沉澱水池 的英文怎麼說

中文拼音 [chéndiànshuǐchí]
沉澱水池 英文
settling reservoir
  • : Ⅰ動詞1 (沉沒; 墜落) sink 2 (沉下 多指抽象事物) keep down; lower 3 [方言] (停止) rest Ⅱ形容...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞1 (池塘) pool; pond 2 (旁邊高中間窪的地方) an enclosed space with raised sides 3 (舊指劇...
  • 沉澱 : 1 (沉澱過程中析出的物質) sediment; precipitate; sedimentary accretion; precipitation; (doposit...
  • 水池 : pond; pool; cistern水池子 pond; pool; sink; [印度] tank
  1. Analysis of effect of catchment weir on sedimentation tank

    中途集的影響分析
  2. Revamping of inclined - tube sedimentation tank in waterworks

    廠斜管的改造
  3. At the end of this thesis, the semi - academic roberts ' s equation is given for calculating thickener depth ; this equation shows a newer, reliable ways for designing settling tank and thickener in high turbidity water treatment

    在濃縮高度的計算方面,提出了roberts公式的半理論公式,為高濁度與濃縮工藝確定了較新、較可靠的計算式。
  4. According to the thermodynamics analysis of spontaneous mineral of iron, we assumed : when sewage disposal, if sulphur is eliminated prior, this makes the consistency of iron ' s ion keep high relatively, it will react with phosphorus, produce heterosite, vivianite precipitate. this will decrease the interior load of the phosphorus in sediment, and reduce the consistency of the phosphorus in the dianchi lake

    根據鐵的自生礦物的熱力學分析,提出設想:如果在污處理時,優先脫硫,就使鐵離子的濃度保持較高,與磷生成磷鐵礦、藍鐵礦,就可以減輕積物中磷的內源負荷,進而降低滇中的磷的濃度。
  5. A deep treatment pilot test was made on micropolluted source water with combined technique of o3 preoxidizing biological pretreatment - coagulant sedimentation - sand filter - o3 after oxidizing biological activated carbon ( bac ) filter

    摘要利用臭氧預氧化生物預處理混凝砂濾臭氧后氧化生物活性炭濾組合工藝對微污染進行了深度處理中間試驗。
  6. According to the regulation of degressive effusion flux of uf during the period time of alga - blooming, this paper also favors the optimum function parameter of uf. when the water temperature is 30, the optimum tmp is 0. 07mpa, the optimum hydraulic re - wash period is 40min, the optimum chemical wash period is 330min ; when the water temperature is 20, the optimum tmp is 0. 07mpa, the optimum hydraulic re - wash period is 60min, the optimum chemical wash period is 960min

    並且根據高藻期超濾處理通量下降的規律,提出了超濾運行的最佳工藝參數,即溫30時初始透膜壓力,力反沖洗周期,化學清洗周期分別取0 . 07mpa , 40min , 330min ;溫20時以上數值分別為0 . 07mpa , 60min , 960min 。
  7. The presented system can be used to monitor the changes of sludge level in the deposit tank and improves the automation of sludge monitoring, thus it is a measuring technique with high precision and low cost

    該系統可以自動跟蹤污淤泥界面的變化,提高淤泥監測的自動化平,是一種精度較高,費用較低的測量技術。
  8. Discussion on design parameters and water production of sedimentation tank

    設計參數及產量的討論
  9. The studies on flocculation parameters of high turbidity water are completed more integrally, including establishing the equation about the relationship between the covering ratio of flocculent on silt surface 6 and the surface area of silt particles s. the re - concentration law of thickener underflow is studies

    建立了一定速下,泥沙固體顆粒表面覆蓋率與泥沙顆粒表面積s間的函數關系式;較系統地完成了高濁度絮凝參數的研究。研究了高濁度排泥的再濃縮規律。
  10. Equation of water surface curve along uniform distributing water trough of peripheral feed sedimentation basin

    周邊進的沿程均勻配面曲線方程
  11. This paper describes the collection and processing system of alum based on the digital camera for the adding control of deposition pools in a water plant, and gives a set of designing thinking, designing scheme and designing measure

    針對的加料控制,本文介紹了一個利用數字圖象處理技術進行礬花圖象採集處理的系統,給出了系統的設計思想、設計方案和詳細設計。
  12. Based on digital image processing, a scheme of alum control system in precipitator of waterworks, which include designing thinking, frame, measure and researching algorithms, is researched and exploited in the paper

    本文基於數字圖像處理,研究、開發了一套自來礬花控制系統自動化的方案,文中給出了該系統的設計思想、設計框圖、詳細設計和圖像處理的具體演算法。
  13. Application of cfd model in numerical value simulation sewage sedimentation tank

    模型在污數值模擬中的應用
  14. Research and application of unbonded prestress technology in sewage sedimentation tank

    無粘結預應力技術研究與應用
  15. It ca n ' t realize adding precipitator by measure, which traditionally depends on naked eyes to detect the quantity of adding alum in the deposition pools. as a result, there are the problems such as consuming alum without measure and difficulty to control water quality, which is n ' t adaptive to great demand of water quality

    對於中明礬添加量的檢測,傳統的方法是通過人的肉眼進行觀察,無法達到真正意義上的計量投加,直接造成明礬混凝劑的過分消耗、質情況難于掌握等問題,與日益提高標準的質要求不相適應。
  16. The chains 、 sprockets and flights are made of high - intensity engineering plastic. compared with the traditional trussed sludge scraper, it has some advantages : the more simple structure 、 lower cost 、 and more steady running, it doesn ' t destabilize the flow of the tanks

    本機的兩種鏈條、四種鏈輪及刮泥板等使用高強度工程塑料製造,與傳統的桁車式刮泥機相比,具有結構簡單、成本低、運行平穩、不擾動流的特點。
  17. The plant is now treating 1. 4 million cubic metres of sewage and effectively stopping 600 tonnes of sludge from entering the harbour every day

    公噸的污淤泥,使其中的污染物不致流入海港。該廠採用最先進的技術和設備,並應用節省空間的雙層設計。
  18. 5 the permit holder shall ensure that all runoff from the construction site is routed through oil / grit separators and / or sediment basins / traps before discharge into nearby receiving waters

    許可證持有人須確保建造工地流出的所有徑流,均先流經油污砂礫分隔器及或積物捕集裝置,才排放出附近的接收體。
  19. It is used to scrape and collect some thing like the organic sludge 、 active sludge 、 inorganic grit 、 chemical sludge, etc which are under the bottom of the tanks ; the return flights can also be made use of to collect some things like floating sludge 、 rubbish and oil slick on the water surface

    用於刮除底的有機污泥、活性污泥、無機砂粒、化學污泥等;並可利用在面上的回程刮板收集漂浮在面上的浮渣、垃圾及浮油等。
  20. Numerical simulation of flow in sedimentation tanks

    流數值模擬
分享友人