泥墊 的英文怎麼說
中文拼音 [nídiàn]
泥墊
英文
mud mat-
B. baluster and ground connect together
B墊木與水泥地面連接4 the connecting among straight step, baluster and ground should follow the next requirements besides the common requirements
4踏板墊木與水泥地面連接除達到正常要求外,還應達到以下要求:Observing that we were sitting on a dirt floor, she worried that we might catch colds during the morning and evening meditation sessions, so she instructed the working members to buy aluminum foil pads and place them on the floor of the meditation hall
師父看大家打坐時坐在泥土地上,擔心我們早上或晚上受寒,因而指示工作人員購買錫箔墊鋪在大殿的地上。工作人員即刻行動。Mudguard, gear cover, window door strip, absorber, steering wheel, dust cover, pedal, handle
汽車擋泥板,排檔罩,門窗封條,墊片,方向盤,防塵套,腳踏板,手把Work surface : i use a sheet of clear acrylic under which i put a large sheet of graph paper which guides me when cutting canes or sheets of clay to size
工作面板:我使用一張丙烯酸材料的墊板,在其下我放了一大張坐標紙,它可以幫助我按照切割軟陶泥。Work surface [ / b ] : i use a sheet of clear acrylic under which i put a large sheet of graph paper which guides me when cutting canes or sheets of clay to size
工作面板:我使用一張丙烯酸材料的墊板,在其下我放了一大張坐標紙,它可以幫助我按照切割軟陶泥。[ b ] work surface [ / b ] : i use a sheet of clear acrylic under which i put a large sheet of graph paper which guides me when cutting canes or sheets of clay to size
工作面板:我使用一張丙烯酸材料的墊板,在其下我放了一大張坐標紙,它可以幫助我按照切割軟陶泥。The thickness of splint should depend upon the height of cusps and the overbite degree of the patient, so, that free way space wasn ' t absolutely inviolable in the set of stabilization splint
至於(牙合)墊厚度則可根據患者牙尖高度,覆(牙合)程度的具體情況而定,不必拘泥於息止(牙合)間隙的限制。Standard specification for backer material for use with cold - and hot - applied joint sealants in portland - cement concrete and asphalt joints
硅酸鹽水泥混凝土和地瀝青接頭加熱和製冷接縫密封膠襯墊材料的標準規范Abstract : based on the indoor test results of the base bedding course materials for cement concrete pavement and prevalent actural calculation approach of the prevalent norms, and according to the different compositions in changtan expressway and in consideration of the experiences gained in the central and southern region, a typical structure legend for cement concrete pavement which is suitable for areas damp and with plenty of rainfall the typical structure and guideline for the use of the typical structure legend are presented in this paper
文摘:通過對南方多雨地區目前常用的水泥混凝土路面基墊層材料的室內試驗,依據現行規范的結構計算方法,進行不同結構組合驗算與長潭高速公路試驗路段現場檢測,並參考中南地區使用經驗,提出了適應多雨潮濕地區水泥混凝土路面典型結構圖例,論述了運用典型結構圖例的原則及指南。Here i render the remaining bits and pieces ; cables, seat binder, fenders, handlebars etc
在這里我給剩餘的車把和接合處、纜線、坐墊、擋泥板、手把等等上了色。Standard specification for rubber rings for asbestos - cement pipe
石棉水泥管用橡膠墊圈的標準規范He soon perceived that a slope had been formed, and the rock had slid along this until it stopped at the spot it now occupied. a large stone had served as a wedge ; flints and pebbles had been inserted around it, so as to conceal the orifice ; this species of masonry had been covered with earth, and grass and weeds had grown there, moss had clung to the stones, myrtle - bushes had taken root, and the old rock seemed fixed to the earth
圓形的大巖石旁邊,還有一塊大石頭,這塊大石頭以前一定是用來頂住大圓石的滾勢而做墊石的,巖石四周塞了許多石片和鵝卵石來掩飾洞口,周圍又蓋上了些泥土,野草從泥土裡長了出來,苔蘚布滿了石面,香桃木也在那裡生了根,於是那塊大石就象是根深蒂固地長在地面上的一樣了。Suspension construction method : use saws to cut the plywood 9 c 12mm thick into square blocks sized between 600 c 120 mm and securely nail them into the concrete ground at an interval of 20 mm
步驟3 :墊層鋪設1懸浮施工法:將9mm - 12mm厚的夾板鋸成600mm - 120mm的方塊間隔20mm釘牢水泥地面。Based on the discussion above, firstly in this article, it researches the deformation situation of pile soft soil flexible foundation of djcm pile composite ground under flexible foundations and the effecting law to the mechanic characteristics of soil while making pile through the model test in library
基於上述考慮,本文首先通過室內模型試驗,研究了柔性基礎下水泥粉噴樁地基中樁、樁間土和柔性基礎(試驗中為砂墊層)的變形情況,以及水泥粉噴樁在成樁過程中對樁間軟土物理力學性質的影響規律。Thin bed slurry method
薄墊泥漿法He cleaned the mud off his shoes on the shaggy mat in front of the door
他在門前的粗糙的墊子上把鞋上的泥蹭掉。Bed of debris
巖屑和泥餅墊層According to the findings of a geotechnical study, a very small number of bushes and shrubs would need to be removed. the reinforced slope will be covered with anti - erosion mat to stabilize the soil and then grass will be planted
根據土力顧問研究結果,工程進行時必須及迫不得已除去少量灌木叢,在已加固的斜坡上鋪上防侵蝕護墊,穩固沙泥,再於上種植草被。What seemed like it would bury the donkey actually blessed him - because of the way in which he handled his adversity. this is a key to one of the mysteries of life. if we face our problems, respond to them positively and refuse to give in to panic and bitterness, the adversities that come along to bury us usually have within them the potential to benefit and bless us
事實上,我們在生活中所遭遇的種種困難挫折就是加諸在我們身上的泥沙然而,換個角度看,它們也是一塊塊的墊腳石,只要我們鍥而不舍地將它們抖落掉,然後站上去,那麼即使是掉落到最深的井,我們也能安然地脫困。分享友人