沉陷 的英文怎麼說
中文拼音 [chénxiàn]
沉陷
英文
1. (下陷) sink; cave in 2. (沉降) sinkage; downpunching; depression; subsidence; [建築] settlement -
The earthquake made the roadbed cave in.
地震後路基沉陷了。Field survey study on ground subsidence laws of strip mining
條帶開采地表沉陷規律實測研究Discrete element numerical simulation of subsidence induced by mining under fragmentized rock - strip
破碎帶下采礦引起地表沉陷的離散元數值模擬Design on mine 3d mining subsidence prediction system base on idl
的礦山三維開采沉陷預測系統設計Numerical simulation of the predication of surface subsidence behavior
煤礦開采沉陷預測的數值模擬Sinkholes in coal mining areas
採煤沉陷區The major causes for dyke breaches are the strong permeability of soil at the dyke breaches, resulting in infiltration or piping firstly, and nonuniform settlement on water side and land side of the dyke due to a long - term soakage of the dyke, further leading to cracking and erosion, and finally breaching of the dyke
潰口發生的主要原因是潰口處土壤組成透水性強,先發生散浸或管涌等險情,加上浸滄時間長,迎水面和背水面堤身沉陷不均勻,導致裂縫出現和沖刷的加劇也都促成潰口發生。Numerical study on the influence of recovery ratio on surface subsidence in strip mining
條帶開采中采出率對地表沉陷影響的數值模擬研究Self - contained forecast model of mining subsidence
礦山開采沉陷的完備預計模型Ground subsidence predictions for highway underlaying multiplayer goaf
高速公路下伏多層采空區地表沉陷的預計評價方法Simulation on visco - elastoplastic damage settlement by mining coal
開采沉陷粘彈塑性損傷模擬分析Based on the example of south dump slope of anjialing open colliery in pingshuo, the rule of surface subsidence was studied using flac ( superscript 3d )
摘要為研究露天煤礦排土場邊坡下采動沉陷規律,結合平朔安家嶺露天礦南排土場邊坡的實例,採用flac (上標3d )程序進行了數值模擬計算。Gully erosion, which is universal on original lands, but also the special forms, for example, hole erosion gravel erosion debris slide and debris flow, which is unusual in loess area, ( 2 ) based on a long - term fixed point experiments in proving ground of the south stackpile, the soil erosion factors have been researched quantitatively, the runoff and erosion affected factors have been made sure and the experiential models of producing water and soil have been taken in newly - constructed stage, early stage and later stage of reclamation
確定南排土場原地貌的水蝕模數為3700 4400t km ~ 2 ? a ;在排土場新造地貌上,擊濺、面蝕、細溝侵蝕、淺溝侵蝕、沉陷侵蝕、砂礫化面蝕、土砂瀉溜和坡面泥石流等水土流失形式出現頻率和發生程度都明顯強于原地貌。 ( 2 )以南排土場徑流試驗場長期的定位觀測為基礎,對排土場未復墾時期、復墾初期、復墾後期的土壤水蝕影響因子進行定量研究,確定了徑流和土壤水蝕的主要影響因子及其臨界值,建立了產流產沙的經驗模型。Half subsidence point
半沉陷點Increments of settlement
沉陷的增大The settlement isoline map, based on subsidence prediction in mining area, is difficult to be directly applied to land planning in mining area and mgis analysis due to its different data structure from digital terrain map
摘要基於開采沉陷預計的採煤區下沉等值線圖不便於直觀地反映礦區地形的動態變化,其圖形數據結構與數字地形圖存在差異,難以直接用於規劃設計和礦區gis分析。Abstract : a certain hall is demaged by water. lime pile and high compress forcing pulp are used to reinforce fhe settled foundation
文摘:某禮堂綜合樓受浸水損壞,採用生石灰樁及高壓水泥注漿綜合法加固建築物沉陷部分地基,獲得成功。The results show that distinct " bench " distribution rule takes on for the subsidence and distortion of bench - shape slope surface ; the movement range of bench - shape slope surface is smaller but its distortion is larger than those of flat surface and concentrated distortion occurs at every bench plan ; the surface horizontal distortion of bench - shape slope is still pressed in gob centre and tensioned in both sides of gob ; space - time effect should be taken into account for the stability of bench - shape slope influenced by underground mining
結果表明:露天煤礦臺階狀邊坡體的采動沉陷規律表現出很明顯的「臺階」分佈特點;臺階狀邊坡地表的移動范圍比平地地表要小,但變形卻更劇烈,且在各臺階平面處形成變形集中;臺階狀邊坡地表的水平變形仍然呈現出采空區中間受壓,兩端受拉的特點;臺階狀邊坡在地下開采擾動下的穩定性應考慮采空區的時空效應。It is during these very periods of subsidence, that the deposits which are richest in fossils have been accumulated.
在這一沉陷期間,化石中最富含的沉積物堆積起來。In the limit, for very weak rock, settlement at the boundary can also occur before the separation crack.
在極限情況下,對于非常軟弱的巖石,形成分離裂縫之前,也會發生邊界處的沉陷。分享友人