池井 的英文怎麼說

中文拼音 [chíjǐng]
池井 英文
ikei
  • : 名詞1 (池塘) pool; pond 2 (旁邊高中間窪的地方) an enclosed space with raised sides 3 (舊指劇...
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  1. The pool, fed by an artesian well with a high iron content, was a pale shade of green.

    水來源於鐵質很高的自流,水面呈現淡淡的綠色。
  2. Answer : conditional bourg should introduce municipal fire control to manage a network, rural fire control still can use the natural source of water such as well, pond, river with water

    答:有條件的村鎮應引入市政消防管網,農村消防用水還可以利用水塘、河流等天然水源。
  3. Clean sand traps and header box to the reserve pit

    把錐型罐和振動篩入口罐的廢鉆液清到排污子去。
  4. Recent years, with the full - blown development of the prestressed concrete technique, the prestressed technique with ring - like strands as the professional technique adapted to the penstock, has been applied to many civil engineering fields such as tunnels and surge shafts in civil engineering hydraulics and power engineering, containment shells of nuclear power station, industrial storage bunkers, digesters and conservation pools in municipal engineering

    近年來,隨著預應力混凝土技術的成熟化發展,環形預應力作為適應壓力管道結構形式的專業技術,廣泛應用於水利水電工程隧洞和調壓、核電站安全殼、工業儲料倉、市政工程消化和蓄水等諸多領域。目前,預應力混凝土壓力管道已得到了越來越多的重視和研究。
  5. Surface water supplies, problems and solutions ; the small farm dam how to construct one ; well drilling the von der rigg ; spring and groundwater protection ; urban water supply and sanitation ; water vending ; roof catchment systems

    地表水供給的問題與解決方法;如何建造農場小蓄水;鑿;泉水與地下水的保護;城市供水與衛生設備;水的銷售;屋頂排水系統。
  6. The matrix of time and space for development of hydrogen energy system in china will instruct this work comprehensively, scientifically and objectively ; for beijing case and from all the aspects of energy, environment and economy, the best plan of hydrogen energy system about fuel cell vehicles is : hydrogen is produced by natural gas steam reforming in the central factory, then transported to the refueling stations in the hydrogen tube trailer by the trucks, and filled to the fcb using hydrogen gas

    這一工作應在燃料電汽車氫能系統發展時空矩陣的指導下有計劃、有步驟地完成;燃料電汽車在我國最早實現商業化的時間是2008年(奧運會) ,地點是北京,車型是燃料電公共汽車。針對這一案例,綜合考慮燃料電汽車氫能系統「從口到車輪」全生命周期的能源利用效率、環境影響和經濟性指標,最佳的方案是:在集中制氫廠採用天然氣蒸汽重整制氫,用汽車將裝有氫氣的高壓氣瓶輸運到氫氣加註站,加註給以氫氣為燃料的燃料電公共汽車。
  7. Test results show that the flow regime is good in a head tank with a greater length of the outlet pond and a smaller contract angle, while the sediment deposition is heavy

    試驗結果表明,出水長度較長,收縮角較小的高位中的水流流態較好,但內泥沙淤積程度較重。
  8. The necessary motion spray irrigation powered vehicle composition migration or half fixed spray irrigation unit, use each kind of water source ( well, ditch, river, pond, lake, pond ) carry on the spray irrigation to the size land parcel

    配套移動噴灌動力車,組成移動或半固定噴灌機組,利用各種水源(、渠、河、、湖、溏)對大小地塊進行噴灌。
  9. The first of these much - welcomed activities was held at the tokyo ikebukuro culture hall. to ensure the success of their efforts, tokyo initiates conducted a two - day retreat - a long - awaited event - at the tsukui center to purify the hectic atmosphere. a quan yin messenger attended the retreat, and initiates suggested that the hours of meditation be extended

    首先是8月底在東京袋文化會館舉行的第一場師父錄影帶講經活動,為了此次弘法能圓滿成功,活動前,東京同修在津久道場舉行了一次禪二,以凈化東京紛攘的氣氛。
  10. Terraces on slope land delete the conditions of causing soil and water loss. ponds, cistens, water cellars enhance surface water use efficiency, warping dams can store flood, decrease flood peak, retain sediment, and conserve water

    坡地修梯田消除了產生水土流失的條件,蓄水、旱、水窯提高了對地表水資源的利用率,淤地壩具有蓄洪水、削洪峰、攔泥沙、涵養水源的作用。
  11. Water invasion bursten out during the railway - tunnel construction is usually the mainly problem in constructing or operating, also which brings surface water to exhaustion and pollutes environment or effects ecology, etc. the geleshan tunnel which crosses through guan - yin gorge anticline which trend is near south north, is located between tuanjie village and jingkou village of the shapingba zone, chongqing city, which is belongs to the inducting segment of yu - huai railway. the guan - yin gorge anticline appears to ridge and slot interlacing in land form, and is composed of clastic rock and carbonate rock from jurassic xintiangou group to triassic

    歌樂山隧道位於渝懷線引入段重慶市沙坪壩區團結村至口村之間,隧道穿越近南北向的觀音峽背斜,地貌上表現為脊、槽相間,觀音峽背斜由侏羅系新田溝組至三疊系下統碎屑巖和碳酸鹽巖組成,歌樂山頂大部分出露可溶巖地層,地表巖溶發育,有大量泉水和暗河出口,並修建有多個中小型水庫、大量塘和水
  12. Commonly used preliminary treatment equipment includes bar screen, fine particle sieving, grit chamber, pre - aeration, grease well and scraping chamber, etc. domestic companies have the capability of manufacturing all equipment except fine sieves

    常見的前處理設備有攔污柵、細篩機、沉砂設備、預曝氣及除油或油脂撇除槽等。國內前處理設備除了細篩篩網須國
  13. Attractive refers to the response of children to a feature of land ( whether natural or man - made ) which has the potential to be harmful ( an uncovered well, a swimming pool, a swift moving stream )

    吸引孩子的、但是可能有潛在傷害的(如沒有蓋子的,游泳,水流很急的小溪)土地特徵,無論是天然的還是人造的。
  14. 4 fill tanks with required amount of drilling water

    向泥漿中加入需要量的鉆水。
  15. Drink water from your own cistern, running water from your own well

    15你要喝自己中的水、飲自己裡的活水。
  16. Drink water from your own cistern and fresh water from your own well

    箴5 : 15你要喝自己中的水、飲自己裡的活水。
  17. The nigeria project is the residential district of 145 sets of building, locates in the north of the capital of nigeria, 4. 5km from the city center, and covers 80, 000m

    套住宅每套均包括單體住宅圍坪化糞滲水等和變電所小區內道路路燈工程,住宅總面積
  18. The government is making plans to upgrade the sewerage network and the treatment works in silver mine bay. in addition, the epd has been continuing its role of monitoring and controlling the effectiveness of septic tanks and soakaway pits, making sure that residents know their responsibilities when it comes to maintaining efficient working sewage systems and repairing leakages

    政府現已手計劃提升銀礦灣的污水收集網路及污水處理設施,環保署則一直緊密監控化糞和滲水的運作情況,並促使居民履行自身的責任,維持污水處理系統有效地運作,防止泳灘污染。
  19. In recent years, with the support of shanghai municipal government, bashi group invest more to purchase volvo bus with higher grade and more humanness, manufactured by sunwin bus corporation, to perfect the visage of municipal traffic and the out environment in shanghai and accelerate the economic development

    其中,土地使用權面積約62965 . 28平方米,用途為工業用地建築物面積約25000平方米,包括2號地塊外北側「新水塔」房水房產及設施不含土地以及安裝於1號和2號地塊及其地面建築物上的機器設備報廢設備一批。
  20. Ok well i want to redo my room kindof a dark chocolate brown and a aqua, pool colored blue, but the only comforter ive found is at pb teen and i just want some other cheaper options

    我想要再做我的室kindof黑暗褐巧克力色的好並且水色,水色的藍色,但唯一的橡皮奶嘴ive被發現是在鉛青少年並且我想要其它更加便宜的選擇這是那個從鉛青少年。
分享友人