洞庭湖水系 的英文怎麼說

中文拼音 [dòngtíngshuǐ]
洞庭湖水系 英文
lake dongting
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  • : Ⅰ名詞1. (廳堂) hall 2. (正房前的院子) courtyard; front yard3. (指法庭) law court Ⅱ形容詞[書面語] (直) straight
  • : 名詞1 (被陸地圍著的大片積水) lake 2 (指湖州) short for huzhou3 (指湖南、湖北) a name referr...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 系動詞(打結; 扣) tie; fasten; do up; button up
  • 洞庭湖 : dongting hu
  • 水系 : river system; hydrographic net; drainage; basin
  1. Based on the field investigation of relationship between peasant family economy and flood disaster in dongting lake area, hunan province and the socioeconomic statistics from administrative departments and insurance companies, an analysis of family and land economy behavior shows that the fight of family against the flood is mainly constrained by its economic ability. on the one hand, land sustains the pressure from increasing family income, and on the other hand, it sustains the pressure from providing water with some space. therefore, under the condition of providing water with space to full, increasing the economic output rate of per capita land, then increasing the family economic income is of significance to solving the problem of peasant family economy and flood disaster

    通過對南省區家戶經濟與洪澇災害關展開的野外調查,和從行政門部與保險公司獲得的有關社會經濟統計資料.案例資料,進行了農戶經濟行為與土地經濟行為的分析.結果表明.家戶對洪澇災害的抵禦能力主要受其經濟能力的制約,土地一方面受到來自增加家戶收入的壓力,另一方面受到來自必須給以一定空間的壓力,所以在盡量滿足給以一定空間的基礎上,努力提高單位土地的產出率,從而提高家戶的經濟收入,對這一區的農民家經濟與洪澇災害問題的解決具有重要意義
  2. Due to issues of dongting lake districts flood composition, the evolution of sediment flow, the river and lake ( r & l ) distribution characteristic as well as the layout of r & l - dredging engineering, the article simulated the model of the dongting lake terrain change by using the gis technology and adopted the limited volumetric method to establish the two - dimensional hydraulics computation model of lake in order to forecast the water level, the flow capacity, the speed of flow and changes of flow field after implemented the project, which have provided the reliable theoretic basis for the decision - making and implementation of renovation for river course, canal and harbor and river course - dredging engineering

    摘要針對區的洪組成、流泥沙演變、河道分佈特點以及河道泊疏浚工程布局情況,利用gis技術模擬地形變化,採用有限體積法建立了泊二維力學計算模型預測疏浚工程實施后的位、流量、流速流場變化,為河道、航道港口整治、河道疏浚清淤等工程決策與實施提供了可靠理論依據。
分享友人