泥工 的英文怎麼說
中文拼音 [nígōng]
泥工
英文
bricklayer-
Design of warm air pipe for cement plant
水泥工廠熱風管道設計Removal of sediment in cheung sha wan fish culture zone
清除長沙灣魚類養殖區海床淤泥工程The tray granulator for cement industry
水泥工業用盤式成球機From the mid - seventeenth century decorative arts such as goldsmithery, plasterwork and glass flourished in conjunction with the large - scale public buildings of the time
從17世紀中葉開始,金匠製作的金器、抹灰泥工作和玻璃等裝飾藝術與當時的大規模公共建築物一同盛行起來。Although i have plenty of disciples, can have anything i want and believe theres nothing that you would refuse to give me, i still work to fulfill my own financial needs. why do i paint pictures, make handicrafts and even do plasterwork myself
雖然師父徒弟很多,我如果要什麼都會有,我相信你們沒有什麼東西不會送給我的,不過,師父為什麼要自己賺錢自己畫畫自己做手工,甚至水泥工也要自己做呢?Case - hardened kiln use - reducer in the cement industry
水泥工業用硬齒面窯用減速機Case - hardened reducer for rolling press in the cement industry
水泥工業用硬齒面輥壓機用減速機Improved hand picking technology greatly enhance the mineral processing tate of waste in many dressing plants. the flotation in normal temperature is a big breakthrough in mineral processing technology of scheelite. improved jig sizing applied in roughing and grqvity dressing, and improved tungsten fine deposit recovering technology enhance the recovery of tungsten fine deposit
手選工藝的改進,使各選廠的廢石選出率得到大幅度地提高;常溫浮選是白鎢選礦工藝的重大技術突破;推廣並改進動篩跳汰使這在粗、重選中獲得應用;鎢細泥工藝的改進提高了鎢細泥的回收率。Application of wolfram tailings in cement industry
鎢尾礦在水泥工業中的應用Emission standard of air pollutants for cement industry
水泥工業大氣污染物排放標準Air sliding conveyor for cement industry
水泥工業用空氣輸送斜槽A project with earthworks and other building works partly in an existing site of special scientific interest - about 250m length of the proposed cable tunnel passes though the existing castle peak site of special scientific interest ( sssi ) at a depth of about 300m below the surface
包括挖泥工程及其他建築工程在內的工程項目,而該等項目部分位於現有的具有特別科學價值的地點?擬建的電纜隧道中一段約250米長的隧道于地面下約300米經過現有的青山具有特別科學價值的地點。Technical conditions of multi - air channel coal burner for cement industry
水泥工業用多風道煤粉燃燒器技術條件4 for dredging works, only mechanical dredgers with bucket - type closed - grabs shall be used for the dredging of river bed or ponds
進行挖泥工程時,只可使用密封抓鬥式的機械挖泥機,以挖掘河床或塘底的淤泥。So far, dredging works and dumping of mud have been conducted in accordance with the statutory provisions and recommendations in the eia report to mitigate environmental impacts to acceptable levels
直至目前為止,挖泥工程及卸泥工程都是按照環評報告內的法定條文及建議進行,把對環境構成的影響減至可接受水平。Wwf seriously doubts that a marine park and an lng terminal at soko could be compatible, given that the terminal will lead to consistent large scale maintenance dredging work, which benthic communities will take years to recover from, continuous discharge of antifouling chemicals and extreme changes of seawater temperature in the marine environment
本會非常懷疑海岸公園與液化天然氣站共存的可能性:興建液化天然氣站將涉及大型挖泥工程,底棲群落必須經過多年才能恢復原貌此外氣站將不斷排放防塞化學品,海洋環境中的海水溫度亦會急遽轉變。16 17 completed the first phase of the earthmoving works in
基圍16 17第一階段推泥工程已經完成Heat resistant steel castings for cement industry
水泥工業用耐熱鋼鑄件Nomex ( aramid ) : asphalt plants, chemical plants, cement plants, high resistance to heat, high wetness resisting temperature
諾美克斯(芳族聚酸胺) :瀝青工廠,化工廠,水泥工廠;高抗熱性,高耐潮性。Also, the author ’ s design strategy and creativity has been given in this paper. specifically, it includes : based on the feasibility analysis of the fit selection of control parameters in the aeration process, the aeration process of wastewater treatment of the joint - constructional complete - mixed activated sludge process has been aimed at in this paper. then, the state equations of the aeration process have been proposed in this paper, which is on the base of dissolved oxygen concentration ( do ) and discharge quantity of sludge ( qw ) as control variables, the concentration of bod and sludge as state variables. based on the present study on optimization control of wastewater treatment, the multivariable optimal control model with restriction factor has been presented in the paper with introducing modern control theory and system analysis into the field of activated sludge wastewater treatment,
具體包括:以完全混合、表面曝氣合建式活性污泥工藝的污水處理曝氣過程為研究對象,在闡述了曝氣過程式控制制參數選取可行性的基礎上,建立了以溶解氧濃度do和活性污泥排放量qw為控制變量,以曝氣池中有機物濃度s和微生物濃度x為狀態變量的活性污泥曝氣過程的基本狀態方程;運用現代控制理論的觀點和污水處理理論,在現有關于污水處理最優控制問題研究的基礎上,建立了有約束條件多變量能耗最小數學模型,該數學模型是以有機物排放總量和狀態變量的末值條件作為約束條件,曝氣過程的能耗最小作為目標泛函;採用增廣拉格朗日乘子法對最優控制問題進行轉化,並對應用極大值原理求解能耗最小這一最優控制問題進行了詳細的解析;引入約束運算元,應用具有控制約束的共軛梯度演算法對能耗最小這一最優控制問題進行求解,並進行模擬實驗驗證。分享友人