河道出口 的英文怎麼說

中文拼音 [dàochūkǒu]
河道出口 英文
stream outlet
  • : 1 (天然的和人工的大水道) river 2 (指銀河系) the milky way system; the galaxy 3 (特指黃河) t...
  • : Ⅰ名詞(道路) road; way; route; path 2 (水流通過的途徑) channel; course 3 (方向; 方法; 道理) ...
  • : Ⅰ名詞1 (人或動物進飲食的器官; 嘴) mouth 2 (容器通外面的地方) mouth; rim 3 (出入通過的地方) ...
  • 河道 : river course; streamway; covalency; runway; cut; river channel河道變遷 channel change; migration ...
  1. Small alluvial fans at mouths of wet weather drainage ways also are commonly intermixed indistinguishably.

    潮濕氣侯地區河道出口處的小沖積扇,其沉積物的混合通常也難以區別。
  2. In consideration of the crises of both the industrial water and the domestic water in the estuarial areas of the yangtze river caused by the decrease of the channel runoff and the intrusion of the sea water during the dry season in dry year, the concept, method and planning framework of the water resources allocation for the areas mentioned above along the main stem of the river are put forward herein based on the preliminary prediction of the future water demands by taking the water resources allocation therein during the dry seasons as the actual case in combination with the status quo of the water environment and water resources utilization concerned

    摘要針對枯水年枯水季,因徑流量較少,鹽水入侵的頻率和強度顯著提高而引起的長江沿岸地區生產生活用水安全,文中結合長江地區水資源利用和水環境現狀,以大通以下長江幹流地區在枯水季水量分配為實例,在初步預測未來地區水資源需求的基礎上,提長江地區水資源配置的思路、方法及方案框架。
  3. From sedimentology symbol such as rock assembled, sediment gradus, sandstone grading analysis, protogene sedimentary structure, ichnofossile and logging facies etc and palaeoenvironment background, it is confirmed that shen84 - an12block s34 segment is braid river delta system, not fan delta system ( abrupt slope ). then it can be more partition as braid river delta plain sedimentary assembled, delta front sedimentary assembled and prodelta sedimentary assembled on core and log assembled. and delta plain sedimentary assembled can be identified four microfacies : braided distributary channel, crevasse splay, overbank deposits and interdistributary bay

    沉積微相研究是儲層非均質性研究的基礎,研究區有豐富的巖芯資料和測井資料,通過巖石組合、沉積韻律,砂巖粒度分析、沉積構造、古生物遺跡和測井相等沉積學標志,結合古環境背景,確定沈84 ?安12塊s _ 3 ~ 4段為辮狀三角洲體系,而不是前人所認為的扇三角洲(陡坡型)體系,在巖芯和測井組合上可進一步劃分為辮狀三角洲平原沉積組合、三角洲前緣沉積組合和前三角洲沉積組合,其中三角洲平原沉積組合又可識別辮狀分流、決扇、分流邊部和分流間灣四種微相類型;三角洲前緣沉積組合識別水下分流、水下分流邊部和分流壩三種微相。
  4. One morning, when we was pretty well down the state of arkansaw, we come in sight of a little one - horse town in a big bend ; so we tied up about three - quarters of a mile above it, in the mouth of a crick which was shut in like a tunnel by the cypress trees, and all of us but jim took the canoe and went down there to see if there was any chance in that place for our show

    一天早晨,我們到了阿肯色州下游老遠的地方,可以望見前邊一個大的灣處,有一個巴掌大的小鎮,我們就在離鎮上游大約西分之三英里的地方,把木筏子系好了。那是在一條小處,兩邊有柏樹濃蔭覆蓋,彷彿象一條隧似的。除了傑姆以外,我們都坐了獨木舟前往那個鎮子上,看看在那裡能否有個機會好演
  5. Through checking computations, it was shown that the analogue accuracy of the model was quite high, which can provide important basis for scientific decision - making on engineering measures. through analogue calculation and analysis of many regulation schemes, it was shown that combining the diversion weir works with the bed fixing works at the south branch is reasonable and feasible in the implementation of loushuikouzi river regulation works. in addition, it is suggested that the bed fixing works at the south branch should adopt the improved compound section scheme

    經對多個整治方案的模擬計算與分析,表明漏水整治採用分流魚嘴工程和南汊固床工程相結合的整治工程措施是合理可行的,通過模型計算研究還提了南汊固床工程採用復式斷面形式的改進方案建議,該方案保證了南汊枯期通航和不斷流,而且對南汊及撫遠鎮的保護具有正面作用。
  6. On the toei subway oedo line, a convenient route is via fukagawa shiryokan - dori. 15 - minute walk from the no. 3 exit of kiba sta

    都營地鐵大江戶線清澄白站a3步行13分鐘經由深川資料館大便捷。
  7. Study achievement appears as following aspects : ( 1 ) yellow river estuary gate river flow and tide flow mixed area is not keep standing deposition status, on special income water and sediment conditions, boundary conditions and oceanic power conditions, this area may on the scour status ; ( 2 ) observed from estuary sediment deposition distributing process : delta and sea offing area sediment deposition vary trend is similar, each part sediment deposition scale varies as wave shape ; ( 3 ) on estuary gate, affect the sediment deposition factors, primary factors are tide prop, the gate widens gradually, estuary gate have branches, brine induced flocculation. this paper study the estuary gate widen, estuary gate have branches to affect the river channel deposition in quantity ; ( 4 ) based on field measured data, for the first time, deduce the estuary sediment deposition and distributing regress formula which can estimate estuary different areas sediment deposition volume ; ( 5 ) this subject demonstrate the estuary delta coastline dynamic balance conception, build the relationship between the estuary income sediment with deposition land area, draw the following important conclusion : when estuary years - averaged income sediment keeps at 345 million tons, the delta coastline may on the dynamic balance status. ( 6 ) this subject firstly brings up estuary sediment optimized control conception, and has the primary study on the macroscopically optimized control conception method

    研究認為: ( 1 )黃門逕流潮汐區域並非持續保持淤積狀態,在特定的來水來沙、邊界條件和海洋動力條件下,該區域可以處于沖刷狀態; ( 2 )從泥沙沉積分配的過程來看:三角洲與濱海區泥沙的沉積變化趨勢是基本一致的,各部位的泥沙沉積比例變化基本呈波動狀態,且三角洲與濱海區泥沙的沉積比例與來沙量密切相關,基本成正比關系; ( 3 )在門處,影響泥沙沉淤的因素主要集中在潮汐頂托、門逐漸加寬、門分汊、鹽水造成絮凝等,本報告主要對門加寬,門西妥理工大學工程碩士專業學位論文分漢對淤積的影響進行了定量分析: (一扣根據實測資料首次建立了贖流路泥沙沉積分配的回歸計算式,據此可以預估計算不同區域泥沙的沉淤量; 、 5 )本項研究首次論證了三角洲岸線動態平衡的概念,並建立了黃來沙量與造陸面積的相關關系,得了當多年平均來沙量維持在3 . 45億t時其三角洲岸線則可能處于動態平衡狀態的重要結論; 『 6 )本項研究首次提泥沙優化調控的概念,並對其宏觀優化調控模式進行了初步探討。
  8. Water invasion bursten out during the railway - tunnel construction is usually the mainly problem in constructing or operating, also which brings surface water to exhaustion and pollutes environment or effects ecology, etc. the geleshan tunnel which crosses through guan - yin gorge anticline which trend is near south north, is located between tuanjie village and jingkou village of the shapingba zone, chongqing city, which is belongs to the inducting segment of yu - huai railway. the guan - yin gorge anticline appears to ridge and slot interlacing in land form, and is composed of clastic rock and carbonate rock from jurassic xintiangou group to triassic

    歌樂山隧位於渝懷線引入段重慶市沙坪壩區團結村至井村之間,隧穿越近南北向的觀音峽背斜,地貌上表現為脊、槽相間,觀音峽背斜由侏羅系新田溝組至三疊系下統碎屑巖和碳酸鹽巖組成,歌樂山頂大部分露可溶巖地層,地表巖溶發育,有大量泉水和暗,並修建有多個中小型水庫、大量池塘和水井。
  9. This paper summarize the estuary sediment management methods also, analyze and the following aspects and give evaluations : estuary dredging and lead the flow, lead water to scour the river channel, build the xihekou reservoir, estuary gate deposition management, dike reinforced etc

    本文還對泥沙的處理途徑和措施進行了概括總結,對疏浚與導流、引海水沖刷、建設西水利樞紐、攔門沙治理、人工有計劃改漢、加高堤防和加固防護工程和挖固堤工程等進行了分析評價。
  10. By computing the water level and sedimentation processes with and without considering the extension of flow path, the results show that the effect of the river mouth path extension on the sedimentation of the trail channel is a longer period of evolution for several years or even over 10 years, and furthermore, the effect becomes weaker and weaker gradually from downstream to upstream in general

    通過比較考慮和不考慮入海流路淤積延伸2種情況的計算水位和淤積量的變化得:單一的延伸對下遊淤積的影響過程是一個相對較長的過程,需要幾年、甚至十幾年的發展,影響程度自下游到上游逐漸減弱。
  11. An experimental research on notching wet beach of the yellow river with the short - delay blasting is made for eliminating the risk that the main river channel is often threatened by some horizontal and slanting streams occurred on the downstream of the river and solving the problems from the bend cut - off for river channel harnessing, water way dredging and the siltation of the water diversion outlets along the channel

    摘要為了利用爆破解決黃下遊經常現的橫和料威脅安全的險情以及整治中的裁彎取直、疏浚航引水淤積的問題,在黃濕灘上進行了微差爆破開槽試驗研究。
  12. Based on the analysis of satellite images of various periods, landform data and river channel transverse section evolution in the lower yellow river, the characteristics of the river channel boundary condition changes at different location are clarified as middle flood channel flood transport width and area are evidently decreased especially for the main channel with comparison to 1950s, beach area that is unimpeded before become blocked because of road, irrigation channel constructed on it, and consequently intensify high edge of beach and lowering dyke and river

    在現場查勘的基礎上,通過對丹江水庫和小浪底水庫攔沙初期下遊演變、排洪能力變化特點的對比,分析了黃下游防洪面臨的新形勢:小浪底水庫攔沙初期,下遊發生沖刷,但艾山以下窄段沖淤變化不大,近年來形成的淤積萎縮的狀況難以很快改觀,游蕩性段調整劇烈,工程險機遇增大,水位流量關系中水流量以下部分同流量水位明顯降低,中水流量以上部分水位降低幅度可能會明顯偏小,防洪形勢仍不容樂觀。
  13. Customers from meizhou and heyuan shall firstly drive to guangzhou, then take the guangzhou - foshan highway to the xiebian exit, then you will reach foshan, drive along the direction to zhanjiang ( by 325 national road )

    梅州地區、源地區,首先到廣州走廣佛高速謝邊到佛山,往湛江方向行駛(走325國) 。
  14. Suggest lung kwu tan in tuen mun located near the estuary of pearl river delta and on western side of hksar for further river trade development

    屯門龍鼓灘位處香港西岸與珠江三角洲河道出口,建議闢作內貨運發展。
  15. This paper also indicates that the long - term target for adjustment productive forces of inland waterway transport is not only to maintain investment for a long period, but also to use advanced equipment and technique to raise working efficiency of inland waterway transport

    並且指航運生產力要素的長遠調整目標,是根據內航運的資金密集型行業的特點,長期持續保持投資強度,以形成完善的航、港基礎設施,同時運用現代化的先進設備技術完成傳統行業改造,從而大幅度提高內航運生產率。
  16. This was a particularly severe problem in the lower shing mun river in sha tin, but dredging and a bio - remediation project undertaken in 1997 made a huge difference to the smell of the river

    沙田城門下游以往曾有水發惡臭的問題。政府於1997年治理,在進行挖掘污染沉積物工程及利用生化處理方法改善沉積物質素,難聞氣味已較以前大幅度減少。
  17. The river mouth delta process is affected by river dynamics and coastal dynamics. the process of river delta is estimated by empirical model, analytical model and minimum stream power method. the three models are verified with field data of the yellow river mouth. the computed results are compared with field data. the demerits of the three models are pointed out

    採用經驗模型、分析模型和最小功率方法研究三角洲演變過程.根據黃三角洲資料,利用三個模型計算了三角洲岸線或沙咀寬度及岸線的平均延伸情況及對水位的影響,比較分析了各模型的計算結果,指了模型不足之處
  18. Using the 1 - d rivernet model calculates the water discharge ratio of the two branches and also duplicates the back - flow in the north branch during flood tide. the 2 - d model with a fine grid is applied to the field of flow in the changjiang estuary and the results are well in agreement with the measured flow

    同時利用網模型對長江分汊段進行一個月的水流模擬,並獲得了長江南北支分流比,復演北支漲潮時水體倒灌轉流現象,解決了網模型用於分汊潮汐水流模擬的問題。
  19. The geomorphological instantaneous unit hydrograph ( giuh ) is viewed as the frequency distribution of the times of arrival of individual water deoplets at the catchment outlet. the travel path, for a typical hillslope cell. consists of a hillslope fraction, corresponding to overland flow and a stream fraction, corresponding to concentrated channeled flow. to obtain the time of travel, velocities must be defined. hillslope and stream velocities vary with location and must be strongly correlated with slope, and therefore a spatial distribution of velocities and hence of travel times could be obtained. the present methods of giuh neglect any time delays associated with overland flow pathways

    地貌單位線被看作是流域上各水質點在弱相互作用下,到達流域匯流時間的頻率分佈。對於一個典型的山坡型網格單元,匯流路徑由兩部分組成,即坡地部分和部分,為了得到匯流時間,必須首先確定匯流速度。坡地和的匯流速度隨著區域位置而變,並且必然與坡度有關,因此,可首先計算流速的空間分佈,進而得到匯流時間的空間分佈。
  20. Using sedimentary facies analytical and formation inverse technique, the depositional characteristics and distribution of dujiatai formation of this area were described, disclosing that delta front facies and prodelta facies were mainly developed in dujiatai formation. material source are mainly from southern and northeast of the working area. sand types are mainly of delta front subwater distributaries channel sand body, river mouth bar and sheet sand body with large degree of planar variation

    2 .採用沉積相分析及儲層反演預測技術,對新齊14井區杜家臺油層儲層沉積特徵及展布特徵進行了詳細描述,揭示本區主要目的層杜家臺油層屬t -扇二角洲沉積,發育扇三角洲前緣亞相及前扇三角洲亞相,物源主要來自於工區南部及東北部,發育的砂體類型土要為扇三角洲前緣水下分流砂體、壩砂體及席狀砂砂體。
分享友人