泥漿波 的英文怎麼說

中文拼音 [jiāng]
泥漿波 英文
mud arrival
  • : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
  • 漿 : 漿同「糨」
  • : Ⅰ名詞1 (波浪) wave 2 [物理學] (振動傳播的過程) wave 3 (意外變化) an unexpected turn of even...
  • 泥漿 : slurry; mud
  1. The pipe is complete enwrapped by cement after grouting, not loose and rupture when pulling wire

    外壁環狀紋,灌漿后可完全包裹在水中,拉線時不會松動或斷裂現象。
  2. The main contents of testing the strength of subgrade abamurus using earthquake wave velocity are as follows : the influence of the lithology and strength of flag stones and the shape of block upon wave velocity, the influence of the strength of cement mortar upon earthquake wave velocity, the estimation standards of the strength and completion of abamurus. this paper puts forward an accurate no - destructive testing using the different reflect of elastic wave velocity for abamurus stones, the strength of mortar, the plumpness of mortar and the type of abamurus, on the basis of laboratory tests and field tests. it can be used to accurately distinguish the completion of abamurus

    地震速法檢測路基擋墻強度,研究的主要內容有:片石巖性和強度及塊體形體對速的影響;水漿強度對墻體速的影響;擋墻整體強度和完整性的評估標準。應用彈性速度對擋土墻石材、砂漿強度、砂漿飽滿度及擋墻類型的不同反映,在室內外模型試驗和現場生產試驗的基礎上,提出了一種正確的無損檢測法,可以正確判別漿砂片石擋墻墻身的完整性。
  3. Monitoring sucking condition of mud pump with wavelet analysis of vibration signal

    用振動信號的小變換監測漿泵的吸入狀態
  4. Experimental techniques for simulating cavity decoupling explosion in laboratory wear developed, which include a center initiating explosive charge designed in shape of mini - spherical with yield equivalent to 0. 125 ~ 8. 00gtnt, circular electromagnetic particle velocity gages and aluminum bar strain gages measurement techniques, spherical divergent stress waves generator. large amount of tamped and cavity explosion experiments had been made in granite, soil, cement mortar and water media environment, respectively

    本文建立起了包括中心起爆的0 . 125 8 . 00gtnt微型球形炸藥裝置的研製、圓環形電磁粒子速度計及鋁桿應變計測試技術和球形發散應力實驗裝置等在內的實驗室微型藥量空腔解耦化爆模擬技術,並在花崗巖、土、水漿和水等介質中進行了大量的填實和空腔爆炸實驗研究。
  5. The holes of anchor bolts will be grouted with normal ( portland, non - shrinkage ) cement mortar

    這些地腳螺孔將灌入普通(特蘭,無收縮)水漿
  6. Specifications for installation of ceramic tile on a cured portland cement mortar setting bed with dry - set or latex portland cement mortar included in ansi a108. 1 - 1992

    用乾的或漬漿特蘭水漿在彎曲的特蘭水漿層上安裝瓷磚的規范
  7. Mud pulse mwd can not be used when too much gas or air in drilling fluid, and therefore electro - magnetic telemetry has speedily developed as an alternative

    鉆井液氣體較多時漿脈沖方法也難以應用,而電磁隨鉆遙測技術作為一種替代技術近年來發展很快。
  8. Specifications for installation of ceramic tile in the wet - set method, with portland cement mortar

    特蘭水漿用濕固定法安裝陶瓷磚的規范
  9. Furthermore, shearing and tension tests were performed on grouted cable assemblies in order to simulate the field situation. compared with direct shear tests on coaxial cable, the experimental data were analyzed and valuable conclusions were proposed on the coming application of tdr technology in slope monitoring

    為模擬實際工程情況,對澆築於水漿填充體中的同軸電纜tdr剪切與拉伸試驗特性進行了研究,總結了tdr形的變化規律,並將試驗數據與同軸電纜直剪試驗相比較,為tdr技術的實際工程應用提供了依據。
  10. Before placing them, she said, we should first wet the soil beneath until it is muddy, then fit the grass patches alongside each other as in a jigsaw puzzle, leaving little space between to encourage smooth growth. leaving too much or too little space would not be good for the grass development, and so we should follow the " middle way. " after that, we sprinkled some soil on top, and sprayed it with water to keep it wet

    師父教我們,草不必剪成四方小塊,反而要輕柔的將草分開成浪型,底下的土先用水弄成濕濕的漿,再把草像拼圖一樣拼在一起,草跟草之間要留些微的距離,這樣長出新草時才不會突起,也不可距離太遠,就是要持中庸之道,然後再灑些土在上面,澆一些水讓它潤濕,還要記得天天澆水才行。
分享友人