洪口 的英文怎麼說

中文拼音 [hóngkǒu]
洪口 英文
hongkou
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : Ⅰ名詞1 (人或動物進飲食的器官; 嘴) mouth 2 (容器通外面的地方) mouth; rim 3 (出入通過的地方) ...
  1. Splays are commonly formed by currents from crevasses in levees.

    嗽叭形堆積通常由堤防決流所形成。
  2. Abstract : this paper analyzes causal factors of flood in the middle reaches of changjiang river. due to neglection of environmental management, soil erosion in the upper and middle reaches of the changjiag river, lake sedimentation, large - scale reclamation of marshes, the flood regulation capacity of the lake was descended, and flood stage was risen and prolonged. consequently more and more river levees and lake dikes were reinforced almost every year to prevent the disasters, which made flood level go up and flood period last for more days. the frequency of flood and waterlogging disasters rose and their damage was enlarged. several proposals for flood prevention including agricultural modernization are put forward

    文摘: 1998年長江大水后開始實施的「平垸行,退田還湖」的土地利用調整方案,從長遠來說應尋求農業安全且收入逐漸提高條件下的土地利用,長江中游地區應積極推進農業現代化,提高農業勞動生產率,轉移,減少分蓄區的人,移民建鎮,對區內的土地要促進其規模經營,由優秀的有文化的農民經營,平時只有少量的直接從事農業生產的經營管理人員,農忙時則大量地使用季節性合同工或實現機械化,大水時退田還湖,減輕長江幹流大水的壓力,減少分與特大災時的損失,這樣還可促進避、冬季農業等的發展,也有利於長江中上游地區陡坡耕地的退耕還林,還可在糧食充足時進行休耕,在旱災、糧食緊張時擴大糧食生產?
  3. This plan was well designed in accordance with the geographic features of suzhou new district. this area receives the flood of the upper reaches from the grand canal, pased by the flood from the western hills and accepted the local rainstorm run off at the same time. 3

    3 . 《蘇州市長江防工程規劃》蘇州境內的長江位於長江河段,同時受到峰、高潮和臺風的影響,尤以三者同時遭遇,危害最大。
  4. Humboldt held the money against me.

    堡以錢為借攻擊我。
  5. Narrated by sister initiate jui - lien hung, toronto, canada

    加拿大多倫多菊蓮師姊
  6. Then, noah sent a dove, and the dove was back with an olive branch

    諾亞又放出鴿子,鴿子銜一枝橄欖葉子飛回,於是諾亞得知地上水已退。
  7. Such low reliability proves that the seepage burst disaster of this dike during the flood season is inevitable under the 1998 pluvial condition

    論證了該堤壩在1998年汛期的水條件下被沖潰的必然性。
  8. As a practical application, the safety situation of jiujiang dike under the 1998 pluvial condition of once a hundred years in yangtze river has been evaluated by the reliability method from the point view of the seepage stability in terms of probability analysis and two dimensional saturated seepage finite element analysis combining with the mechanism of seepage burst in jiujiang dike summarized in the thesis

    通過滲流有限元和滲流可靠性分析論證了1998長江流域特大水災害中九江市防護大堤發生的嚴重潰破壞的滲流破壞機理。分析、比較得出結論:堤防下游坡腳的出逸比降接近和超過臨界比降,在1998年長江百年一遇的水條件下九江大堤潰斷面的抗滲可靠性僅在55左右的非常低水平。
  9. Abstract : the qiantang estuary with violent hydrodynamic conditions is well known for its tidal bore. the regulation of the estuary in the past, especially the progress since the founding of new china are reviewed. the principles of the regulation and planning of the qiantang estuary formulated in 1960s are expounded, i. e., to narrow the river to reduce the tidal prism, and to increase the ratio of the river flow to tidal discharge. the experience of estuary regulation / reclamation is summarized, especially the engineering measures to protect the groin head and to use polder dykes as sea defense works. finally, the effect is analyzed of the large - scale constraction / reclamation in the estuary on the tides, flooding high water level, estuary bed and the northern deep waterway in the hangzhou bay

    文摘:以涌潮聞名的錢塘江河,動力強勁,破壞力極大.回顧錢塘江河歷代治理情況,重點記述1949年以來治理工作的進展,論述60年代提出的錢塘江河治理規劃的指導思想,即縮窄江道,減少進潮量,增大山潮水比值的整治原則.總結整治規劃實施過程中治江圍塗經驗,特別是「以圍代壩」和丁壩壩頭保護等工程措施.分析錢塘江河大規模治江圍塗后對錢塘江河潮汐、水位、河床以及杭州灣北岸深槽的影響
  10. Purple soil classified as regosols in fao soil taxonomy and pup - cambols in china soil taxonomy, is one of well known soil types with the particularities such as weathering easily, high natural fertility, etc., and feeding population of 500 / km2. however, it often meets the water disasters ( sporadic flooding and serious seasonal drought )

    摘要紫色土是世界上一種特殊的土類,集中分佈於四川盆地,以其易成土性和富鹽基性(自然肥力高)養育著500人以上平方公里的人而著稱於世,但是它分佈的區域存在嚴重的季節性乾旱和時有發生的災等水問題。
  11. The optimization of laying out these structures, paths of flow jets and a water cushion pool for a high arch dam is first discussed systematically in this paper

    本文首次系統地對高拱壩壩身泄、泄流過程以及壩下水墊塘的布置優化問題進行了討論。主要內容和成果有1
  12. By the scale of 1 : 35 flood - relief model test, combined the structures built and the pump entrance will be built of baishan dam, to decide the overall arrangement of the water cushion

    通過1 : 35比尺的整體泄模型試驗,結合白山已建的建築物及籌建的白山大泵進水,選定水墊塘的總體布置方案。
  13. Then, a thunderous sound came from the rear of the house. the kitchen on the back slope had collapsed under the sudden onslaught of a torrential flow of muddy water, and had fallen on the last row of concrete houses on the slope. rocks of all sizes, washed down by the muddy water, smashed through the windows into the rooms and then rushed through the doors into the living room and out into the courtyard at lower levels

    謝師兄在打坐中依稀聽到爸爸走進客廳的聲音,突然一聲山崩地裂的巨響從屋后傳來,後山腰的廚房被突如其來的土石流沖擊倒塌,壓到斜坡上最後一排的鋼筋房子,土石流沖破兩三間房間的窗戶玻璃,大小石塊挾雜在水中,從窗沖進房間,又從房門竄流出來,直奔地勢較低的客廳和庭院,家頓時變成土石流的出水
  14. The ancient project consists of three major projects, namely the yuzui water - dividing dike, the feishayan spillway and the baopingkou water inlet as well as some sub - project baizhang dike, shunshui dike at erwang temple and renzi dike

    渠首工程由魚嘴分水堤、飛沙堰溢道、寶瓶引水三大主體工程和百丈堤,二王廟順水堤、人字堤等主要附屬工程組成。
  15. So according to the technology regulation of reclamation engineering, hydraulic calculation must be carried out in the design of final closure. this paper firstly introduces the progression and present situation of reclamation engineering, emphasizing on the features of present reclamation and on the experiences and theories of home and abroad ; using fortran perfects the hydraulic calculation program of the closure and makes the program to meet different conditions ( such as considering flood, the variation of time interval, multi - entrance, multi - reservoir capacity ), and after comparing and analyzing a great deal of schemes, the reasonable computation scheme was brought up ; the interface of the program was carried out by the programming language vb to make the process of calculation become easier and more distinct, so the result can be analyzed and handled more directly ; vb is used in the later management of the result to plot the graphic chart of the isoline of the maximum of hydraulic element ( the velocity of flow, the drop height and the rate of flow ) automatically ; finally it was applied in the reclamation project of dongbidao of fuqing

    本文首先介紹圍海工程的發展進程與國內外圍海的開發現狀,重點介紹了我國目前圍海工程的特點及在圍海工程實踐中積累的經驗和理論;利用fortran語言完善堵工程龍水力計算程序,使程序可以滿足圍海工程復雜工況下(如考慮內港水、計算時段的變化、多門、多庫容、多水閘)的龍水力計算,並進行大量方案的比較和分析,提出合理計算方案;利用面向對象的可視化編程語言vb進行界面開發,使計算過程有良好的人機界面,更直觀地對計算結果進行分析和處理;計算結果的后處理採用vb編程實現龍水力要素最大值等值線圖的繪制;並運用所編軟體對福建省福清市東壁島圍墾工程進行龍水力計算,為堵合龍提供科學依據。
  16. Fairly utilizing the flood resources of the yellow river can achieve the objectives of " no dyke breaches, no depletion, no pollution exceeding the standards and no rising of the river bed " and keep the healthy life of the river

    利用好黃河的水資源,可實現「堤防不決,河道不斷流,污染不超標,河床不抬高」的目標,從而維持黃河的健康生命。
  17. Spatial elastoplastic analysis of reinforcing outlets in flood release dam section of tgp

    三峽泄壩段孔配筋方案空間彈塑性分析
  18. According to all the sediment peaks of 35 floods observed at each station on the downstream of xiaolangdi, it analyzes the characteristic of delayed sediment peak and establishes a regression equation between sediment peak lag time for each section of xiaolangdi, huayuankou, jiahetan, gaocun, sunkou, aishan and lijin and peak discharge, sediment concentration of the peak, flood propagation velocity and fall velocity of suspended load of the previous station, which can search, make up and extend sediment peak lag time and provide a basis for accurate forecasting on sediment peak travel time of each station on the lower yellow river

    根據小浪底下游各站沙峰均滯後於峰的35場水,對沙峰滯後於峰的特性進行了剖析,建立了小浪底、花園、夾河灘、高村、孫、艾山、利津各河段沙峰滯后時間與上站峰流量、沙峰含沙量、水傳播速度、懸移質泥沙群體沉速之間的回歸方程,可以用來查補延長沙峰滯后時間,為下游各站沙峰傳播時間的準確預報提供依據。
  19. As a result, a portion of the dirty water is eventually released into rivers or the sea via storm water spillways or pumping stations

    然而,這種方式在暴雨時會導致一部分被稀釋的污水經過泄洪口或抽水站,注入到河流或海洋。
  20. By applying " none homogeneous multi - laminate element ", hong - kou rcc gravity dam ' s simulation computing of temperature field and stress field at construction period and operation period for all courses and many factors. e. some kinds of methods are discussed in detail for temperature field back analysis, and artificial neural network method for back analysis of thermal parameters of concrete is suggested

    應用「非均質層合單元法」實現了洪口碾壓混凝土重力壩施工期、運行期全過程多因素的溫度場及徐變應力場的模擬計算,進行多方案的比較分析,推薦出優選溫控防裂方案,取得了非常滿意的成果。
分享友人