泵輸入流量 的英文怎麼說

中文拼音 [bèngshūliúliáng]
泵輸入流量 英文
pump input flow
  • : 名詞(吸入和排出流體的機械) pump
  • : Ⅰ動詞1 (運輸; 運送) transport; convey 2 [書面語] (捐獻) contribute money; donate 3 (失敗) l...
  • : Ⅰ動詞1 (進來或進去) enter 2 (參加) join; be admitted into; become a member of 3 (合乎) conf...
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 量動1. (度量) measure 2. (估量) estimate; size up
  • 輸入 : 1 (從外部送到內部) import 2 [電學] input; entry; entering; in fan; fan in; 輸入變壓器 input tra...
  • 流量 : rate of flow; flow; runoff; discharge; throughput; (flow) rate; quantity (of flow); flux
  1. Thirdly, it simulated the pumping circuit & dividing circuit with the widely used software matlab / simulink. the displacement of the rod piston and the impact of hydraulic are analyzed in the different input flow ( frequency of pump ) and different reversing time. it found out the cause of hydraulic impact ( one - to - one incorrespondence between the response time of dividing circuit and the operation time of rod piston ), and gave some methods to weaken hydraulic impact. in the final part of the paper, the reliability of the theory analysis is further verified by the experiment of hydraulic system

    首先在變學原理的基礎上,深分析混凝土在送管道內的動狀態,得出混凝土的負載特性方程;然後根據功率鍵合圖的建模方法,建立送迴路和分配迴路的數學模型,並運用模擬軟體matlab simulink對送和分配迴路模型進行了模擬,分析了在不同的送頻率)和換向時間下,活塞桿的位移和系統的液壓沖擊情況,找到了引起液壓沖擊的根本原因(即分配迴路的響應時間(固定值)與活塞桿的運動時間(變化值)不相匹配) ,並提出了相應的改進方法。
  2. Pumps - rotodynamic pumps - circulation pumps having a rated power input not exceeding 200 w for heating installations and domestic hot water installations - noise test code vibro - acoustics for measuring structure and fluid - borne noise

    .旋轉動力.家用熱水置裝和供熱裝置用的額定功率不超過200w的循環.測結構和體導聲的噪音試驗編碼聲振搗
  3. This experiment include many contents, in a word, that is summer condition experiment, winter condition experiment > summer - winter transition condition experiment and winter - summer transition condition experiment, furthermore summer condition experiment still include flux changing experiment and winter condition experiment still include thermal balance experiment this article dealt with the data of the test, calculating out energy absorbing ( energy discharging ) of buried pipe in winter condition ( summer condition ), input power of heat pump x heat exchanging of piece buried pipe length x co - efficiency performance ? op ( energy efficiency rate ? er ) and average heat exchanging coefficient ; in additiont this article compares the inlet water temperature and outlet water temperature of underground the first layer and the second layer buried pipe when heat pump was running, the results are that the heat exchanging ability of the second layer buried pipe outgos the first layer buried pipe, and heat exchanging is more stable ; and still analyse earth temperature resuming in the transition season. the results are earth temperature resume fast in the first week when the heat pump runs off

    本文測試內容相當多,概括地說就是四個工況的測試,即夏季製冷工況的測試、冬季供熱工況的測試、夏?冬過渡季測試和冬?夏過渡季測試;另外在夏季工況的測試中還進行了變測試,在冬季工況的測試中還進行了熱平衡測試。本文對測試數據進行了處理,計算出了冬(夏)季工況埋管吸(放)熱、熱空調器供熱(製冷) 、熱空調器功率、埋管單位管長換熱、供熱性能系數(製冷能效比)和平均傳熱系數等;另外,還比較了熱運行時地下一二層埋管進出水溫度變化情形,得出地下二層埋管換熱能力優于地下一層埋管,且換熱很穩定;並分析了過渡季地下一二層埋管溫度恢復情形,得出熱系統停機一周內地溫恢復特別快。
  4. Scm as control core applied in the variable axial piston pump is introduced briefly in the paper, including structure and work principle

    摘要本文介紹了基於單片機控制的數字變軸向柱塞的結構組成、工作原理,並理論推導了數字脈沖信號呈線性關系。
分享友人