  1. The current chinese foundation design code gbj7 - 89 use limit equilibrium theoiy with elastic soil stress distribution to give out bearing capacity design value calculating fonnula and use elastic soil model to evaluate foundation settlement. according to the above theories, code gbj7 - 89 gives the correlative terms. but these do not accord with the practical mechanism of loaded soil below the shallow foundation and the elastoplastic property of natural soil so defects exist

    我國現行規范gbj7 - 89將這兩者分開考慮,其計算地基承載力設計的公式是根據彈性地基中應力分佈及土的極限平衡狀態理論為依據而得出的,求地基的變形時則視土體為彈性,這些理論對地基及土的假設與淺基礎地基的實際工作狀態及天然土體的非線性、彈塑性存在一定的偏差。
  2. On this foundation the article inducts in detail the method which is based on the relative settlement of calculating unit area end support ( qb ) force at the same time considering the feature of pedestal pile ' s " arch effect " the article introduces conception of pile effective length and finally obtain t he formula of calculating man - made pipe with bulb - shaped axial carrying capacity. the article uses marc program to calculate and analyze foundation soil ' s stress and displacement and gets the change curve chart and the proportion that is shared by king - pipe side soil friction resistance and pipe end counterforce respectively. the article inducts the structure of pedestal in detail on the basis of generalizing pedestal application cases of many countries

    在此基礎上論文詳細歸納了以相對為依據確定單位面積端承力q _ b的計算方法,並考慮擴底樁的「拱效應」特點引入了有效樁長的概念,最後結合公路規范推出了比較實用的人工挖孔擴底樁軸向承載力計算公式。論文運用了marc程序對地基土的應力和位移進行了有限元數計算分析,得到了地基土的應力和位移場的變化曲線和在加載過程中樁側土摩阻力和樁端反力各自所承擔的比例;本文還在總結各國挖孔擴底樁應用情況的基礎上就擴底樁的構造進行了詳細的歸納。
  3. The treatment for simplity that the mean value of the geostatic pressure is adopted could result in a smaller computed value of settlement but a larger one of average radial consolidation degree than the actual

    如把整個厚度范圍內自重應力取為平均,將使計算的量偏小,徑向平均固結度偏大。
  4. The methods for predicting foundation settlement in existence are always limited by the simplified presumptive conditions, which as a result causes the inconsistence between the calculated and the observed value

    現有地基預測方法受其假設條件與實際存在較大不符的限制,所得預測結果往往與實測沉降值之間存在較大差異。
  5. Based on the terszige and biot theory, initially analyze the economical of this experiment, directly save investment 22 % after compute. after that, computing the settlement of highway foundation, comparing the computing and survey value, the predict formula of vacuum - heaped load combining precompression for designing, this formula show that the distortion law of consolidation progress. at the same time, based on the position and room experiment, analyzes the intension transformation in soft soil and criteria of stabilization control

    在太沙基和比奧固結理論的基礎上,先分析了此次試驗的經濟性,經核算直接節約投資22 ,經濟效益十分明顯;隨后對真空堆載聯合預壓法加固軟土路基的量進行了估算,並與實測作對比分析,得出了真空堆載聯合預壓下的量估算公式,能反映「真空」加固過程的變化規律;同時根據現場和室內試驗,分析了軟土強度的變化,以及給出並驗證了工后控制標準。
  6. In this it has its inimitable virtue. ( 4 ) analysed the asymmetry settlement and thereout the crack because of excavating coal undergroundly oh huxi bank., then ascertained the magnitude of settlement and the distributing of the crack

    ( 4 )對湖西大堤姚橋礦段由於地下採煤而引起的不均勻以及由此產生的裂縫進行了數分析,確定了的大小以及裂縫分佈的范圍。
  7. The grain protein content and wet gluten content were improved while the sedimentation value was not obviously effected by k fertilizer

    施用鉀肥能提高小麥籽粒蛋白質含量和濕麵筋含量,但對籽粒沉降值的影響不大。
  8. Combining ability analysis of sedimentation value and the study on using heterosis in winter wheat

    冬小麥沉降值配合力分析和雜種優勢利用研究
  9. We calculated the surface subsidence, horizontal displacement, incline, and current curvature using the groundwater drawdown, conical depression influence radius of water cone and ground property

    根據地下水深、落漏斗影響半徑、巖土工程地質性質,計算水引發的地表沉降值、水平移動、傾斜、曲率現狀
  10. A positive correlation existed between sedimentation value and average sunshine time in the period from heading to maturation

    沉降值與此期間的平均日照時數均呈正相關。
  11. It was shown that the maximum displacement occurred on the tunnel axis when one tunnel was excavated, while the maximum value happened near the shallow tunnel and between the area of two tunnels when two adjacent tunnels were excavated at the same time

    分析結果表明:單條隧道開挖引起的地表最大沉降值出現在隧道軸線的正上方,而兩左右或上下相鄰隧道開挖的地表及土層內部的最大沉降值則出現在兩隧道的縱軸線之間,且偏向上方埋深較淺的隧道。
  12. Quality analysing of wheat variety with different hmw - gs types planting in different latitude and longitude position

    低分子量麥谷蛋白亞基形成時間和積累強度及其與沉降值的關系
  13. It shows that the predicted results are in well accordance with the field observations

    結果表明,利用該神經網路預測的沉降值與實測比較吻合。
  14. That means that we take maximum settlement value as an objective value, that is, to control surface settlement is to control pipeline deformation

    研究思路是:首先要搞清楚地表的規律以及地表最大沉降值的計算方法:然後研究地表最大沉降值w 。
  15. The contents of pentosan, protein, wet gluten, zeleny volume and 1000 kernel weight of 77 winter wheat varieties planted in north china were investigated

    本研究測定了我國北方冬麥區77個品種(系)籽粒中的戊聚糖含量和蛋白質、濕麵筋、沉降值、千粒重等性狀。
  16. Compared with the cases of application between the dynamic model and static model, it is indicated that the method of time series analysis is an important and advanced forecasting method in statistical forecasting

    用時間序列動態模型與靜態多項式模型分別對縱向地表的沉降值進行預報和外推,跟實測進行了對比,取得了良好的效果。
  17. Its research paths are to make decision of computational method of maximum surface settlement and settlement pattern firstly ; then to establish the relationship between maximum surface settlement and ground pipeline deformation and strain, to get maximum surface settlement in term of the relat

    X與地下管線的變形及應變的關系,從而可以根據管線與隧道的相對位置、地層條件、管線的允許變形情況求出w皿廠這樣通過控制地表最大沉降值w刪x就可以間接控制隧道工程對地下管線的影響。
  18. Thus, two 2d elastic finite - element models of tunnel are respectively established, both of which go through i wall - rock sector and wall - rock sector by means of large - scale finite element software ansys. thereby, the magnitude of wall stress, displacement, submergence of arch roof and terrestrial sedimentation in tunnels will be attained via numerical simulation of the whole construction process

    通過運用大型通用有限元軟體ansys ,分別建立隧道穿越類圍巖地段和類圍巖地段的兩個二維彈塑性有限元模型,進行施工全過程的數模擬,得到隧道中墻應力和位移以及拱頂下和地表沉降值
  19. This paper, as for the contradiction happened in design, construction, acceptance check when the quality of the project was needed and the building speed is different in every section of the road, the residual settlement a h is needed to be less than the standard value, launches the project - - - - - - the analysis on the settling velocity o f high earth fill sub - grade and the study of stability

    本文主要是針對近幾年來在設計、施工、竣工驗收在工程質量評定中所出現的矛盾? ?一條公路少至幾公里至幾十公里,甚至上百公里,由於各個標段完工速度不一致,其剩餘沉降值(即竣工驗收時) h要求小於「評定標準」 (即垂直變形3cm ) ;而進行的《高填方路基速度分析與穩定性研究》課題研究。
  20. This topic makes attempt to make spatial relationship between tunnel construction and pipeline through surface settlement to control pipeline deformation indirectly, that is, surface deformation value is deducted reverse by allowable deformat ion value

    即根據管線的允許變形來反推出地表允許的變形。本課題在這方面做了一些嘗試。即:確定地表最大沉降值whx作為目標控制,即通過控制地表來控制管線的變形。
分享友人