沉降計 的英文怎麼說

中文拼音 [chénjiàng]
沉降計 英文
settlement gage
  • : Ⅰ動詞1 (沉沒; 墜落) sink 2 (沉下 多指抽象事物) keep down; lower 3 [方言] (停止) rest Ⅱ形容...
  • : 降動詞1. (投降) surrender; capitulate 2. (降伏) subdue; vanquish; tame
  • : Ⅰ動詞1 (計算) count; compute; calculate; number 2 (設想; 打算) plan; plot Ⅱ名詞1 (測量或計算...
  1. Displacement formula for composite foundation of composite piles is derived by considering the coaction of foundation soil, broken stone pile, cfg pile and bedding cushion and by applying the theory of elastic - plastic mechanics, which is proper for superstructure being constructed

    運用彈塑性力學知識,同時考慮地基土、碎石樁、 cfg樁和墊層四者的相互作用,推導出了比較切合實際的上部結構動工后組合樁復合地基的沉降計算公式。
  2. Pass to analyze the cement powder spray a problem for reuniting the foundation sink to decline the calculation esse, the suggestion uses to sink to decline the proceeding correction to the bottom layer in response to the dint correction coefficient, its result with actual than near to, from but for the engineering ' s design with applied to provide the basis

    摘要通過分析水泥粉噴樁復合地基沉降計算存在的問題,建議用應力修正系數對下臥層的進行修正,其結果與實際較接近,從而為該工程設和應用提供了依據。
  3. With the quick development of expressway in the soft soil area, the settlement and deformation of sub - grade of expressway has become a very outstanding question. this paper establishes the corresponding formulas of sub - grade 3 - d ( three - dimension ) settlement on inartificial foundation, bagged sand - drains foundation and semi - rigidity piles foundation, and the calculation results from the formulas is compared with the observation results of settlement. it proves that the methods adopted by the paper are feasible

    本文擬根據馬鞍山?蕪湖高速公路軟土路基的變形及其處理方法,對軟土路基的三維沉降計算和用袋裝砂井處理與粉噴樁半剛性樁處理時的沉降計算方法作一定的探討,同時與幾個路段的實際觀測資料分析比較,認為本文的沉降計算方法總體上是可行的。
  4. Assessment of calculating methods of subsoil deformation

    建築地基沉降計算方法的評價
  5. Research on reliability of the composite pile foundation settlement calculation

    復合樁基沉降計算的可靠度研究
  6. The rule of loads and settlement is concluded from numbers of settlement observation points ’ data. and in actual construction, this rule could be used to prevent immediate settlement under the accelerated load, and also, the serious result of the soil destruction could be avoided. at last, a proper method of settlement computing is derived from the identified rules, which can be used to guide the practical construction work, of course, meeting the compulsory standards of the settlement control well

    採用逆作法施工,現實地解決了樁、土與筏板接觸面的變形協調關系;通過對樁、土受荷過程的實際測試,得出了樁、土分擔荷載比例和變化過程,從而為樁、土的荷載算提供實際依據;從設置的大量觀測點中所得到的資料,得出荷載、變化規律,從而指導在實際施工中,防止加載過快而導致速,避免由此帶來的土體破壞的嚴重後果;通過規律分析,得出了適用於軟土地區的樁基沉降計算方法,用於指導實際施工,以滿足控制的強制性標準。
  7. For the ordinary engineering, the curve fitting methods based on model discerning are introduced to calculate the embankment ' s settlement

    對於一般工程的路基沉降計算,採用基於模型辨識的曲線擬合法。
  8. The precision of its calculating results has an direct effect on the design, construction and safe usage. in the typical calculation of the settlement of foundation, additional stress incurring by loading is calculated according to elastic theory which has the same characteristics in semi - indefinated space, the condesion of soil is decided by the condesion experiment of one - demension and the settlement is calculated by adding results of respective layer

    地基沉降計算一直是困擾巖土工程技術人員的一個難題,其準確與否將直接影響建築物的設、施工和安全使用。在經典的地基沉降計算方法中,荷載作用下地基中附加應力場是根據半無限空間各向同性彈性體理論算的,土體壓縮性是根據一維壓縮試驗確定的,並採用分層總和法來算地基的量。
  9. Integration of these two sides could let the results of layerwise summation method ( lsm ) be more accuracy, which can consider not only soil stress history but also soil lateral deformation and soil nonlinear properties even. ( 5 ) research on the application of meshless method for embankment settlement calculation

    綜合這兩個方面,單向分層綜合法的算結果趨于更準確,其不但能考慮應力歷史外,而且能入土體側向變形甚至土體非線性特性; ( 5 )路堤沉降計算無單元法應用研究。
  10. Additionally, computer program is formed to make the calculation of the settlement of highway sub grade concise and convenient

    最後,編制了算程序,使公路路基沉降計算準確、簡便、快捷。
  11. Calculation methods for settlements of immersed tunnels induced by tidal load

    潮汐荷載引起管隧道沉降計算方法
  12. According to the documentation collected from domestic and abroad wang wei dong who works in huadong architect and structure institute utilizes the similar work property between the underground continuous wall and pile subjected the vertical loads, and introduces poulos method of elasticity and plastic which applies to pile foundation into the calculation for subsidence of underground continuous wall. pujialiu and yu yuzhou from water and electronic engineering of qinghua university, according to the result of three axes, define the concrete parameter utilize the model of non - linear e - b combined with the design cross section of dam in xiaolangdi, yellow river accept the total stress programme of thepd dam, and we analyze the stress and displacement of plastic concrete diaphragm wall by finite element method in comparison with the result of common concrete one. at same time, we consider the effect of the character of plastic concrete diaphragm wall which is composed of different gradients and adopting the level of stress and pulling stress infers whether the plastic concrete diaphragm wall is safe or not

    地下連續墻是一種歷史較短的施工方法,目前,砼防滲墻的設還是以傳統的設方法為主,根據查找國內外文獻資料,華東建築設院王衛東利用地下連續墻與樁在豎向荷載作用下的工作性能有相似性,將適用於樁基的poulos彈性理論引入對地下連續墻的沉降計算中;清華大學水利水電工程系濮家騮、于玉貞根據三軸試驗結果確定混凝土的參數,利用非線性e - b模型,結合黃河小浪底土石壩設剖面,採用thepd土石壩總應力程序,對深覆蓋層塑性混凝土防滲墻的應力、位移進行有限元分析,並與普通混凝土防滲墻算結果加以對比,同時分析了不同配比塑性混凝土特性的影響,並採用應力水平和拉應力數值來判斷塑性混凝土防滲墻的安全程度。
  13. Considering the feature of subgrade deformation, the off set limit and the settlement calculation depth are discussed in this paper

    並結合路基變形特點,對軟土層的屈服極限、沉降計算深度等問題進行了探討。
  14. 3. calculate the post - work settlement of the funing luyang engineering project, and estimate the model

    對阜寧蘆楊地龍工地進行工后沉降計算,測試新建模型的合理性。
  15. By comparing the results obtained from the above solutions with these obtained from available theories for pile settlement and from field static load test of pile, the reasonability and practical value of the developed theoretical solutions were declared and verified

    通過與現有單樁沉降計算理論的對比和對實際單樁靜力載荷試驗結果的分析與比較,論證了本文理論解的合理性及應用價值。
  16. Study on calculational method of ground settlement induced by level parallel pipe jacking

    水平平行頂管引起的地面沉降計算方法研究
  17. Determining the settlement of composite foundation of soil - cement mixing piles

    水泥土攪拌樁復合地基沉降計
  18. Based on the study idea of the former pile else, this paper has conducted and discussed the mechanism of consolidation, settlement calculation and optimization design of the pcc pile according to the test in situ results and reasoning. it includes the followings in detail : ( 1 ) compared with the precast tube concrete pile and tube sinking concrete pile, the merits and shortages, construction machine, construction technology of the pcc pile and pcc pile composite foundation are introduced in detail to make the pcc pile be known completely by engineers

    本文在借鑒其他樁型的研究的基礎上,通過現場試驗研究和理論推導,對pcc樁處理軟基加固機理、沉降計算和優化設等進行了較為深入的研究和探討,具體包含以下幾方面的內容: ( 1 )在與預制管樁和管灌注樁等樁型比較的基礎上,對pcc樁的優缺點、施工機具設備、施工工藝、技術作用機理以及pcc樁復合地基技術特點等進行了述評。
  19. Authors adopted an average secondary consolidation coefficient in settlement calculation of peal foundation in order to make results more reliable

    為了使沉降計算更可靠,建議泥炭地基的沉降計算採用平均次固結系數。
  20. Based on the theoretical solutions developed herein, not only q - s curve but also s - log ( t ) curve obtained from field static load test of pile can be simulated. this overcomes the shortcoming involved with available relevant theory for pile settlement that no time effect can be taken into consideration, and thus makes the theory for pile settlement more perfect

    利用本文的理論解不但可以較好地模擬單樁在工作荷載下的q - s曲線,而且可以模擬單樁靜載荷試驗的s - logt曲線,從而克服了以往相關理論難以考慮單樁的時間效應的不足,豐富和完善了單樁沉降計算理論。
分享友人