注水開發井網 的英文怎麼說

中文拼音 [zhùshuǐkāijǐngwǎng]
注水開發井網 英文
waterflood development pattern
  • : Ⅰ動詞1 (灌入) pour; irrigate 2 (集中) concentrate on; fix on; focus on 3 (用文字來解釋字句)...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞(頭發) hair
  • : Ⅰ名詞1 (從地面往下鑿成的能取水的深洞) well 2 (形狀像井的東西) sth in the shape of a well 3 (...
  • : Ⅰ名詞1 (捕魚捉鳥的器具) net 2 (像網的東西) thing which looks like a net 3 (像網一樣的組織或...
  1. Based on the development feature analysis, this paper studies thoroughly the reservoir flood feature and remaining oil distribution through the microstructure, sendimentary phase, reservoir heterogeneity and well control, and proposes the comprehensive adjustment based on the injection and development well net structure and improvement the result of the research is obvious with the production degression rate from 9. 14 % of 1997 to present - 1. 46 %, and water rate from original 0. 33 % to present 0. 16 %. in summary, the research idea, method and new achievement of the thesis provide a scientific geological basis for the oilfield development improvement

    在對本區歷程和采特徵分析的基礎上,從微構造、沉積微相、儲層非均質性、控制等方面深入地分析了油藏淹特徵及剩餘油分佈規律,提出了以完善、調整采結構為目的的綜合調整措施,已見到了明顯的效果:油田遞減由1997年的9 . 14降至目前的- 1 . 46 ,綜合含上升率由原來的0 . 33降至目前的0 . 16 。
  2. The study gets the following conclusions : 1 ) inverted nine - spot pattern water flooding is used in the early stage of the development, while linear water flooding is used in the later stage ; 2 ) well array is parallel to the fracture trend ; 3 ) the well arrangement of barycentric position method is a suitable pattern adjustment method in the later period of the development in low permeable oil fields

    研究認為,一是油田初期采方式採用反九點法面積後期調整為線狀方式;二是排方向與裂縫走向平行;三是「重心位置」布方式對低滲透油田後期是較為適合的調整方式。
  3. To solve some questions about oil production declining quickly, production and injection patterns are imperfect, the low degree of reserves control, and the injection water not enough in injection well, we have taken measures such as strengthen the geologic integrated research, drill extension well and adjustment well, strengthen water injection system, and optimize fracturing techniques, which has improved reservoir development effect

    為了解決產量遞減快、不完善、儲量控製程度低、等問題,採取加強地質綜合研究、鉆擴邊和調整、強化系統和優化壓裂工藝等措施,有效地改善了油藏效果。
  4. One of the crucial issues in reservoir engineering study is how to choose pattern well spacing in order to reach the highest recovery and optimal economic efficiency by waterfooding process for field development project designing and well pattern infill or adjustment

    摘要在油田方案設計和加密調整工作中,選用何種布方式或密度,使油田驅採收率獲得最高、油田經濟效益達到最優,這一直是油藏工程研究的主要問題之一。
  5. This article is mainly aim at tuo28 down reservoir of shengli oil field. through deeply analysis of geological character and its developing course. the important problems are found, first, flood pattern is not perfect, the reserivor is serious watered out in horizontal section, waterflood susceptibility is bad, the contradiction between oil and water in reservoir is serious, the interference between each producting formation is great, the crude oil is density, the reservoir have not enough energy, anisotropies is very serious. due to those facts, it is difficult to improve oil production by general technique

    本文通過對勝坨油田坨28下油組油藏地質特點及歷程的深入分析,找出目前存在的主要問題有:不完善,平面上淹嚴重,效果差,油矛盾突出,層間干擾嚴重,原油稠,油藏能量低,儲層非均質性強,致使常規彩油工藝難度大。
分享友人