combined with test comparisons. on this basis, two form swirling flow internal dissipation schemes, vertical and horizontal axis are recommended to the construction unit of the station as the schemes to be selected next

    本文採取理論分析與試驗比較相結合的方法,首先對黃河公伯峽水站右岸導洞改建為式內消能泄洪洞的四個較大設計方案進行了水力特性的試驗研究與體型優化,在此基礎上,向建設單位分別提供了豎井旋內消能的推薦方案與水平旋內消能的推薦方案。
  10. Once the ra has checked the certification revocation request and accepted that it is from the subscriber for the mobile e - cert to be revoked, the ra will notify hongkong post ca who will then revoke the mobile e - cert and the validity of such mobile e - cert will then terminate permanently

    登記機關一經查證並接納有關之證書撤銷要求確實由該將被撤銷之子核證證書之登記人提出,登記機關將會通知香港郵政核證機關撤銷有關之子核證證書且失效。
分享友人