泄水工程 的英文怎麼說

中文拼音 [xièshuǐgōngchéng]
泄水工程 英文
outlet work
  • : Ⅰ動詞1 (液體、氣體排出) let out; discharge; release 2 (泄露) let out (a secret); leak (new...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  1. A comment upon gazdar ' s theory of contextual transform

    管涵對頂施技術
  2. In this paper, those uncertain factors affecting the flood discharge are discussed, especially the uncertainty of flood hydrograph

    本文全面考慮了影響施導流及洪風險的不確定性因素,重點分析了洪的不確定性對施導流及洪風險的影響。
  3. In this thesis hydraulic experimental studies and theoretical analyses on the vortex - flow drop shaft were conduced and the following results were accomplished : ( 1 ) in the model test some hydraulic characteristics including the shape of air core in the center of the drop shaft, the radial distribution of water flow velocity and the distribution of pressure on the wall of the drop shaft were measured under the condition of high water head above 250m and large discharge above 1400m3 / s. ( 2 ) a kind of computational method for the spiral water flow in the air core region of drop shaft was discussed and applied and the results agree the experimental data well. ( 3 ) the total ratio of energy dissipation in the drop shaft can reach 90 % and the energy dissipation in every region was discussed quantitatively

    本文通過試驗研究與理論分析對旋流式豎井洪洞應用於高頭、大流量情況時存在的一些力學問題進行了研究和探討,取得以下主要成果:一、結合小灣導流洞改建,對高頭( 252m ) 、大流量( 1400m ~ 3 s )條件下旋流式豎井中的流運動特徵進行了比較全面的測量,包括空腔形態、徑向流速分佈及井壁壓強等;二、提出了豎井空腔段螺旋力計算方法,其計算結果與實測值吻合良好;三、利用試驗與計算結果,對旋流式豎井的消能機理進行了探討,對豎井各部分的消能能力有了總體認識;四、對豎井下部消力井的合理井深進行了優化試驗研究,發現消力井合理深度為0 . 9d左右;五、通過試驗研究,歸納出豎井流總摻氣量估算方法,為導流洞排氣方案的設計提供了參考依據;六、在高頭、大流量條件下,豎井空腔段下部流速很高,盡管流螺旋運動引起的離心力可以確保井壁壓強保持正壓,但空化數依然較低,因此豎井的空化空蝕始終是界關注的重大問題。
  4. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧流河庫供頭部由引渡槽、節制閘、進閘、閘等建築物組成。由於本場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內流流態是否滿足要求,需要經過模型試驗進行論證,以確保的可靠性。旁通管具有上要求,對其過流能力也要經試驗確定,為碧流河庫增建旁通管設計提供依據。
  5. This paper is based on the engineering background of the real time fault diagnosis of the deashing system in zhenjiang jianbi power plant. this system, as the subsystem of a typical distributed control system, can achieve the processing automaton and malfunction alerting automaton. during writing this paper, the following work has been done :

    本文基於實際背景,研究與探討了鎮江諫壁火力發電廠高濃度除灰控制系統中的柱塞泵灰漏實時檢測系統,該系統是典型的dcs控制系統的一個子系統,使電廠高濃度除灰車間實現了故障報警自動化。
  6. Energy dissipation and erosion control of stepped overflow structure on key dam of gully correction

    治溝骨幹臺階式建築物的消能防沖研究
  7. The construction projects which may induce serious secondary disasters mentioned in this law refer to construction projects which may, as a result of earthquake damage, lead to flood, fire, explosion, leak of a large amount of hypertoxic or strong corrosive materials and other serious secondary disasters, including such projects as large dams, embankments, petroleum and gas tanks and the facilities storing inflammables or explosive substances, hypertoxic or strong corrosive materials and other construction projects which may induce serious secondary disasters

    本法所稱可能發生嚴重次生災害的建設,是指受地震破壞后可能引發災、火災、爆炸、劇毒或者強腐蝕性物質大量漏和其他嚴重次生災害的建設,包括庫大壩、堤防和貯油、貯氣、貯存易燃易爆、劇毒或者強腐蝕性物質的設施以及其他可能發生嚴重次生災害的建設
  8. The inner - plant economical operation of lijiaxia hydropower station is studied based on the disadvantageous operating mode area of the units determined by school of civil engineering of tianjin university and the actual operating experience of the lijiaxia hydropower station in the last a few years

    摘要以天津大學建築學院確定的李家峽電站機組的不利況區為依據,以近幾年來該電站的實際運行經驗為參考,在綜合考慮機組初始運行狀態、機組振動特性、機組出力、下流量、庫蓄量和電網負荷平衡等因素的基礎上對李家峽電站的廠內經濟運行進行了研究。
  9. Many geological and hydrological factors of the river section, where the yellow river water intake engineering is laid out, such as the capacity of the reservoirs along the river section upstream and downstream, the rate of the flow discharge, the erosion and silt of the watercourse, the form of the riverbed and the water current, ice tuck, the convergence of the upstream branches of the river section, flood crest, sand crest size, the capacity for flood discharge of the watercourse, the effect of flood control structure around and the impacts on surrounding environment and the third person " s legitimate rights and interests, should be considered

    黃河取的布設要考慮所處河段的地質文等諸多因素。如該河段上下游庫的庫容,流量、河道沖刷、淤積、河床形態、流形態、冰塞、河段上游的支流匯入、洪峰、沙峰的大小、河道行洪能力的大小、周圍防洪的影響及對周圍環境和第三人合法權益的影響等等。
  10. Because of obstructing by impermeable wall, groundwater drainaged long time brings about immersion, whether or not this will result in a series of water surroundings problems, such as farmland salinization, marsh, lowering of ground temperature and so on, which are all focused on by government, resident, experts in engineering, hydrogeology, agriculture and surroundings

    而是否會因為防滲墻的阻隔,地下長時間得不到排而產生浸沒,造成農田鹽堿化、沼澤化和地溫降低等一系列環境問題,均系堤防建設區各級政府、沿江居民和國內外部分文地質專家、農業與環境保護專家共同關心的話題。
  11. Some ideas on the special through engineering of the weep

    孔特殊貫通的幾點認識
  12. Computerized supervisory and control system for discharge sluice in feilai gorge hydraulic project in guangdong

    飛來峽利樞紐閘計算機監控系統
  13. Abstract : the computerized supervisory and control system for dischargesluice in feilai gorge hydraulic project in guangdong province is introduced, and the hardware and software design and the functions of this system are presented

    文摘:介紹了廣東省飛來峽利樞紐閘計算機監控系統,並對該系統的硬體設計、軟體設計進行了描述,同時對該系統的功能進行了介紹
  14. On the basis of the safety system engineering theory. applying the dow fire & explosion index and the normal stability gauss mathematical diffusion model etc., combining with the practice of mouping port, the hazards during the handling and storage of liquid chemicals in bulk have been analyzed and the risks of fire explosion and leakage ( including water pollution and water pollution ) have been assessed. taking into account of insufficient consideration of the human factor in the dow fire & explosion index, the soft compensation coefficient has been raised

    本文以安全系統為理論基礎,運用道氏火災爆炸指數法、平均運動方組以及常穩態高斯數學擴散模型,結合牟平港散化運輸、裝卸的實際,對牟平港散化儲運的火災爆炸危險性和毒物漏危險性(包括污染性和大氣污染性)進行了定性和定量的分析評價。在評價序上,針對道氏火災爆炸指數法中對人為因素和管理平等考慮不足的問題,提出了軟補償系數的概念,找出了散化碼頭日常監督管理作的重點。
  15. Application of polymer silicon powder mortar in reinforcing the floodgate project of longfengshan reservoir

    聚合物硅粉砂漿在龍鳳山洪閘加固中的應用
  16. The department took part in the study on the renovation of sanmenxia reservoir, this picture shows sediment sluice from the reservoir

    圖為三門峽庫樞紐正在流排沙,泥沙所參加了三門峽庫改建的科研作。
  17. According to the comparison of many alternatives, the repair scheme of the releasing tunnel adopted the alternative of installing temporary sealing gate to form dry land construction conditions so that the repair scheme has been completed smoothly

    空洞修復,經多種方案比較,最終優選下安裝臨時封閘門,形成旱地施條件,完成了檢修
  18. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽電站右岸旋流內消能洪洞是國內第一個量達1000m s 、頭超過100m ,即將修建的旋流式內消能洪洞,其方案的論證與試驗研究以及建成后投入使用,將在國內外旋流式內消能洪洞設計、研究與應用中具有重要的意義,將有力的推動這一新的消能形式在中的應用,從而為解決高壩建設中建築物的高速流問題與導流洞改建的技術與經濟問題提供實例,對推動與發展力學的研究與發展均具有重要的理論與實踐意義。
  19. Dynamic control of the limit water level belongs to non - structural measures of reservoir operation. with the analysis of the cause and rule of flood in the catchments and taking advantage of hydrology and metrology information, the operable method can be obtained which not only satisfies the flood prevention but also takes full advantage of flood resources, and the upper and lower limits of the limit water level are determined with serial hydrology calculation. then, the rule of using the upper and lower limits is put forward to reach a beneficial flood operation with small risk

    汛限位動態控制方法屬於庫風險調度的非措施范疇,通過分析流域洪的成因和庫區降雨及致洪規律,結合庫的蓄能力,積極慎重的利用文氣象預報信息,研究既能滿足防洪要求,又可充分利用洪資源的可操作性的調度方法,利用文系列的連續演算方式推求汛限位的變化范圍,提出使用汛限位上下限的原則,達到風險較小、效益較大的目的。
  20. Introduced by prestressed pier in the gate of spillway in xiao xia hydroelectric power station, the text reasonably established 3 - d finite elements mechanic model by the advanced finite elements popular in the world which can expediently impose tension of anchor funicular at its place. it also considered possible diversified combination of loading, and indicated that the effect of its prestressed action is fruitful compared with its conventional counterpart by study of mechanic calculation in comparison. as a result, it vastly improved burdening state of pier. by analysis of 3 - d finite element method, it also gained the stress result indifferent boundary conditions such as breast wall joint support and fixed support, and the displacement result in diversified loading combination. those results gained the instructive and reference value in design of prestressed pier

    本文結合黃河小峽電站洪閘預應力閘墩這一實踐,採用國際上已成熟的有限元方法,合理地建立了預應力閘墩的三維有限元模型,該模型可方便地按預應力錨索的點位施加錨索預張拉力,考慮了可能發生的多種荷載況組合,並與無預應力閘墩結構進行了對比分析研究,指出其預應力效果是明顯的,可以大大改善閘墩結構的受力狀態,通過三維有限元分析,還得到了胸墻簡支、固端不同情況下的應力成果和各荷載下的位移成果,這些成果的取得對預應力閘墩的設計具有一定的指導和參考價值。
分享友人