江洪其 的英文怎麼說

中文拼音 [jiānghóng]
江洪其 英文
hongqi jiang
  • : 名詞1. (大河) (large) river 2. (指長江) the changjiang [yangtze] river 3. (姓氏) a surname
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : 其名詞[書面語] (周年) anniversary
  1. I must also thank all the film companies who kindly provide the right to show and publish jupiter s photos, exhibition design house i concept design studio, the book s design house tomsenga design, designers steven lo and bede leung, the printing company friendship printing co ltd and its boss sung shee - wu. of course i owed a lot to our archive colleagues, especially law kar, ainling wong, bede cheng, cass wong, daphne chan, chan wing - hang, amy kong, candice cheong, jim lau, hung yuen and cheung yu - ping

    特別鳴謝的還有所有提供相片版權的電影公司設計及裝置展覽的視與想設計工作室此書的設計公司tomsenga design美術設計steven lo和bede leung和記印刷公司老闆宋敘五先生資料館各組參與同事,特別是羅卡黃愛玲鄭子宏王少芳陳秀英陳穎恆穎盈劉智軒和源張宇平等。
  2. So this article analyses deeply in the method of ensur ' my designing food rolume which is an important element to affect the " designimy height of bridge " it brings forward an " arverage optiminmy suiting line " method which is a bondage discommode series at the same time it puts forward a ensurmy principle for rough coefficient " and " fallimy flood proportion which are both suitable to heilongjiang province at last this article introduces the " three - days rainimy rolume " method

    本文立足於黑龍省各種河流的水特點,結合以往工程實際,對影響跨河橋梁設計高度的主要因素? ?設計水流量及相應水位的確定方法加以詳細分析。提出有約束不連序系列的加權優化適線法及適合於黑龍省的河流粗糙系數和水比降的確定原則,並介紹了三日降雨量法。
  3. Abstract : this paper analyzes causal factors of flood in the middle reaches of changjiang river. due to neglection of environmental management, soil erosion in the upper and middle reaches of the changjiag river, lake sedimentation, large - scale reclamation of marshes, the flood regulation capacity of the lake was descended, and flood stage was risen and prolonged. consequently more and more river levees and lake dikes were reinforced almost every year to prevent the disasters, which made flood level go up and flood period last for more days. the frequency of flood and waterlogging disasters rose and their damage was enlarged. several proposals for flood prevention including agricultural modernization are put forward

    文摘: 1998年長水后開始實施的「平垸行,退田還湖」的土地利用調整方案,從長遠來說應尋求農業安全且收入逐漸提高條件下的土地利用,長中游地區應積極推進農業現代化,提高農業勞動生產率,轉移,減少分蓄區的人口,移民建鎮,對區內的土地要促進規模經營,由優秀的有文化的農民經營,平時只有少量的直接從事農業生產的經營管理人員,農忙時則大量地使用季節性合同工或實現機械化,大水時退田還湖,減輕長幹流大水的壓力,減少分與特大災時的損失,這樣還可促進避、冬季農業等的發展,也有利於長中上游地區陡坡耕地的退耕還林,還可在糧食充足時進行休耕,在旱災、糧食緊張時擴大糧食生產?
  4. During recent decade and more, major and super floods have taken place frequently in the yangtse river and huai river. the natural phenomenon of flooding is inevitable. it is not a surefire plan only to take engineering measures for flood control while climatic variation is far from being known

    近十多年來在我國長、淮河流域連續不斷發生的大水或特大水再次向我們展示了這樣一個道理,水是一種自然現象,當環球大的氣候因素及變化規律遠未被認識時,試圖僅依靠工程措施來控制水並非萬全之策,逐步運用非工程措施,常常能起到「以柔克剛」 、 「以弱勝強」之功效。
  5. Also officiating at today s ceremony were the director of civil engineering and development, mr tsao tak - kiang ; chairman of sha tin district council, mr wai kwok - hung ; project manager of new territories east development office of cedd, mr chan kwei - sang ; shatin district officer ( acting ), miss tse wing - yee ; chief executive of maunsell consultants asia ltd, mr tony shum ; chairman and president of china harbour engineering co ( group ), dr liu huai - yau and general manager of the overseas of china harbour engineering co ( group ), dr hu jian - hua

    他出席今日啟用典禮的主禮嘉賓為土木工程拓展署署長曹德、沙田區區議會主席韋國、土木工程拓展署新界東拓展處處長陳貴生、署理沙田民政事務專員謝詠誼、茂盛(亞洲)工程顧問有限公司總裁岑鎮堅、中國港灣建設(集團)總公司總裁劉懷遠博士及中國港灣建設(集團)總公司海外部總經理胡建華博士。
  6. China ' s leaders long dreamed of damming the yangtze, in part to harness its power, but primarily to prevent catastrophic flooding

    建設長大壩是中國領導人長期以來的夢想,一方面是想利用水利資源,但更主要的是為了防止災。
  7. It is difficult to be settled by classical theories because of fixed quality and quantity. this thesis bases on the improvement of traditional way, overcomes its i ack experience, takes the more advanced fuzzy decision - making and optimal selection theory, researches into the established model and gets the result that it ' s best to set pangtoupao storage and detention flood area on the left side of menjiang river by comparing the four schemes and ten objectives of fixed quality and quantity. the result holds identical views with the result of usual economic evaluation. so it ' s the first time using fuzzy decision - making and optimal selection theory to resolve the important and pragmatic problem comprehensively and scientifically

    本文在總結用傳統的方法研究經驗與不足的基礎上,採用目前較先進的模糊優化理論及建立起的模型進行蓄滯區設置及規模研究,通過對嫩四個蓄滯區方案, 10個定性定量目標的優化比選,得出在嫩左岸設置胖頭泡蓄滯區最優,優選結果與採用常用經濟評價方法所得結果基本一致,從而第一次用模糊優化理論較全面科學地解決松花流域防工程中確定蓄滯區規模這一重大實際問題。
  8. Abstract : variation of flow condition caused by the multi - pur pose regulation schemes has been investigated on the basis of measured date in r iver model. flood - control of the upper river, operation of the power - station, saf ety of the bridge and power - station, navigation and evolution of the river are a nalyzed. a reasonable and feasible project alternative and the improvement measur ement are proposed

    文摘:涪潼南河段防整治是一項以防為主體的綜合性河岸整治工程,在平面二維數值模擬計算的基礎上再進行河工模型試驗,比較分析各防整治方案下潼南河段水流條件的變化,及對上游防、河道、大橋、電站、航運、河勢的影響,提出合理可行的工程方案
  9. Two major factors contributed to devastating summer flooding along the yangtze river and its tributaries

    兩個主要因素導致了夏季長支流的特大水。
  10. This article firstly explains the state of flood control in china, basic characteristics of flood, criterion and evaluation of river flood defense

    本文首先論述了我國防減災的基本形勢、水災害的基本特點、河防標準及評價。
  11. On their return, their rival, chow stephen fung, learns georgie s secret and reveals it to the rest of the triad hoping to become godfather himself.

    一之死,引起湖暗涌,對頭人的助手秋少馮德倫飾千方百計要把sam拉下馬,後更發現了georgie的天大秘密
  12. A rumor that the gang boss is to be murdered within 12 hours is going around. calm and discerning, the veteran gang boss simply waits and sees while his impulsive good brother vows to dig out the real culprit

    黑幫大哥仁就劉德華飾欲退出湖,然而退出湖等於死亡,消息盛傳有人要於12小時內殺死仁,好兄弟左手張學友飾決意為仁找出死士。
  13. This thesis concludes the flood control situation, engineering measures and the situation of optimal dispatch method. it studies flood control engineering system, which is composed of flood prevention reservoir, river course dyke and natural detention basin, and the relationship between various flood engineering measures according to the composition and characteristics of the flood control engineering of the middle - lower reaches of beijiang. it suggests the objective function based on the least flood loss and the optimal dispatch strategy structure of the middle - lower reaches of beijiang bound with the requirements of the flood gradual progress equation combined with hydrology and hydraulics

    本論文總結了我國防情勢、防工程措施及優化調度方法研究的現狀;針對珠流域北中下游防體系的組成及工程的特性,研究由防水庫、河道堤防和天然滯區共同組成的防工程體系中各防工程措施之間的關系;提出了以災損失最小為目標函數、以水文學和水力學相結合的水演進方程等要求為約束條件的北中下游防體系優化調度策略框架。
  14. The results showed that : the integrated ecological risk was presented symmetrically along brahmaputra, and was mitigated from valley farming area to mountain pastoral area ; the hazards of main risk sources to risk suffer in each sub - region was differently, drought was the common risk source and imperils farming and stock raising severely ; aimed at enhancing the ability of fighting drought, controlling flood and stabilizing sand engineering measures should be taken steps to prevent those hazards ; mountain hazards must be controlled in resident area and along arterial traffic ; manual work should be done to void hail in those area where hails attacked heavily ; there is need to promulgated risk knowledge to herdsmen for strengthening their risk consciousness and improve the ability of preventing risk and self - help after hazards happened in the pasturing area

    扎囊縣綜合生態風險沿雅魯藏布呈現對稱型分佈,並由河谷農業區向高山牧業區逐漸降低;各亞區的主要風險源對風險受體的危害強度差異較大,乾旱是共同的風險源,造成的農牧業生產損失最為嚴重;抗風險措施主要有在河谷地帶採取工程措施以提高抗旱、防和固沙能力,在半山臺地加強治理居民點及交通沿線的山地災害,在多雹區進行人工消雹;在高寒牧區向牧民傳播風險知識,以加強風險意識,提高規避風險和災后自救能力。
  15. Bankslope caving and its influence on the flood bank in jiangxi section of the yangtze river

    西段岸坡崩塌及對防大堤的影響
  16. The first is the influence on flood controlling, the second is the influence on hydro power, the third is the influence on water resources, navigation, and ecological environment downstream of dan jiang kou

    口水庫不加高大壩調水對丹口樞紐及下游地區主要有三個方面影響: 1對防調度的影響; 2對發電的影響; 3
  17. Article 9 flood control planning refers to the overall arrangement for the prevention and control of flood and waterlogging calamities in a certain river basin, river course or region, including river bas in flood control planning for major rivers and lakes designated by the state, flood control planning of other rivers, river courses and lakes as well as regional flood control planning

    第九條防規劃是指為防治某一流域、河段或者區域的澇災害而制定的總體部署,包括國家確定的重要河、湖泊的流域防規劃,河、河段、湖泊的防規劃以及區域防規劃。
  18. With the meteorological and hydrographic data in songhuajiang and nenjiang valley from 1951 to 1995, using correlation analysis and empirical orthogonal analysis, the rule of the flood and relation between flood and precipitation distribution in this region are discussed. the results show that periodic change of water level is obvious in this region. now water level is in the serious stage from 1980 ' s. there are great relation between the water level of flood period and the precipitation. the unusual precipitation of nenjiang valley has greater impact than that of second songhuajiang valley. at the summer in 1998, songhuajiang and nenjiang valley encountered the ghastly flood and the reason for that is the anomalous precipitation great exceeding the historic maximum

    利用松花,嫩流域1951 1995年期間的氣象和水文資料,採用相關分析,經驗正交分析等方法,討論了該流域澇發生的規律及與流域內降水分佈的關系.文章指出,流域的水位變化有明顯的階段性,且具有全流域一致的特性,目前正處在80年代以來澇較嚴重的階段;嫩流域降水異常偏多對松花澇的影響比第二松花的作用要大; 1998年夏季,松花,嫩流域出現超歷史紀錄特大水的關鍵原因是嫩流域6 8月的降水距平百分率遠遠超過了歷史上的的最大值
  19. So a new method ? scale analysis method ( or called fractal analysis method ) is applied to study the flood of jialing river basin. the scaling hypotheses is applied to the relationship of annual maximum flood and drainage area. and basing on the scaling lognormal model with two parameters introduced by smith, a lognormal model with three parameters of flood is introduced to represent the scale effect of drainage area in annual flood peak distributions

    水區域分析中一般採用水指標法,但該法的基本假定與實際情況存在矛盾,因此本文採用一種新的分析方法? ?標度分析法(或稱為分形分析法)來研究峰的區域變化,將標度不變性引入年最大峰流量? ?匯流面積關系中,並將用於嘉陵流域的水,另外,本文在smith提出的具有標度性質的二參數對數正態分佈模型基礎上創造性地提出了三參數對數正態分佈模型來表徵年最大峰流量分佈中匯流面積的尺度影響。
  20. Two major factors contributed to devastating summer flooding along the yangtze river and its tributaries. first, erosion resulting from excessive deforestation in the upper reaches of the river and, second, heavy silting which raised the riverbed in the main channel

    兩個主要因素導致了夏季長支流的特大水。第一,過度砍伐引起的河流上游的侵蝕,第二,嚴重的泥沙淤積抬高了主幹道的河床。
分享友人