油田模型 的英文怎麼說

中文拼音 [yóutiánxíng]
油田模型 英文
oil field model
  • : Ⅰ名詞1 (脂肪; 油脂) oil; fat; grease 2 (姓氏) a surname Ⅱ動詞1 (用桐油、油漆等塗抹) apply t...
  • : Ⅰ名詞1. (田地) field; farmland; cropland; land 2. (姓氏) a surname Ⅱ動詞[書面語] (打獵) hunt
  • : 模名詞1. (模子) mould; pattern; matrix 2. (姓氏) a surname
  • 油田 : oil field; oil deposit
  • 模型 : 1 (仿製實物) model; pattern 2 (制砂型的工具) mould; pattern3 (模子) model set; mould patter...
  1. For this purpos, from the point of the log geology, aimed at the actuality of the current fractured reservoir log geology interpretation and evaluation, based on synthetical analysis of the current domestic and foreign fruit of fractal dimension investigation of reservoir fracture, using the method and technique of fractal dimension, through the further discussion of the fractal dimension characteristics of m index and n index in the log interpretation archie model in a sample way and through the theoretic reasoning to the fractal dimension dfa and m index of fractured reservoir interval ' s log curve, according to the geophysical signification of the fractal dimension dfa of fractured reservoir interval ' s log curve shape : the more complicated the change of the curve shape is, the larger the its dfa value is, then the more complicated space structure of fracture and pore, then the higher value of m index of space structure of fracture and pore, and so on, the text propounds an improved method, based on box dimension, of covering log curve with scale grid, and by programming computes the dfa and its m index value of fractured reservoir interval ' s log curve, for instance, ac and rt curve, ect, then further puts this technique into application investigation, and makes analysis of application effects in the reservoirs located in l area of qx oil field from three aspects : 1. the dfa and its m index value of fractured reservoir interval ' s log curve, for instance, ac and rt curve, ect, which are derived from computing, is used to identify reservoir type by crossplotting m index with the product df _ acrt of fractal dimension of acoustical wave log curve and restivity log curve and by experiential discriminance plate of reservoir type in l area of qx oil field

    因此,對該區裂縫性儲集層的類識別、孔滲特徵的測井地質解釋以及儲層裂縫的發育和分佈規律進行深入的研究便成為本文研究的出發點。為此,本文從測井地質的角度,針對當前裂縫性儲層測井地質解釋與評價的現狀,在綜合分析當前國內外儲層裂縫的分形分維研究成果的基礎上,利用分形分維方法和技術,通過對archie測井解釋中的m指數、 n指數的分形分維特性的深入淺出的論述以及裂縫性儲層段測井曲線分維d _ ( fa )與m指數的理論推導,根據裂縫性儲層測井曲線形態分維值的地球物理意義? ?曲線變化越復雜,則其分維值d _ ( fa )越大、裂縫孔隙空間結構越復雜、裂縫孔隙空間結構指數m值越高等特徵,提出了改進的基於盒維數的測井曲線網格覆蓋法,編程計算了裂縫性儲層段常規測井曲線(如聲波和電阻率曲線)上分形分維值及其m指數值,進而從以下三個方面對qxl區塊的裂縫藏進行應用研究,效果十分理想: 1將計算得到的可變的m指數與聲波和電阻率分維之積df _ acrt進行交繪,採用儲層分維值分類技術統計分析這些參數變化的規律,並結合qxl區塊儲層類經驗判別圖版,從而實現qxl區塊下白堊統的裂縫性儲層的類識別。
  2. The foundation of reservoir model and residual oil prediction have been the core of reservoir detailed description for improved oil production and enhanced oil recovery

    儲層地質的建立和剩餘分佈的預測已成為開發中後期藏描述的核心。
  3. This paper researches the basic statistical rule of oil - gas dynamic system from the systematic theory, combining with the common characteristic and structure characteristic of oil - gas dynamic system, taking the design requirement of oil field development programming into consideration, by using of functional simulation principle ( including nn method, differential simulation method ) and historical data of oil field, establishes the in - out conjunctional relationship of dynamic index of oil field development, and researches the two level index prediction of development dynamic with both oil field and oil production plant on the basis of the in - out conjunctional relationship. furthermore, this paper analyzes the " decision - making variable ", " object " and " restriction terms " by the optimization theory and set up several optimal models which compose the oil field development programming, it is following : optimization model of the production composing ( solving the optimal composing of each subentry production and cor responding cost, workload, including the onshore thin oil production, the heavy oil thermal process production, tertiary oil recovery production, and the offshore production ) ; optimization model of measure production structure ( determining the optimal composing of each measure production and measure workload, which is composed of fracture, acidulation, capital repair and so on ) ; optimization model of the production distraction ( optimal distribution of the whole oil field production to each oil production plant ) and the integrated development programming model of oil field

    本文從系統理論出發研究氣動態系統基本統計規律,結合氣動態系統的一般特點,結構特點,兼顧開發規劃設計的要求,利用功能擬原理(含神經網路方法、微分擬方法) ,依據歷史數據,建立了開發動態指標間的輸入輸出關聯關系,並在此輸入輸出關聯關系的基礎上研究了及採廠兩級的開發動態指標預測,同時利用最優化原理,在分析「決策變量」 、 「目標」及「約束條件」的基礎上建立了多個構成開發規劃的「優化」 ,這些優化包括:產量構成優化(解決陸上稀產量、稠熱采產量、三次採產量、海上產量及對應的成本、工作量的最優構成問題) ;措施產量結構優化(解決壓裂、酸化、大修等各項措施產量及措施工作量的最優構成問題) ;產量分配優化(將的產量最優地分配到各採廠)以及綜合開發規劃
  4. A stochastic chance - constrained programming model is put forward for incremental measures program of oilfield, which uses the most increasing output as objective and takes both cost and work quantity into account. at the same time, the process of its hy - brid intelligent algorithm is also provided

    措施增產最大化為目標,兼顧成本、措施量等目標,建立了措施配置的隨機機會約束規劃,並給出了的混合智能演算法。
  5. In this paper, first introduce the geologic model of continental sedimentation, the rock physics expression about oil and gas reservoir of shengli oil filed

    本文首先介紹了陸源沉積儲層的地質,勝利部分、氣儲集層的巖石物理學特徵。
  6. In the brief introduction to geographical information system ( gis ), this dissertation proves that by combining reliable management with gis technology, presents a method which built the power structure model and math calculation model by using spatial data in a good interface between computer and user. this dissertation makes a number of target for calculating the distribution system, mainly aimed at circumstances which have an effect on power station repair, switch breaker, type of t connection, and double lines supply via the usage of system reliability calculation. at the same time, it provides the projected estimatio n when power station or transmission line will be added into the power system, and furnishes the theoretical information that the professional needs for power structure programming, design and equipment management

    通過建立輸變電設施管理信息系統( mis ) ,真實地反映出電網輸變電設施的運行管理現狀,為網路可靠性計算提供可靠的計算依據;在簡述地理信息系統( gis )技術的基礎上,論證了可靠性管理與電力gis技術結合的可能性,創立了在簡潔的人機圖形界面下利用空間數據建立網路結構及可靠性計算的方法;通過建立網路可靠性計算系統,進行了計及變電所檢修影響、切換開關、 t接點及雙回線供電情況下的可靠性指標計算分析,對電網及變電所(線路)的改(擴)建方案、增強性措施及接入系統的可靠性給予了工程評估,為電網規劃、設計及日常的設備管理提供分析決策依據。
  7. Applying spatial interpolation and data topographty model, realizes that isoline data create grid data, forms surface and makes three - dimensional geological body, according to the actual demands in oil and gas field development

    運用空間插值、數字地形等方法,根據開發中的實際需要,實現由等值線數據生成網格數據,形成構建表面,最終得到三維地質體。
  8. The model could be used to match and predict the entire process of oil - gas field development, including the periods forproduction rate going up, peaking, and gelling down, for all development index, with its precision higher than all the other models, and can be widely recommended

    可以對開發全過程,其中包括產量上升、達到高峰與產量下降階段在內的整個開發指標進行擬合與預測,其精度要高於其它各種,具有推廣價值。
  9. This paper, based on normalizing well logging data while drilling and correcting depth into true vertical depth and calculating reservoir parameters and etc, combining the practical ease of mobei oilfield, extracted logging and geological pattern characteristic of target oil - gas formation and geosteering mark formation, and used bp neural network and regressive analysis to create predicting mode of geosteering parameter to build relevant contrast curve ; adopted geometry geosteering method to fix on die drilling direction of bit upper and declination, the position in reservoir, to judge the real drilling case. all finely solved the problem to follow the geological target while drilling for three horizontal well these methods improve the drilling horizontal well ability by using the techniques to follow the geological target while drilling, and then it is convenient and practicable

    本文在開展隨鉆測井資料的標準化和斜井校正及儲層參數解釋與含流體性質判釋等工作的基礎上,結合研究工區莫北的實際情況,提取了目標(氣)層和導向標志層的測井地質式特徵,並採用bp神經網路法和回歸分析法建立了地質導向參數的預測、構造了相應的對比曲線;採用幾何導向法確定鉆頭上下傾鉆進方向及其在目標層的位置,以判斷實際鉆進地層情況,很好地解決了研究工區三口水平井的隨鉆跟蹤地質目標的問題。
  10. It can reflect mechanical characteristics of geological model for the field of geostress in the oil field correctly and truly. it has very high efficiency also

    它能較準確地反映應力場地質的力學特性,精度高,也有很高的效率。
  11. A real example testifies the efficiency, practicability and intellectual ability of this method, which provides a new decision basis for the incremental measures program of oilfield

    實例表明,該理論基礎嚴格,求解方法科學有效,並具有一定的智能性,為措施配置提供了新的決策依據。
  12. The model can be used to analyze accurately the effect of individual interrelated factor on production decline rate, support regulative countermeasures and modify the natural decline rate in an oilfield

    可準確地分析各相關因素對遞減率的影響程度,從而為制定控制自然遞減率的調整對策提供了依據。
  13. This article introduces the handle object and applied conditionetc. using the software the amount of test work can be decreased, the designing level of oilfiel surface technology canbe hightened, the practicality of the design raised, the production technology condition can be improved or optimized and the economic effency enhanced

    氣舉是中原文東的主要採方式.針對該連續氣舉開發過程中出現的注入氣利用效率低,綜合效益差的問題,建立了在供氣能力有限時的優化配氣數學,並給出了解析法求解過程.現場試驗表明,應用該技術可以實現連續氣舉井的合理配氣並提高井產量,適合在推廣應用
  14. Following the conventional structural design philosophy, the pile structure of weizhou 11 - 1 platform usually use the type of main pile

    按照常規工程結構設計思路,潿洲11 - 1這樣規的淺水平臺樁基結構,通常採用主樁結構式。
  15. Submerged dyke is a common offshore structure, which is widely used for band protecting and silt promoting engineer and etc. however, few research studies are done upon such a problem home and abroad and even the accomplished results are not satisfying, which cannot be used for real projects, and in most cases, they will have to depend on the results of experiment

    然而,目前國內外對潛堤的研究很少,研究的成果也很不成熟,難以應用到實際工程設計中,在很多時候,還需要藉助於物理試驗,因此,本文結合勝利保灘促淤新技術研究項目,對潛堤波浪力以及透射特性進行了深入系統的研究,力求揭示其內在規律,期望能獲得有實際應用意義的研究成果。
  16. Integrated with the correlation between natural and composite decline rates as well as the characteristic of production testing data, the model for natural decline rate is established

    在此基礎上,結合一般的生產測試數據特點和自然遞減率與綜合遞減率的關系,建立了自然遞減率多因素分析
  17. After synthetically analyses and researches of the existing methods for injection allocation rate, this article takes the group of water - injecting wells in waterflood oilfield as the research unit, the multiple regression method to decide the injection allocation rate is applied, by which and its regression coefficient and partial correlation coefficient, the multivariate regression models of model and model are developed

    在對目前存在的配注方法的綜合分析和研究之後,提出以水驅注水井井組為研究單元,採用多無回歸方法來確定注水井井組配注量,並基於多元回歸方法的回歸系數和偏相關系數,分別建立了多元回歸、 。
  18. Using normal probability model is more simple and efficient to determine performance and characteristic parameter of waterflood oilfield, so it is feasible and practicable to forecast water cut and oil recovery of waterfood oilfield and evaluate its development measures

    摘要應用正態概率可以方便地確定水驅動態變化、描述水驅特徵參數,這就使得預測含水率、採收率、評價並發措施變得比較簡便而實用。
  19. The article introduces the basic concepts and common methods of fuzzy mathematics, initially discussing the applications of fuzzy mathematics in the following aspects : 1 ) division of " skidding " strata with grade of membership that are drilled with diamond bits ; 2 ) comprehensive evaluation on the application in evaluation of diamond bits, classification of rock drillability, and evaluation of clay ; 3 ) classification of " hard rock " through fuzzy clustering analysis ; 4 ) estimation of completion time of boreholes and evaluation of underg round water with fuzzy mathematics ; 5 ) identification of new ore areas and option of best water resource area with fuzzy model ; 6 ) option of diamond bits and evaluation on oil field development plan with fuzzy resemble option and the improved calculation method ; ? ) prediction of mud slurry performance and of the amount of surging water in ore pits with fuzzy control ; 8 ) comprehensive evaluation of diamond bits and supporting plan of deep foundation pit with fuzzy optimal theory

    初步探討了以下幾方面的應用: 1 )用隸屬度劃分金剛石鉆進「打滑」地層; 2 )綜合評判在金剛石鉆頭評價、巖石可鉆性分級及鉆探造漿粘土評價中的應用; 3 )用糊聚類分析進行「硬巖石」分類; 4 )用糊數進行鉆孔竣工時間預估及地下水質評價; 5 )式識別在新礦區類識別和最佳水源地選擇中的應用; 6 )糊相似選擇及其改進演算法在金剛石鉆頭選擇和開發方案評價中的應用; 7 )糊控制在泥漿性能和礦坑涌水量預測中的應用; 8 )優化理論在金剛石鉆頭和深基坑支護方案綜合評價中的應用。
  20. According to the competence construction theory and based on the scrupulous and rigorous " transplantation " of geological mechanics model in developing oil field, this paper reveals the internal organism of talent internationalization strategy, puts forward the ideas of " ecological " environment, transition organism of accumulation and reasonable utilization strategy for internationalized talents

    摘要依據能力建設理論,在有內在根據、審慎嚴謹地「移植」基於地質力學開發油田模型的基礎上,揭示出人才國際化戰略的內在機理,提出了國際化人才產生的「生態」環境、集聚的遷移機制、合理的使用策略。
分享友人