河水位 的英文怎麼說

中文拼音 [shuǐwèi]
河水位 英文
river level河水位自錄儀 fluvicograph
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (所在或所佔的地方) place; location 2 (職位; 地位) position; post; status 3 (特指皇帝...
  • 水位 : stage; water level
  1. The first power station of jinping mountain lies in the west section of the yanglongjiang river from santan to shoupagou gully, with a double - curved arch dam of 305 - meter height and a normal water storage of 1880metres. the exposed strata of the damsite are marbles and arenaceous rocks of triassic and solution fissures have been developed in the marbles of the left - bank ' s dam abutment, and they have become a stratum of strong leakage. as a result, it has been an important problem for the dam foundation to stop leakage

    錦屏一級電站於西雅礱江的三灘至手爬溝段,壩型為305米高雙曲拱壩,正常蓄標高1880米。壩址區出露的地層為三疊系雜谷腦組二段大理巖和三疊系雜谷腦組三段的砂板巖。在勘探過程中,發現左岸壩肩大理巖體中的構造裂隙和溶蝕裂隙發育,且成為強滲透地層,為此壩基的防滲成為重要問題。
  2. The upper of the east model boundary remains constant head and the at the lower of it, there might exists a diffluent interface. so the east and west sides of the diffluent interface are respectively the drainage area of east and west karst - groundwater of yellow river

    模型東界上部以黃河水位為第一類頭已知邊界,下部必存在一個分流面,分流面東西兩側分別是黃東西兩塊巖溶的排泄區,該分流面可視為零流量邊界。
  3. So this article analyses deeply in the method of ensur ' my designing food rolume which is an important element to affect the " designimy height of bridge " it brings forward an " arverage optiminmy suiting line " method which is a bondage discommode series at the same time it puts forward a ensurmy principle for rough coefficient " and " fallimy flood proportion which are both suitable to heilongjiang province at last this article introduces the " three - days rainimy rolume " method

    本文立足於黑龍江省各種流的洪特點,結合以往工程實際,對影響跨橋梁設計高度的主要因素? ?設計洪流量及其相應洪的確定方法加以詳細分析。提出有約束不連序系列的加權優化適線法及適合於黑龍江省的流粗糙系數和洪比降的確定原則,並介紹了三日降雨量法。
  4. By using the yearly data of water - sand that is gotten by a couple of adjacent hydrologic station in yellow river lower reaches, this paper makes use of kinds of math methods looking for the nonlinear disturbance among all of the factors, and introduces the thinking of analysis, logic, conclusion, inference, and random to nonlinear hydrologic forecasting. it realizes the valid approximation of the water level process in erodible - bed channel

    本文選擇黃下游兩對相鄰文站多年沙資料,藉助多種數學方法尋找其中的非線性擾動項,將隨機數學中分析、邏輯、歸納、演繹、隨機的思考問題方式引入到非線性文預報中,實現沖淤道相應過程的有效擬合。
  5. There are a lot of factors that work on the water level of erodible - bed channel together, each of them varies no role, but is correlative. in the adjacent years or the adjacent flood peak of a floodwater, the conditions of the factors that influence water level are always very different. so, there is a nonlinear relation between water level and the factors influencing it

    沖淤受到很多因素的共同作用,各因素本身的變化沒有規律且互相關聯,相鄰前後年份或同一場洪的不同洪峰前後,影響、沙、道等因素常差別很大,與其影響因素之間客觀上是非線性關系。
  6. At first, this paper analyzes the factors of water - sand influencing water level of yellow river and the feasibility just using the factors of water - sand to study water level, and collects the corresponding data ; secondly, because there are strong nonlinear relation in the corresponding data, by meticulous theory analysis, this paper integrates basic nonlinear analysis method, theory of random analysis, method of least squares and so on. it puts forward a method which can get the high accuracy simulation of the data, perfects the multi - factor analysis of variable ( over three factors ) of the statistic ; thirdly, it applies the method to the approximation of corresponding water level process which belong to the capacity of sand of middle - high and middle - low, and get the high - accuracy simulation about the typical nonlinear relation ; at last, this paper definitudes the main influence mode that the capacity of sand. it mainly unite with other factors to work on the water level in the yellow river lower reaches ; mor eover, this paper analyzes the difficult point and the direction of improvement to realize the accuracy forecasting of the flood level of erodible - bed channel

    首先,系統分析了影響黃河水位沙因素,及僅用沙因素有效研究的可行性,並按變量對應思想採集它們的相應數據;其次,由於相應過程數據中含極強的非線性關系,本論文經細致的理論分析,將基本的非線性分析方法、統計建模方法、隨機分析理論、最小均方誤差原則等等數學理論及方法有機揉合,提出了能有效實現這類數據高精度擬合的分層篩選法,並改進了統計學中多因子(三個以上)方差分析法;再次,將這一方法用於黃中高及中低含沙類洪相應過程的擬合,實現了這一典型非線性關系的高精度擬合,各年汛期上下游相應洪過程的擬合誤差都較小;最後,明確黃下游含沙量對的主要影響方式,即含沙量主要是與其它因素聯合對作用;另外分析了要實現變動床洪過程準確預報的困難所在及改進方向。
  7. From roundwood reservoir in county wicklow of a cubic capacity of 2, 400 million gallons, percolating through a subterranean aqueduct of filter mains of single and double pipeage constructed at an initial plant cost of 5 per linear yard by way of the dargle, rathdown, glen of the downs and callowhill to the 26 acre reservoir at stillorgan, a distance of 22 statute miles, and thence, through a system of relieving tanks, by a gradient of 250 feet to the city boundary at eustace bridge, upper leeson street, though from prolonged summer drouth and daily supply of 12 1 2 million gallons the water had fallen below the sill of the overflow weir for which reason the borough surveyor and waterworks engineer, mr spencer harty, c. e., on the instructions of the waterworks committee, had prohibited the use of municipal water for purposes other than those of consumption envisaging the possibility of recourse being had to the importable water of the grand and royal canals as in 1893 particularly as the south dublin guardians, notwithstanding their ration of 15 gallons per day per pauper supplied through a 6 inch meter, had been convicted of a wastage of 20, 000 gallons per night by a reading of their meter on the affirmation of the law agent of the corporation, mr ignatius rice, solicitor, thereby acting to the detriment of another section of the public, selfsupporting taxpayers, solvent, sound

    但是由於夏季久旱,再加上每天供一千二百五十萬加侖,已降到低於排口。都市監察官兼道局技官土木工程師斯潘塞哈蒂奉道局的指示鑒于有可能會像一八九三年那樣被迫利用大運和皇家運那不宜飲用的,除了飲用外,下令一律禁止使用市裡供應的自來。尤其是南都柏林濟貧院,盡管限定用六英寸的計量器,每個貧民每日配給十五加侖,然而在市政府法律顧問辯護律師伊格內修斯賴斯的監督下,經查表證實,每夜要浪費兩萬加侖,從而使院外的社會各階層也就是自費並有支付能力的納稅者們蒙受損害。
  8. ( 4 ) the maximum water quantity becomes greater, the better is the filtering bed permeability, the higher the river hydraulic conductance, the higher the river level, the larger the water - collecting area and the bigger the distance between collecting pipes. the water quantity varies directly with drawdown

    ( 4 )濾床的滲透性能越好,力傳導系數越高,越高,取面積越大,取管之間的間距越大,則最大取量越大;降深與取量成正比關系。
  9. Numerical computation of flood control level for suzhou creek

    蘇州幹流防洪的數值計算
  10. Flood level forecast model for tidal channel based on the radial basis function - artificial neural network

    用徑向基函數神經網路模型預報感潮段洪
  11. For jiangpinghe double - curved arch dam, 3 - d elasto - plastic fem is made, in which the point safety factors of the dam - abutments system and the safety margin for coefficients of sliding resistance on 7 potential sliding blocks of the dam before and after the reinforcement of the dam are calculated under the conditions of the normal storage level and the design flood level respectively based on the results from the analysis made with fem

    摘要對江坪雙曲拱壩進行了三維彈塑性有限元分析,利用有限元應力成果分別計算了正常蓄、設計洪等3種工況下加固前後壩體壩肩系統的點安全系數和7個可能滑動塊體的抗滑富餘系數。
  12. The flood damage exposes the contradiction between people and flood, population explosion results in that people need more and more land for farming, a lot of flood - plain, flood - plain protection, retarding basin, and ever floodway are occupied by farmers for agricultural purpose. so that major or even middle and small flood can not be smoothly discharged in the river

    這場洪災暴露了建國以來治淮工作中久而未決的一個問題,即局部地區為了解決人多地少的問題,大量侵佔道行洪灘地,與洪爭地,不給洪出路,使得本已不堪重負的道,即使是中、小洪來臨,也處在高狀況下運行,加劇了中、下游地區的防洪風險。
  13. Some researchers have made study on this subject, such as the generation and evolution of frazil ice, shore ice, bottom ice, ice cover and ice jam, the resistance of freeze - up river, flow capacity and variation of water stage

    國內外一些學者通過原型觀測,試驗和數值模擬的方法對內冰,岸冰,底冰,冰蓋和冰塞的生成和演變,封凍道的阻力、過流能力和變化等有關問題進行了研究。
  14. Besides, the sedimentary facies of upper ganchaigou and lower ganchaigou formation were also mapped in supersequences which are the main target strata for exploration. the high resolution sequence stratigraphic framework showed the genetic relationship between the distributions of sedimentary facies and their tectonic settings. the near - source sedimentary systems such as subaqueous alluvial fan and lake - floor fan are often deposed in rise - hemicycles in the steep slope background in the north, the coarse lithology of fan - delta prograded from north to south in fall - hemicycles, and the braided stream facies are formed in the rise - hemicycles in gentle slope background in the south, braided stream facies prograded from sorth to north in the fall - hemicycles, but the lacustrine facies and salt lake facies developed in the middle part of the area

    詳細的沉積相研究發現,紅獅地區第三系發育有沖積扇、下沖積扇、流、三角洲、扇三角洲、湖泊和湖底扇7種主要沉積相類型,並對作為區內主要勘探目的層系的下乾柴溝組和上乾柴溝組進行了以超層序為單的沉積相平面編圖,以較高的時間解析度揭示了區內沉積相帶的平面展布及其在不同構造背景中的分佈規律,比如在北部的凹陷陡坡背景下,上升半旋迴低期通常發育有下扇、湖底扇等陡岸近源特徵的沉積體系,下降半旋迴高期,扇三角洲相粗碎屑巖由北向南進積;在南部的凹陷緩坡背景下,上升半旋迴主要發育辮狀流相,下降半旋迴辮狀三角洲相由南向北進積;而中部紅柳泉一獅子溝一帶則為湖泊相沉積和鹽類沉積。
  15. The arkansas river can rise no higher than to the main street bridge in little rock

    阿肯色河水位不得漲到高於小巖城的大街橋。
  16. This is the famous nilometer by which water levels in the river nilo were noted.

    這就是著名的尼羅儀。用它測星尼羅
  17. Abstract : the qiantang estuary with violent hydrodynamic conditions is well known for its tidal bore. the regulation of the estuary in the past, especially the progress since the founding of new china are reviewed. the principles of the regulation and planning of the qiantang estuary formulated in 1960s are expounded, i. e., to narrow the river to reduce the tidal prism, and to increase the ratio of the river flow to tidal discharge. the experience of estuary regulation / reclamation is summarized, especially the engineering measures to protect the groin head and to use polder dykes as sea defense works. finally, the effect is analyzed of the large - scale constraction / reclamation in the estuary on the tides, flooding high water level, estuary bed and the northern deep waterway in the hangzhou bay

    文摘:以涌潮聞名的錢塘江口,動力強勁,破壞力極大.回顧錢塘江口歷代治理情況,重點記述1949年以來治理工作的進展,論述60年代提出的錢塘江口治理規劃的指導思想,即縮窄江道,減少進潮量,增大山潮比值的整治原則.總結整治規劃實施過程中治江圍塗經驗,特別是「以圍代壩」和丁壩壩頭保護等工程措施.分析錢塘江口大規模治江圍塗后對錢塘江口潮汐、洪床以及杭州灣北岸深槽的影響
  18. The rain raised the river two meters above normal

    使得這條河水位超出標準兩米。
  19. Meanwhile, the flood peak fell off ceaselessly, witch indicates that the new conformation descended greatly

    Sin以上,這比現代洪時期河水位一般上升1 zm左右明顯高。
  20. This was just after formosa had been hit by typhoon bilis, when for many days, wulu lost contact with the outside world. the people had to rely on emergency supplies airlifted by formosa s seagull air squadron. when the brother initiate contacting them visited wulu to arrange for the medical and barber s services, he was deeply impressed by the villagers shouting in unison as they worked together to restore the water supply in the mountains

    據亦有參加此行救災工作的基隆紅十字會雨港救生隊搜救組長林師兄陳述:當時基隆河水位多次面臨潰堤邊緣,但一到達堤防的臨界點就消退下去,如此的情形有很多次,同修們相信一定是師父保佑,不然將會有更多人民和財產的損失。
分享友人