泥流土條 的英文怎麼說

中文拼音 [liútiáo]
泥流土條 英文
solifluction stripe
  • : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : Ⅰ名詞1 (細長的樹枝) twig 2 (條子) slip; strip 3 (分項目的) item; article 4 (層次; 秩序; 條...
  • 泥流 : earthflow; mudspate; rollsteinfluten; mudflow; soilflow; soil fluction; sludging; solifluction
  1. Terraces on slope land delete the conditions of causing soil and water loss. ponds, cistens, water cellars enhance surface water use efficiency, warping dams can store flood, decrease flood peak, retain sediment, and conserve water

    坡地修梯田消除了產生水失的件,蓄水池、旱井、水窯提高了對地表水資源的利用率,淤地壩具有蓄洪水、削洪峰、攔沙、涵養水源的作用。
  2. He actually purchased the farm my father was raised on. there was a large gorge that ran through this farm. the river had changed course and taken all the dirt away and then when it changed course, it created a huge island and there were several acres of soil that could be planted and harvested, but there was this incredible crevasse which kept them from doing that

    伯伯在農場會做的一件事,事實上那農場是他向祖父買下來的,爸爸也在那兒長大祖父決定要把橫跨農場的一溝填平,河改道導致巨大河谷峽谷形成,裏面沒有,河水把都帶走了,它改道時形成了一個巨大島嶼,那裡有好幾
  3. And then the author established and verified an empirical equation for the ratio of the heights of collapsed part and running part for the avalanche soils, suggested the critical flow conditions of loose avalanche soils and block avalanche soils, discussed the causes of accelerated motion of consistent debris flows on mild slope, and studied the average velocity of intermittent debris flows

    給出了判別崩塌相對運動距離,即高比公式,並用現場實測資料進行了驗證。提出了鬆散崩塌和塊狀崩塌動化的判別件。探討了稠性在緩坡上加速運動的成因,並討論了陣性平均速公式。
  4. Article 34 in the case of earth - fetching, sand - digging or quarrying in areas in danger of land - collapsing or land - sliding or where mud - rock flow is liable to occur, as designated by the local people ' s government at or above the county level, the department of water administration under the people ' s government at or above the county level shall order the cessation of the above law - breaking acts and the adoption of remedial measures, and shall also impose a fine

    第三十四在縣級以上地方人民政府劃定的崩塌滑坡危險區、易發區范圍內取、挖砂或者採石的,由縣級以上地方人民政府水行政主管部門責令停止上述違法行為、採取補救措施,處以罰款。
  5. The hillslope erosion processes include soil separation, sediment transport and sediment precipitate, which these three process result from the rainfall splash erosion and runoff erosion. to study and analyze the happening and developing conditions of hydraulic, soil and terrain, and the mechanisms of transitions and influences of these processes each other is the prerequisite to set up physical model of soil erosion

    坡面侵蝕過程包括降雨濺擊和徑沖刷引起的壤分離、沙輸移和沉積3大過程,研究和分析這些過程發生、發展的水力、壤、地形件以及各過程間相互轉化、相互影響的機理,是建立壤侵蝕物理模型的前提件。
  6. Complicated hydrologic and geographic conditions, and the large scale of the xiaolangdi hydraulic project on the yellow river are introduced briefly. three desilting tunnels are designed to meet the requirements of flood control, sediment discharge and runoff regulation. according to the performance requirements of desilting tunnels, the tunnel lining down - stream of the grouting curtain is designed to be post - tensional prestressed lining. on the basis of investigation and research, experiements and analysis, the unbonded prestressing system is used. it is the largest unbonded prestressed tunnel lining project in the world, and the first one in china

    簡介黃河小浪底水利樞紐復雜的水文、地質件以及龐大的工程規模.該樞紐設計有3排沙洞,擔負著泄洪、排沙、調節徑和保證進水口不被沙淤堵的任務.根據排沙洞的水庫運用要求,灌漿帷幕下游排沙洞洞身段設計為混凝后張預應力隧洞.通過大量的調研、試驗、分析論證,在施工前確定該預應力方案選用無粘結預應力系統,成為目前世界上規模最大的無粘結預應力隧洞襯砌工程,在國內尚屬首例
  7. However, for the same river, the obvious regularity exists in critical starting condition and the physical and mechanical indexes : the critical starting condition of the muddy cohesive soil increases with the decrease of the shear strength and decreases with the increase of the moisture content ; the critical starting condition of silty clay is the minimum, and the relation of the clay, the shear strength and the moisture content is nonlinear ; and the critical starting condition of the cohesive soil increases with the increase of the shear strength and the moisture content

    而對同一而言,起動臨界件與物理力學指標之間則存在明顯的規律性:即對淤質粘,起動臨界件隨抗剪強度的減小而增大,隨含水量的增大而減小;粉質粘的起動臨界件最小,與抗剪強度、含水量呈非線性關系;粘起動臨界件則隨抗剪強度、含水量的增大而增大。
  8. Comparing the catchments with the same conditions at the same scales, we found that at the small scale catchments, the factor directly impacting the runoff variation and sediment variation was the relative distribution location at sloping fields, and at the median scale catchments, was the slope distribution of land use components, while at the large scale catchments, the distance distribution of land use components

    在相近件的同尺度集水區之間比較發現,小尺度集水區地利用類型的坡位分佈格局對徑沙變化有較直接的影響,中尺度集水區地利用類型的坡度分佈格局和大尺度集水區的地利用類型的距離分佈格局對徑地利用空間分佈格局對侵蝕產沙過程的影響的變化影響較大。
  9. A systematic study is conducted on engineering behaviors of residual soil, failure mechanism of residual soil slope and mechanism of natural flow slides triggered by rainstorm in jiang jia drainage area. to investigate engineering properties of disturbed soils, a series of tests, including grain - size analyses, permeability tests, direct shear tests and dynamic iriaxial lest is performed on specimens

    本文在總結熱帶坡殘積地區暴雨滑坡轉化成的研究現狀和進展的基礎上,對雲南東川市蔣家溝地區坡殘積的工程特性、暴雨件下斜坡體的破壞機理、暴雨滑坡轉化成的形成機理和形成過程進行了較為系統的研究。
分享友人