泉徑流 的英文怎麼說

中文拼音 [quánjìngliú]
泉徑流 英文
spring runoff
  • : 名詞1 (泉水) spring 2 (泉眼)the mouth of a spring; spring3 (錢幣的古稱) an ancient term for...
  • : Ⅰ名詞1 (狹窄的道路; 小路) footpath; path; track 2 (達到目的的方法) way; means 3 (直徑的簡稱...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  1. Could there exist another possibility for the south boundary of the system as follow : the rainfall infiltrates in the outcrop carbonate - mountain area of western, and moves towards south and deeper along carbonate rocks, then moves upper through the overlain tertiary system ( n ) with a thickness of 400m ( instead of running off to the springs and yellow river through a long approach of least hydraulic gradient ), and then mainly transforms into the horizontal drainage in the loess layer of quaternary, finally drains in lu - botan depres sion

    並且提出,關于對系統南界的認識,是否存在另一可能:即在西部碳酸鹽巖裸露區大氣降水入滲后,沿碳酸鹽巖向南向深部運動,然後,並非在極小的水力坡度驅動下長距離地向東部黃河、排泄,而是通過上覆厚度約400m的第三系向上運動,繼而主要在第四系黃土層中轉為向南水平排泄到鹵泊灘。
  2. ( 2 ) with the systematical clustering method, the 33 - year runoff data had been redevided into several clusters in order to predict the distribution of the runoff in future

    ( 2 )應用系統聚類分析原理,對黑水庫33年資料重新進行了典型年劃分,為預測未來水庫年水量分配提供了參考依據。
  3. The main results of this paper are as follows : ( 1 ) the operation chart for individual and associated operation of new and old units, is plotted by using series of multiyears flows and the associated charts is advised to direct the reservoir operation. ( 2 ) on the basis of analysis on the characteristics of hydro - information observation system and flood forecasting system, some key problems in flood operation such as dispatching period of time, decision - making method and so on are studied. ( 3 ) the study and development of flood - dispatching simulation model

    論文取得的研究成果如下: ( 1 )採用長系列資料,繪制了新老機組單獨運行和聯合運行調度圖,通過對比分析,建議採用聯合運行調度圖來指導水庫運行; ( 2 )在對石水庫水情測報系統和洪水預報系統的特點進行分析的基礎上,研究了洪水調度中的幾個關鍵問題,如調度時段、決策方法等; ( 3 )洪水調度模擬模型研究與開發。
  4. Drinking groundwater source in the city of xingtai lies in baiquan karst water system of runoff and emission which is in front of the taihang mountains

    摘要邢臺市區地下飲用水源位於太行山前儲存兩種相當豐富的巖溶水和孔隙水的百排泄區。
  5. The karst water moves from south to north. after moving to jinan city, the karst water is blocked by igneous bodies, the karst water passes through fissures and karst and gushes out to the surface as springs

    來自南部補給區的巖溶地下水至老城區附近,遇到巖漿巖體阻隔,在地形低洼部位通過淺部石灰巖巖溶裂隙湧出地表,形成濟南諸
  6. To develop a new approach so as to realize music fountain control with high quality, this paper describes the control design for music fountain system based on the industry personal computer. pwm frequency conversion timing, preprocessing, predicting and compensating algorithm, and software signal control in advance are adopted, which realize color music spring control with high quality, provide a new advanced method for the control design of music spring

    本文採用pwm變頻調速、預處理、預測補償控制和基於數據庫的軟體信號提前控制方法,提出了一種新的先進的音樂噴設計方案和控制途,並與傳統設計方案進行了分析比較,用面向對象的編程方法完成了對當今較為行的mp3音頻格式的解碼,同時實時提取了音頻信號。
  7. Infiltration of atmosphetic water and river leakage are the major supply source of krast water in jinan spring field, while artificial water - taking and spring discharge are its major discharge forms. the karst water flows from south to north in the whole and the average recharge capacity is 55 x 104m3 / d

    巖溶水補給來源主要為大氣降水滲入和河滲漏,排泄方式主要為人工開采和水排泄,總體向北域多年平均補給量為55萬m ~ 3 d 。
  8. According to the established model of decomposition - coordination for group hydropower station, the optimal cooperating operation study is utilized to the hydropower stations of shiquan and xihe river. simulative operation of optimal cooperation in series of runoff data measured of 44 years is performed

    根據建立的水電站群優化調度分解協調模型,對石、喜河水電站進行聯合優化調度研究,以44年實測系列資料進行長系列優化調度模擬運行。
  9. We all three alighted, and walked, by a damp soft footpath in a garden where a neglected fountain had overflowed, to the door of the house

    我們下了車,沿著花園潮濕柔軟的小走去。那兒有一溫水,由於無人管理,已經溢出來,到宅院門口。
  10. Mortgage securitization is the headspring of the energy of real estate industry. from the evolution of mortgage securitization in hongkong and some foreign countries, mortgage securitization is almost the only financing approach for people to realize their housing dream. mbs has improved the liquidity of mortgage loans, broken capital ' s area limit and machine limit and otherwise

    住房抵押貸款是住房業活力的源,國內外的實踐證明,住房抵押貸款幾乎是居民實現購房夢的唯一融資途,而住房抵押貸款證券化通過將巨額的抵押貸款動化和打破資金地區限制、機構限制等為住房抵押貸款提供堅強的後盾。
  11. Be way of " the third profit mine ", modern times enterprises are making logistics management main approach of breaking away from a pretty pass and bringing up core competing strength

    現代物作為「第三利潤源」而紛紛被現代企業作為擺脫困境、培養核心競爭力的主要途
分享友人