沉降加速 的英文怎麼說

中文拼音 [chénjiàngjiā]
沉降加速 英文
settling accelerator
  • : Ⅰ動詞1 (沉沒; 墜落) sink 2 (沉下 多指抽象事物) keep down; lower 3 [方言] (停止) rest Ⅱ形容...
  • : 降動詞1. (投降) surrender; capitulate 2. (降伏) subdue; vanquish; tame
  • : Ⅰ形容詞(迅速; 快) fast; rapid; quick; speedy Ⅱ名詞1 (速度) speed; velocity 2 (姓氏) a surna...
  1. The paper can concern the soil ' s instantaneous fallout, soil ' s main settlement due to concretion, and the coactions of soil and pile by applying the contact surface to simulate the coactions. the paper can analyze the service behavior of reuniting foundation and the effect of the pile ' s intensity, length and distance. the paper is concerned with the stressing of pile and the arrangement of pile for the smaller cost to fit the subsidence of throughway

    通過有限元計算,分析了復合地基樁土工作性狀,分析了樁的剛度,長度,樁距對地基及超孔隙水壓力的影響,並根據復合地基中樁的受力特點,提出合理的樁的布置方式,在滿足高公路路面要求的前提下,節省工程投資,快建設進度。
  2. The result is that this gas pool has simple structure, only forms a little nose - like structure at the district of fenghuangshan ; this pool belongs to delta front sub - facies sedimentary model, the underwater distributary channel and mouth bar is the better sedimentary microfacies ; the physical property of the reservoir is poor, the type of pore of the reservoir rock mostly are intergranular pore, intergranular solution hole and little are intercrystalline micropore ; the influential factors of pore structure and physical property are lithofacies, lithologic character and diagenesis ; the off - take potentia of all the testing well are deadly shortness, the wells have the worth of industrial recovery only under the condition of going through sand fracturing, and in the early of binging into production, the oil and sheath pressure drop rapidly, the production of the well drop rapidly

    研究認為該氣藏構造簡單,只在鳳凰山形成了一個小型的鼻狀構造;屬於三角洲前緣亞相積模式,水下分流河道和河口壩是有利的積微相;儲層物性差,儲層巖石的孔隙類型主要有粒間孔、粒間(內)溶孔及少量晶間微孔;影響蓬萊鎮組氣藏儲層孔隙結構及儲集性的因素有巖相、巖性條件及成巖作用;所有測試井自然產能都極低,必須經砂壓裂后才有工業開采價值,且投產初期,油套壓下較快,氣井產量下
  3. With the research object of overbank soft clay near the yiluo river, by means of pack drain to accelerate the consolidation of the soft ground and analysis of fourteen selected representative observation section, in the same time with the help of such testing apparatus as settlement plates, deflection inclinometer, piezometer, telescoping tube, my study not only evaluate the effect of pack drain ' s quickening up the consolidation of soft ground impersonalily and scientifically but also sum up the settlement disciplination of overbank soft clay after more than one years ? observation of settlement and stability continuously

    本文以伊洛河河灘相軟土為研究對象,利用板、測斜管、孔隙水壓力計、分層標等多種測試儀器,選取14個有代表性的觀測斷面,進行了一年多的與穩定觀測。通過對觀測數據的分析,進而對袋裝砂井河灘相軟土固結效果進行了客觀、科學的評價,同時推算了系數m _ s和固結度參數,並對河灘相軟土的規律進行了分析。
  4. The hydraulic gradients of settling slurry flow transported in three kinds of moving states, i. e. suspension, saltation, or partially suspension were investigated, based on analyzing the changes of solid particles and water in momentum, velocity and their mass related to momentum exchanging over the acceleration period of the solid particles

    從固體顆粒期間清水與固體顆粒的度變化、動量傳遞、相關質量等基本問題分析入手,研究了性漿體在水平管道內流動時其固體顆粒在3種流動狀態下的水力坡度,提出了性漿體在水平管道內流動的機理模型,進而用該模型對一些輸送條件下的性漿體的水力坡度進行了計算。
  5. The theoretical calculation and the model experimental result both have confirmed that the built - up stabilizing appendage is able to reduce pitching n heaving motions and especially bow acceleration considerably

    理論計算和模型試驗結果均證明了組合減搖附體能夠減小船的縱搖運動、升運動,尤其是大幅度低首部度。
  6. Another is curvature - parabolic method according to centrifugal acceleration of the vehicle in settlement section

    另一種是依據汽車在斷面上行駛時的離心度來進行控制的曲率拋物線法。
  7. The rule of loads and settlement is concluded from numbers of settlement observation points ’ data. and in actual construction, this rule could be used to prevent immediate settlement under the accelerated load, and also, the serious result of the soil destruction could be avoided. at last, a proper method of settlement computing is derived from the identified rules, which can be used to guide the practical construction work, of course, meeting the compulsory standards of the settlement control well

    採用逆作法施工,現實地解決了樁、土與筏板接觸面的變形協調關系;通過對樁、土受荷過程的實際測試,得出了樁、土分擔荷載比例和變化過程,從而為樁、土的荷載計算提供實際依據;從設置的大量觀測點中所得到的資料,得出荷載、變化規律,從而指導在實際施工中,防止載過快而導致,避免由此帶來的土體破壞的嚴重後果;通過規律分析,得出了適用於軟土地區的樁基計算方法,用於指導實際施工,以滿足控制的強制性標準。
  8. The suddenly intensified biological activities, led by the mixing of high mud - content freshwater and salty water and the rapid sedimentation of course, are believed to be responsible for the phenomenon. ulterior researches are needed for verifying and detailing the mechanism

    主要原因是,高渾濁度的長江淡水輸入,淡鹽水混合和泥沙迅導致生物活動迅強的結果,其詳細機制還有待進一步研究。
  9. The thickness of the film increases with the growth of voltage when deposited for certain time and increases with the enhancement of deposition time when deposited at certain voltage

    膜厚隨積電壓和積時間的增而增,但增率下。同時研究了提拉法鍍膜中工藝參數對制備氧化鋁膜的影響。
  10. Based on comparison of several technical schemes, the method of sand bedding pre - elevating and step water - filling pre - compressing is adopted. so the dissertation is consist of two parts : ( 1 ) the applicability study for the method of sand bedding pre - elevating and step water - filling pre - compressing, including numerical analyses for the thickness of sand bedding, the consolidation, settlement and stability of foundation, drainage, possibility of foundation liquefaction under seismic loading, et al. ( 2 ) monitoring at construction stage and checking the effect of foundation treatment, including the measurements of the settlement velocity and non - uniform settlement of ring beam under the tank, pore pressures and horizontal displacements in foundation, the pressure distribution at the bottom of oil tank and the strength increase of soils

    通過多種技術方案比較,最終選擇了技術先進的砂墊層預抬高分級充水預壓法,論文工作主要由以下兩部分組成: ( 1 )砂墊層預抬高分級充水預壓法的適用性研究,其中包括砂墊層厚度、地基與固結度、地基穩定性、水、地震作用下砂土液化的可能性等方面的計算分析; ( 2 )施工監測與地基處理效果檢驗,其中包括油罐環梁基礎率與不均勻程度、各分級充水載階段地基超靜孔壓與深層水平位移、油罐底板壓力分佈及地基土強度增長等方面的實測與數據分析。
  11. It was shown that salt expansion value of low liquid - limit clay was accumulated before the sixth freezing and thawing cycles, but the increment of salt expansion was reduced gradually with increasing cycles ; the salt expansion accumulation of low liquid - limit clay could be separated into three phases ; the deformation of clayey sand was mostly frost heave and subsidence under cycles, and collapsibility value of clayey sand was accumulated with increasing cycles ; the variation of salt expansion ratio and collapsibility ratio was a parabolic function of freezing and thawing cycles

    試驗結果表明:低液限粘土前五次凍融循環過程中鹽脹具有較好累性,隨著凍融循環次數的增,鹽脹量增長度逐漸低;含砂低液限粘土的鹽脹過程可以被分為三個階段;粘土質砂在凍融循環過程中的變形主要為凍脹和變形,具有較好的溶陷累性;低液限粘土、含砂低液限粘土的鹽脹率和粘土質砂的溶陷率與凍融周期之間的關系符合二次拋物線變化規律。
  12. Then, taking into account the effect of the compression of the approach roadway and the differential slope of the bridge slab, the author analyzes the dynamic response of man - vehicle - road system when the vehicle approaches and leaves the bridge by means of laplace transform, the curve of man ' s acceleration versus time, the vertical force between the vehicle and road versus time, the man ' s maximum transient vibration value and the maximum force between the vehicle and road are got, and the program about the calculating progress above are edited. based on the analysis above, the influence on the maximum transient vibration value of some parameters about the vehicle and road such as the movement direction and speed and weight of the vehicle, the differential slope of the bridge slab and the length of the approach slab, are studied, and some conclusion are given

    分上橋和下橋兩種情況,考慮車路耦合和橋面坡差的影響,對車輛通過設和不設搭板的路橋過渡段時「人?車?路」系統的相互作用用拉普拉斯變換法進行了動力響應分析,得到了人的度及路面對車的垂直作用力隨時間的變化曲線、人的度最大瞬態振動值和路面對車的最大作用力,分析了車輛的行進方向、度和載重,橋面坡差和搭板長度等車和路各參數對計算結果的影響,並編制了相應的計算程序。
  13. At the same time, the paper deduces the essential character of the model, gets the solution of model parameters and discusses the problems during engineering application of the analysis model. ( 3 ), one dimensional consolidation theory of impeded boundary by linear loading is deduced for layered soil, which expands the consolidation theory of impeded boundary. afterwards, the paper discusses the application of the model for settlement data of layered soil

    分析了數據模型的基本性質,得出了模型參數的解法,探討了數據分析模型在工程應用中存在的常見問題; ( 3 )針對分層地基,推導了等荷條件下半透水邊界一維固結理論解,完善了半透水邊界固結理論,並討論了數據分析模型在分層數據分析中的應用問題; ( 4 )結合工程實例,闡述了數據分析模型的應用。
  14. That is, the partially penetrating sand drain ground is viewed as the double - layered ground, and its consolidation is analyzed with 1 - d consolidation theory, through the transformation from 3 - d consolidation to 1 - d consolidation in the region of sand drain. this can overcome the disadvantage that the excess pore water is discontinuous between the region of sand drain and under - lying soft layer. to the double - layered ground, based on the consolidation mechanism under surcharge, the excess pore water pressure calculation formula is deduced under the condition of multilevel equably loading or unloading, which perfects the consolidation theory

    然後,在充分考慮豎井區井阻、塗抹作用以及土體結構損傷破壞對固結影響的基礎上,將未打穿豎井地基合理地轉化為雙層地基,按一維固結理論計算,克服了傳統固結計算方法在豎井處理區與下臥層交界面處存在孔壓間斷的缺點;在此基礎上,從超載預壓法的基本原理出發,分析了雙層地基超載預壓固結、機理,推導了多級等、卸載情況下雙層地基的固結計算公式,進一步完善了雙層地基固結理論。
  15. The study shows that besides boundary conditions, the factors influencing the nonlinear consolidation behavior of soils are the compression index cc, the permeability index ck, the level and the rate of loading, and the thickness of soil, etc. in nonlinear consolidation, especially for layered soils, the average consolidation degree defined by settlement, us is greater than the one defined by effective stress, up, i. e., the rate of the development of settlement is greater than that of the dissipation of excess pore water pressure

    研究表明,除邊界條件外,影響軟土地基一維非線性固結性狀的主要因素是壓縮指數c _ c 、滲透指數c _ k 、荷載大小與率、土層厚度等。對于非線性固結,特別是成層地基,按定義的平均固結度u _ s大於按有效應力定義的平均固結度u _ p ,即發展率要快于超靜孔壓消散的率。
  16. In the process of single fiber sedimentation, it is steady that the fiber axis orients horizontally. the terminal sedimentation rate and the lateral shifting rate increase with the particle aspect ratio. the fiber with the aspect ratio of about 2. 8 rotates fastest to the stable location

    對于單根纖維的,其穩定取向是軸線與重力方向垂直的方向;纖維的度隨長徑比的增而增,但趨勢變緩;纖維的橫向漂移隨長徑比增而增;長徑比在3左右的纖維,旋轉到穩定取向的度最快。
  17. The difference between disturbed soft clay and field soft clay is compared, and the example suggests that the disturbance degree resulted from the construction of prefabricated band drains is about 30 %. the disturbance slower the consolidation of the soft clay ground, and the extra settlement resulted from disturbance is also notable. to verify the theory developed herein, the analytical solutions are compared with the field measured ones, which shows that they are in a good agreement

    實例分析表明,施打排水板的實際擾動度約為30左右,擾動減緩了地基的固結率,引起地基的附量也是相當明顯的,考慮土結構性的地基計算方法得到的計算結果和地基實際固結量較為吻合,說明了計算理論的可靠性和合理性。
  18. Preloading design : the heaped loads, preloading stages and preloading speeds can be calculated according to the settlement and bearing capacity requirements of subsoil

    壓設計:根據工程對地基及承載力的要求,通過計算確定堆載的大小、分級和率控制等。
  19. Along with the development of our country ' s infrastructure, more and more high quality highways have been emerging in many areas such as soft clay ground, airdrome, etc. for the soft clay deformation, although there have been plenty of systematic achievements on the calculation theory and testing method have been made, but as the characteristic of soft clay is very complicated, and especially as creep characteristic of the soft clay is the key role toward the project quality

    隨著我國基本建設的發展,在軟粘土地區興建高公路、機場跑道等高等級道路同益增。盡管目前對軟粘土變形的計算理論和試驗手段都有了較系統的研究成果,但由於軟粘土性質極為復雜,特別是其流變特性對工程質量起著很大的決定作用,影響建(構)築物工后的控制,使得其計算結果仍與實際有較大差異。
  20. During the construction phase, it should make decision on loading speed according the dynamic supervising results and make decision on the adding spread time of road according the prognostic subsiding result after construction

    在施工階段,需要根據動態監測的結果,對施工期的度做出決策。根據工后的預測結果,對路面的鋪時間做出決策。
分享友人