泥沙石 的英文怎麼說

中文拼音 [shādàn]
泥沙石 英文
argillaceous sand stone
  • : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
  • : 沙動詞[方言] (搖動以清除雜物) shake
  • : 石量詞(容量單位, 十斗為一石) dan, a unit of dry measure for grain (= l00 sheng)
  • 沙石 : pallisandro classico
  1. Let's mix concrete, sand and stones.

    把水子和子摻合在一起。
  2. Given her creative mind, janices world is full of fascination and enthrallment. in her eyes, elements such as flowers and stone have their hidden and enigmatic charm

    在楊燕玲的世界里,不僅是一花一草,甚至土、,都隱藏著它們不同的個性。
  3. In drainage of agricultural lands, a filter or gravel envelope is used to prevent the entrance of fine sand and silt into the drains.

    在農田排水中常常採用礫或過濾層來防止粉細砂和進入排水溝。
  4. The fence and makeshift house sent the mudslide on a 90 - degree swerve, and the water, mud, sand, and everything else slid safely past his home

    大大小小的土流含著大量的雨水和,往房屋旁的道路一路滑落下去,真是有驚無險!
  5. For studying the regulation rules of the sediment of the second phase project, and studying the reservoir capacity loss caused by deposition, the amount of sediment passing through the turbines, and the deposition and flow regime near the intake of the pump - turbines, the deposition of the reservoir was studied

    為了研究蒲河抽水蓄能電站二期工程調度方案,對多個方案的水庫淤積損失、過機量、取水口附近的淤積和水流流態,進行了水庫沖淤研究。
  6. Firstly, we account for the former made and the sand selected are reasonable by experiments. then we develop the first project carrying the experiment for filling up of 30 years. contrasted with the count, the results have no difference, we carried two experiments under different water levers by the actually facts if engineering work in early days. by the result, we know that the gross of fill up have no difference

    本文從白水庫模型試驗入手,模型試驗首先通過模型糙率和模型選驗證試驗,說明模型製作和選是合理的;然後開展初設方案30年運用水庫淤積試驗,並與數模計算對比,基本相同;試驗結合工程初期運用實際情況,進行了兩個不同初期運用水位方案的對比試驗,從兩個方案試驗結果看,初期運用的兩個方案淤積總量差別不大,而從效益看,方案二優于方案一。
  7. Finished the following important consulting projects in recent years : ( 1 ) to take charge of and participate in the design of the project of 25 thousand - ton petrol and gas quays of the jiangyin petrol company. ( 2 ) to take charge of and parricipate in the design of the project of 25 thousand - ton petrol and gas quays of zhang jia gang hada company. ( 3 ) to organize the feasibility study on the coastal engineering test hall construction project of nhri. to take charge of and participate in the design of the hall ( a large - size wave basin, 70m long and 50m wide. was constructed in it ). ( 4 ) to organize the project feasibility study of the laboratory of nhri for the basic law research on sediment transport, to take charge of the design of the project, and to participate in the design of the wind and wave flume ( 180m long ), in which the scientific research projects of waterway training works and coastal engineering structures can be carried out under the combined action of wind, wave and current

    近幾年來主要完成以下幾項重大工程: 1 .主持並參與江陰油公司2 . 5萬噸級油氣碼頭的設計; 2 .主持並參與張家港哈德公司2 . 5萬噸級油氣碼頭的設計; 3 .編寫了南京水科院海岸工程試驗廳可行性研究報告,主持並參與該試驗廳的工程設計,在該試驗廳內建有70米長50米寬的大型波浪水池; 4 .編寫了南京水科院「運動基本規律研究實驗室」工程可行性研究報告,並主持該項工程設計,參與完成180米長風浪水槽設計,該水槽建成后,可在風、浪、流綜合作用下進行航道整治和海岸工程的科學研究。
  8. In order to make the pile driving easy, the smooth silt bottom or smooth mud bottom is the best, but the ooze bottom is certain

    以平坦的底和底最好,軟底也可以,這種底質打樁容易,但硬質底也可以,不能打樁可以下砣坐樁。
  9. Along the coast distribution from the accumulation of loose sand or gravel from the flat surface

    沿海岸分佈,由鬆散或礫堆積而成的平緩地面。
  10. Pressure decouple effect of eccentric decouple charge blasting is researched according to cement mortar model testing, meanwhile comparable testing of smooth blasting of eccentric and centric charge is researched on rock with sonic velocity evaluation in this paper

    摘要通過水漿模型試驗研究了偏心不耦合裝藥爆破的偏心效應,同時在塊體上通過巖聲速評價對比試驗,研究了藥柱偏心和同心的光面爆破。
  11. The cast basalt liner are inserted and embedded with a dense cement mortar inside the steel pipe. it can be used in higher working pressure and also easy to install and transportation. we can offer the straight pipes, bends and tees with nominal diameter of 40mm and above

    玄武巖鑄復合管事由內襯鑄管外套鋼管和兩者之間的水漿充填層構成,它集鑄管性能和鋼管性能於一身,既耐磨損耐腐蝕,又抗高壓,且安裝運輸方便。
  12. As some of the persons involved had migrated investigators had to make overseas trips to collect evidence. as the investigation progressed, the gravity of the case grew with it. the rate of cement to screed as set by the works bureau at the time was 1 : 5 to 1 : 7, however the 26 blocks were found to have a ratio as low as 1 : 19. 2

    調查工作暴露了建造工程出現的嚴重違規情況例如偷工減料建築屎成份嚴重偏離工務局要求英一比五至一比七的比例,只達一比八點三,甚至差至一比十九點二,完全妄顧樓宇安全。
  13. Among the 130 debris flow valleys, dazhai gully suspends high on the up range of baihetan hydropower station, with an altitude over 970 m and a drop more than 350 m. gravels, mud and flood in this valley brings the construction site in great danger. 3 kilometers upriver from the mouth of dazhai gully, lies the haizi gully, which is also frequented by debris flows, but will be taken as the dumping site for the construction

    庫區130條流溝中大寨溝以溝口海拔970餘米的高程和350餘米的落差高懸于白鶴灘水電站的大壩上方,其溝內流帶來的礫與洪水直接威脅著電站建設工地和樞紐的安全;緊鄰大寨溝溝口上游約3km的海子溝則為一條流活動頻繁的溝谷,因其出口將作為水電站建設的棄渣場地,流域內的流活動關系著水電站建設中棄渣場的安危。
  14. Mud, sand and stone granules carried by turning wheel unceasingly strike the chassis, then, a thin layer of phosphorized antirust priming paint below the chassis will be broken little by little and galvanized iron is forced to bare

    飛旋的車輪夾帶的粒不斷地沖擊著底盤,底盤下原本微薄的一層磷化防銹底漆就這樣被「仔」一點點地破壞掉,底盤被迫裸露出白鐵!
  15. Habitat at having the shallow sea sea floor of aquatic or silt, or below conceal stone

    棲息于有水草或的淺海海底,或潛伏下。
  16. Combined with movement character of debris under water, the stabilization and material translation over interface of two fluids is discussed. the critical conditions of interface stabilization are made

    結合流水下運動特點,討論水下流的交界面穩定問題和交界面上的交換,給出交界面失穩判別式。
  17. Of ores, minerals, earths and sands

    ,礦物,土和
  18. Open storage of goods ( excluding storage of containers ( subject to special condition no. 43 in the second schedule of the tenancy agreement ), cement, sand, aggregates and offensivedangerous goods ) ( in determining whether any goods stored on the premises amount to " non - offensive goods " the decision of the district lands officer shall be final and binding on the tenant ) or a weigh - bridge or a fee - paying public car - park for the parking of motor vehicles ( including container tractors and trailers ) licensed by the commissioner for transport for use on public streets and roads under the road traffic ordinance ( cap. 374 ) or all or any combination thereof

    條規限) 、水料及厭惡性貨物危險品) (在決定存放在該土地上的任何貨物是否屬于非厭惡性貨物時,地政專員的決定即為最終決定,且對承租人具約束力)或作秤車量重器或收費公眾停車場,供停泊獲運輸署署長根據《道路交通條例》 (第374章)發給牌照,可在公共街道及道路上使用的汽車(包括貨櫃車拖頭及拖架)或上述用途的全部或任何組合
  19. Hydro - stone consisted of a mixture of gravel, crushed stone, sand, and portland cement molded under pressure

    是波特蘭水(即普通水) ,碎土的混合物在壓力下形成的一種料。
  20. Screeds, bases and in situ floorings - concrete bases and cement sand levelling screeds to receive floorings - code of practice

    找平層底基和現場鋪築地板材料.承重地板材料用混凝土底基和水泥沙石找平層.實施規范
分享友人