洞角 的英文怎麼說

中文拼音 [dòngjiǎo]
洞角 英文
cavity angle
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  • : 角Ⅰ名詞1 (牛、羊、 鹿等頭上長出的堅硬的東西) horn 2 (古時軍中吹的樂器) bugle; horn 3 (形狀像...
  1. Fist of all, on the basis of the research of agone boffins, this author investigates the interaction mechanism of bolts and rock, and introduces the elastic ? lastic analytical resolution which is consist of the liner structure, the equivalent reinforced wall rock and the original wall rock in the simple loading from the equivalent well - proportioned view ; this solution is very important meaning for the engineering design. on the basis of coulomb friction model, the author introduces the finite element equation of the contact problem in order to provide the academic foundation for the application of msc. marc. finally, combining the engineering practice of the non - linear analysis of shield tunnel through yellow river of the south - north water transfer and using the model of friction, the author researched the evolution law of stress and displacement field in the structure of grouted rock bolts, and analyzed the effect to the stress and deformation of surrounding rock mass due to anchor supports

    首先,在前人研究成果的基礎上,對錨桿與圍巖的相互作用機理進行研究,利用全長錨固錨桿的中性點理論,從等效均化的度來考慮錨桿對圍巖的加固作用,並推導了在簡單荷載作用下,含有襯砌、等效加固后的圍巖、原始圍巖三者的彈塑性解析解,對工程設計有著重要的參考意義;在數值模擬方面,以考慮錨固圍巖滿足規則化庫侖摩擦模型為基礎,利用虛功原理推導了接觸問題的有限元方程的計算格式,為開發運用大型商用有限元軟體msc . marc提供了理論根據,也形成了本文的理論基礎:最後,論文以南水北調東線穿黃隧穩定性分析項目為工程實例,利用本文所述的接觸問題的摩擦模型理論,對錨桿支護結構的應力場、位移場的變化規律進行了研究,分析了加錨支護對隧圍巖應力、變形的影響。
  2. Based on 2m contour of surveyed bathymetry from 1976 to 1999 and mean - high - tidal line distracted from remote sensing images acquired by landsat - 5 tm from 1976 to 2000 respectively, quantitative analysis about alluvion and erosion as well as the relationship between accretion of modern yellow river delta and the water and sediment discharge of yellow river is made, and the results indicate the mean - high - tidal level is more effective than 2m contour of the bathymetry. it is found that the accretion of modem yellow river delta is becoming less and less, what ' s more, erosion is even more than alluvion in some recent years. diaokou promontory has been eroded seriously since yellow river changed its course in1976

    以一般高潮線反映現代黃河三洲沖淤演變時,從1976年黃河改道清水溝流路入海到2000年,整個黃洲凈造陸201 . 5km ~ 2 ,淤積有逐漸變慢的趨勢,甚至出現凈蝕退的年份;刁口河嘴大量蝕退,蝕退速率開始快速,后來逐漸變慢;清水溝河嘴大量淤積,淤積速率開始迅速,后來逐漸變慢,甚至出現凈蝕退;清水溝河嘴南側到支脈溝一段岸線與刁口河嘴以西到灣灣溝一段岸線基本穩定。
  3. In the farthest corner of the cave was the wolf's lair.

    內遠處一個落是狼窩。
  4. The scenes depicted on the emunctory field, showing our ancient duns and raths and cromlechs and grianauns and seats of learning and maledictive stones, are as wonderfully beautiful and the pigments as delicate as when the sligo illuminators gave free rein to their artistic fantasy long long ago in the time of the barmecides. glendalough, the lovely lakes of killarney, the ruins of clonmacnois, cong abbey, glen inagh and the twelve pins, ireland s eye, the green hills of tallaght, croagh patrick, the brewery of messrs arthur guinness, son and company limited, lough neagh s banks, the vale of ovoca, isolde s tower, the mapas obelisk, sir patrick dun s hospital, cape clear, the glen of aherlow, lynch s castle, the scotch house, rathdown union workhouse at loughlinstown, tullamore jail, castleconnel rapids, kilballymacshonakill, the cross at monasterboice, jury s hotel, s. patrick s purgatory, the salmon leap, maynooth college refectory, curley s hole, the three birthplaces of the first duke of wellington, the rock of cashel, the bog of allen, the henry street warehouse, fingal s cave - all these moving scenes are still there for us today rendered more beautiful still by the waters of sorrow which have passed over them and by the rich incrustations of time

    二湖谷,基拉尼那些可愛的湖泊,克朗麥克諾伊斯487的廢墟,康大寺院,衣納格峽谷和十二山丘,愛爾蘭之眼488 ,塔拉特的綠色丘陵,克羅阿帕特里克山489 ,阿瑟吉尼斯父子股份有限公司的釀酒廠,拉夫尼格湖畔,奧沃卡峽谷490 ,伊索德塔,瑪帕斯方尖塔491 ,聖帕特里克鄧恩爵士醫院492 ,克利爾岬,阿赫爾羅峽谷493 ,林奇城堡,蘇格蘭屋,拉夫林斯頓的拉思唐聯合貧民習藝所494 ,圖拉莫爾監獄,卡斯爾克尼爾瀑布, 495市鎮樹林約翰之子教堂496 ,莫納斯特爾勃衣斯的十字架,朱里飯店,聖帕特里克的煉獄, 497鮭魚飛躍,梅努斯學院飯廳,柯利穴, 498第一任威靈頓公爵的三個誕生地,卡舍爾巖石, 499艾倫沼澤,亨利街批發莊,芬戈爾500所有這一切動人的501情景今天依然為我們而存在。
  5. For regarding believe - on - me they said it was nought else but notion and they could conceive no thought of it for, first, two - in - the - bush whither she ticed them was the very goodliest grot and in it were four pillows on which were four tickets with these words printed on them, pickaback and topsyturvy and shameface and cheek by jowl and, second, for that foul plague allpox and the monsters they cared not for them, for preservative had given them a stout shield of oxengut and, third, that they might take no hurt neither from offspring that was that wicked devil by virtue of this same shield which was named killchild

    首先,伊誘彼等前去之「雙鳥在林」 ,乃天下第一,內設置四枕,附四標簽,印有「騎」 , 「顛倒」 「赦顏」 「狎昵」字樣。其次, 「預防法」給彼等以牛腸製成之堅固盾牌,對惡疫「全身梅毒」及其他妖怪,亦無須懼怕。第三,憑借稱作「殺嬰」之盾牌,惡鬼「子孫」亦無從加害於彼等。
  6. It is not efficient to solve the problem of lack of honest and credit in china only with the inane moral sermon. the only solution is to redesign the comparison between the costs of keeping faith and breaking faith or the comparison between the gains from keeping faith and breaking faith with certain institutional arrangements to make them keep faith on their own initiatives

    所以要解決目前中國的誠信缺失問題,不能僅僅通過空的道德說教來引導人們誠實守信,而只能尊重客觀實際,從市場經濟的特點出發,通過一定的制度安排來重新設計人們守信與否的成本對比或者收益對比,使他們從自身利益的度出發,主動守信。
  7. An offshoot of the yandang mountain

    景區是雁蕩山斜逸旁出的一個支脈。
  8. The signature hole is the 15th redan which is played across a hummocky valley to an angled plateau green

    簽名是第15「凸堡」 。擊球穿越一個多丘山谷至一個成度的高原果嶺。
  9. The penstock for jinhe hydropower station is less in china, as it has a obliquity of 50 on the bending and inclined straight section in space ; for which the manufacture and installation are smoothly completed under the construction condition in the tunnel and the environment of alpine region with available construction method in combination of limited construction method for the key technical problems of the manufacture and installation of the penstock, which provides a reference for the constructions under the similar circumstance

    摘要金河水電站壓力鋼管的空間轉彎和斜直段的50傾在國內是比較少見的,針對鋼管製造、安裝的技術難點,在高寒和復雜的內施工環境中,結合有限的施工手段,採取有效可行的施工方法,順利完成了製造、安裝任務,對類似環境下的施工提供了一定的借鑒。
  10. Based on this milti - hierarchical model, application method for information organization of part is presented. chapter 3 proposes a new rule of arbitrary maximum angles of chord for triangulation and locale optimum, which avoides calculating angles of conventional methods in mesh simplification. moreover, with the introduction of arithmetical average windage concept, optimum method for the boundary mesh retriangulations is presented

    第三章針對曲面網格簡化操作過程中出現的空剖分問題,討論層次模型的網格優化方法,提出了基於弦內最大準則的局部網格簡化方法;針對網格曲面上存在的曲折邊界缺陷,提出以邊界輪廓算術平均偏差作為邊界曲折程度評定參數的邊界平滑優化剖分方法。
  11. Hole repairing in triangular mesh models and piecewise smooth b - spline surfaces fitting have been studied in this dissertation

    本文對三網格模型上的孔修補及分片光滑b樣條曲面的擬合技術進行了研究。
  12. Indeed, he obtained an oblique back view of the scenery and of the wings which had been strengthened, as it were, by a thick layer of old posters. then he caught sight of a corner of the stage, of the etna cave hollowed out in a silver mine and of vulcan s forge in the background

    他看見的是布景的背面和側面,布景架的後面糊著厚厚一層舊海報,在舞臺的一個落裡,埃特納火山的一個巖陷入在一座銀礦里,舞臺的最後邊有火神的煉鐵爐。
  13. Double liyang design with an international perspective to the high degree of enhancement of corporate image, we stand on the position of the customer perspective, insight into market opportunities, and strive to design and commercial art design the perfect combination of playing professional skills necessary to design achievements in information dissemination enterprise brand the carrier, in the market for customers in winning

    雙力揚設計要以國際視野的高度來提升企業形象,我們站在客戶的立場與度出發,察市場先機,力求商業設計與藝術設計完美的結合,發揮專業技能,使設計成就傳播企業品牌信息的載體,讓客戶在市場中制勝
  14. This paper analyses the stress and deformation of the two lining structure types of the surge shaft surrounded with crush rock under the action of high water pressure by using fem, compares the two lining types ' s merits and demerits in stress, deformation, fracture state, the combining bearing of surrounding rock and lining structure, the safety and economics

    本文針對圍巖條件比較破碎,裂隙發育的調壓井室結構,就兩種襯砌結構型式分別進行了高水頭作用下的有限元數值模擬,從調壓井襯砌結構選型度分析對比了兩種襯砌結構型式在圍巖及襯砌結構應力與變形、襯砌結構鋼筋混凝土開裂、圍巖與襯砌結構聯合承載、結構安全儲備、經濟等方面的優劣。
  15. All of the hydraulic structures are arranged in the right bank and four underground seepage tunnels are arranged parallel in horizon, and the axle wires intersect with syncline axis almost perpendicularity, and with rock formation obtusely. complex underground tunnels are formed under such formidable conditions, and each of seepage tunnels crosses nuclear of syncline and comes up against interlaminar sharing disturbed belt at different footage

    四條引水發電隧在平面上平行布置,軸線方向與本區構造線方向近於垂直,與巖層走向大度相交,構成一復雜地下室群,並在不同段通過沙金壩向斜核部,且遭遇多條層間剪切錯動帶。
  16. The hydrothermal breccia and karst in the beiya area are divided into 4 types and zones, including : sedimentary tuff and breccia induced by hydrothermal explosion and sedimentation on land surface ; hydrothermal sedimentary conglomerate and gas - explosive ejecting breccia related to sedimentation in and collapsing of some shallow karst caves ; netted hydotherma1 limcstone breccia and hydrothermal explosive breccia pipe related to hydrofracturing, corrosion and explosion in the hydrothermal channels ; and yellow granular limestone formed by simmering and alteration in the deep heated water reservoir

    北衙地區熱水礫巖和熱水巖溶可分為4種類型和層次,即地表相爆發沉積作用形成的沉積凝灰礫巖、熱水沉積鮞狀灰巖與鈣華膠結礫巖;與近地表穴沉積和垮塌作用有關的熱水沉積礫巖和汽爆射流礫巖;與熱水通道相蝕裂和爆破礫化作用有關的網路狀灰巖礫巖筒和熱水隱爆礫巖筒;深部相熱水浸煮蝕變灰巖。
  17. Obtain these chief research achievements. ( 1 ) the method of hydraulic fracturing, kaiser effect experiment and the finite element numerical simulation computation results, the direction of maximum horizontal principal stress intersect the small - angle of tunnel axial line, it is favorable to the stability of tunnel peripheral rock ; according to the test rust of field stress - relief method, at the present time, zhe gu mount tunnel have n ' t access to high crustal stress site, maximum principal stress magnitude is 17mpa ~ 20mpa

    主要獲得以下研究成果: ( 1 )綜合水壓致裂法、室內巖石kaiser效應試驗和有限元數值模擬計算研究成果,最大水平主應力方向與隧道軸線小度相交,對隧道圍巖穩定性有利;根據現場應力解除法測試結果,目前鷓鴣山隧道尚未進入高地應力段,最大主應力量級為17mpa 20mpa 。
  18. With the increase of lateral pressure modulus, the magnitude of principal stress decreases and the direction of it is hardly changeable ; with the increase of the angle between the direction of the maximal horizontal principal stress on magnitude and the fault bearing, the magnitude of principal stress increase and its direction can hardly change ; with the increase of the elastic modulus of rocks, the magnitude of principal stress increases and the direction changes more ; with the increase of pr, the magnitude of principal stress decreases and the direction changes more ; with the increase of lateral pressure modulus, the principal stress at hance, the tress at topmost arch, bottom arch and principal stress at lateral arch decreases, with the increase of the depth of tunnel, the stress of surrounding rock also increases, and the poorer the quality of surrounding rock is, the little its principle stress is

    分析得出,隨著側壓力系數的增大,主應力量值減小,主應力方位難改變;隨著與斷層走向的夾增大,主應力量值增大,應力方向難改變:隨著巖石的彈性模量的增大,主應力量值增大,方向變化越大;隨著泊松比的增大,主應力量值減小,方位變化越大。隨著側壓力系數的增大,頂、底拱處的各應力值增大,拱腰處的主應力減小,剪應力增大,側拱處的各主應力減小,同一側壓力系數的條件下圍巖質量越差,各應力值也越小;隨著室埋深的增加,圍巖壓力也增大,圍巖質量越差,其應力值也減小。
  19. That morning, finding that i was to be involved in the horrid disappointment he had prepared for the mutineers, he had run all the way to the cave, and, leaving the squire to i guard the captain, had taken gray and the maroon, and started, making the diagonal across the island, to be at hand beside the pine

    今天下午,他發現原來本打算讓反叛者們空歡喜一場,沒料到把我也卷了進去。於是他急忙跑回穴,留下鄉紳照料船長,自己帶領葛雷和放荒灘的水手,按對線斜穿全島直奔大松樹那邊。
  20. I pumped the contents of a large file, db2esev8. 2. tar, to dev null a virtual device that acts like a black hole, essentially discarding all writes

    我將一個大文件db2esev8 . 2 . tar中的內容提取到/ dev / null (充當類似黑洞角色的虛設備,實質上是要摒棄所有的寫操作) 。
分享友人