洪水建築物 的英文怎麼說

中文拼音 [hóngshuǐjiàn]
洪水建築物 英文
flood discharge structure
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ動詞1 (建築) build; construct; erect 2 (建立; 設立; 成立) establish; set up; found 3 (提出;...
  • : 築名詞(貴陽的別稱) another name for guiyang
  • : 名詞1 (東西) thing; matter; object 2 (指自己以外的人或與己相對的環境) other people; the outsi...
  • 洪水 : waterflood; deluge; flood; flowage; torrent; spate; flood water; [義大利] acqua alta洪水泛濫 floo...
  1. By the scale of 1 : 35 flood - relief model test, combined the structures built and the pump entrance will be built of baishan dam, to decide the overall arrangement of the water cushion

    通過1 : 35比尺的整體泄模型試驗,結合白山已及籌的白山大泵進口,選定墊塘的總體布置方案。
  2. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了施工導流的等級、工布置。通過力學計算、結構設計、導流方案投資比較、進度分析和投資風險分析,說明了四湖溝利樞紐工程採用圍堰擋汛后時段導流方案的合理性和經濟性,為施工決策提供理論依據。
  3. Flood protection products - specification - building apertures

    用品.規范.
  4. Design of flood - releasing energy dissipator and sediment - flushing structure for dachaoshan hydropower station

    大朝山電站泄消能及排沙設計
  5. By analyzing risk sources and those uncertain factors affecting the risk, the diversion risk is defined as the probability of the maximum discharge after being adjusted and held higher than the maximum design flood

    通過對導流風險來源和引起導流風險的各種不確定性因素的論述和分析,把施工導流風險定義為天然來(經過調蓄后,導流泄的最大泄流量超過其設計最大泄能力的概率。
  6. In addition, water control projects such as gates, pumps, polders and dikes spread all over the basin. all these bring more difficulties to scheme making for flood broadcasting and prevention as well as disaster reduction

    再加上流域內工控制(閘,泵,圩,堤等)星羅棋布,給流域內預報和防汛減災方案的編制帶來了一定的難度。
  7. The horizontal swirling flow internal dissipater tunnel being built in gongboxia power station will be the first one reconstructed from a diversion tunnel whose discharge reaches to 1000m vs and water head is more than 100m in china. its scheme ' s argumentation, test research and future apply will have important meanings to the design. research and engineering application of internal dissipation discharge tunnel with swirling flow, will powerfully promote engineering application of this new kind of dissipation mode, which may solve some high velocity problems in high dam construction and provide a engineering example for technological and economical augmentation in a diversion tunnel reconstruction. it is of theoretical and practical importance to promote hydraulic structure researches and development

    公伯峽電站右岸旋流內消能泄洞是國內第一個泄量達1000m s 、頭超過100m ,即將修的旋流式內消能泄洞,其方案的論證與試驗研究以及成后投入使用,將在國內外旋流式內消能泄洞設計、研究與工程應用中具有重要的意義,將有力的推動這一新的消能形式在工程中的應用,從而為解決高壩設中泄的高速流問題與導流洞改的技術與經濟問題提供工程實例,對推動與發展力學的研究與發展均具有重要的理論與實踐意義。
  8. As a kind of important hydraulic structure, hydraulic tunnel is very useful at many aspects such as conveyance, diversion and flood discharge

    工隧洞作為一種重要的,在輸、導流及泄等方面起著重要的作用。
  9. There are many main buildings in the plant such as concrete - faced rockfill darn, the second darn with clay core, spillway, diversion tunnel, surge tank, ground workshop and switch mom etc

    電站的主要有砼面板堆石壩、粘土心墻二壩、溢道、引隧洞、調壓井、地面廠房和開關站等。
  10. The system possesses the real time correcting function, which can avoid error accumulation and highly increase the forecasting accuracy ; ( 3 ) the flood control system can be multiple - scheme designed, that is, the control schemes can be designed in terms of different control ways for hydro - projects. simulated computation can be carried out to obtain multiple schemes that can be used by the leaders for decision making after risk and consequences estimation, so as to scientifically enhance th

    系統具有實時校正功能,可以避免誤差累積,極大地提高了預報精度; ( 3 )防調度系統可以進行多方案設計,即可以根據不同的調度方式來設計調度方案,並進行模擬調度計算,最終生成多個方案,供領導決策,提高了防決策的科學性; ( 4 )系統採用的數據均立在實時雨情、情、工情和天氣預報等數據庫基礎上,預報、調度均能做到快速及時。
  11. An emphasized study on what mentioned above for the water system of the urban center of guilin city and the relevant planning of flood control is described herein

    文中重點研究了桂林市中心城系中環境容量、體的連接與流動、系之間的連接以及城市系的防規劃等內容。
  12. Ice dam, ice cover and ice jam, which are farmed by stack, jammed and collective ice, can increase river resistance and water stage, resulting in flood, construction damage and navigation problems

    冰塊堆積,堵塞和聚集形成的冰壩、冰蓋和冰塞會導致河道阻力增加,致使上游位上漲,並可能造成冰期破壞,航運不暢等危害。
  13. The project mainly solved the problems from the flood control, the morphological diversity of river profile and cross section, and the diversity of habitats in the river through the layout of shoreline and structures, the design of river profile and cross section, the design of riverbank protection, which is one effective engineering practice of eco - hydraulic engineering

    治理工程在岸線布置、沿河(構)布置、河流縱橫斷面設計、岸坡防護設計等方面解決了防安全、河流縱向形態多樣性、斷面形態多樣性以及河流內棲息地多樣性等問題,是生態工學理念的一次有效工程實踐。
  14. The overall plan for xiaolangdi project management zone is carried out to ensure the safe operation of hydraulic constructions in the zone, to make full use the advantages of location and resources of the area, and to realize the general objective of “ mainly aim at flood prevention including ice flood prevention and sedimentation reduction, and give consideration to water supply, irrigation, power generation, storage of clear water and discharge of sediment flow, alleviating disaster and bringing about benefit, and comprehensive utilization ", for the project development

    為確保小浪底利樞紐工程管理區內的安全運行,充分發掘管理區的區位優勢和資源優勢,實現「防(包括防凌) 、減淤為主,兼顧供、灌溉、發電、蓄清排渾、除害興利、綜合利用」的工程開發總目標,對工程管理區進行了總體規劃。
  15. The remote sensing imagery change detection can be categorized into three classes according to the aims of the processing : the change detection of the specific targets, such as changes of the airports, the bridges, the harbors, the missile bases etc. ; the change detection of the linear shape targets, such as changes of the roads, the airports, the buildings and the other linear targets whose outlines can be described by some lines ; the change detection of large area targets, such as the changes of the cover of some region, the development of the cities, the disaster evaluation of the floods and so on

    遙感圖像變化檢測方法(簡稱變化檢測)根據處理目標要求可以分為三類:特定類目標的變化檢測,如機場、橋梁、港口、導彈基地等目標的變化檢測;線性體目標的變化檢測,如道路、機場、橋梁和一般等目標的變化檢測;大面積目標的變化檢測,如某地域的植被變化、城市的發展、災害評估等。本文系統地研究了基於模式識別知識檢測特定類目標、線性體目標和大面積目標變化的變化檢測方法。
  16. Project of project of accept insurance construction is building a course in, cause all losses because of natural disaster or contingency ( the except liability that in including clauses, sets ) include : 1, the natural disaster such as the flood, rainstorm ; 2, object of fire, explosion, flight falls wait for contingency ; 3, clear the charge of stricken be hit by a natural adversity spot

    承保工程項目在造過程中,因自然災難或意外事故而引起一切損失(不包括保險條款中規定的除外責任)包括: 1 、、暴風雨等自然災難; 2 、火災、爆炸、飛行體墜落等意外事故; 3 、清理受災現場的費用。
分享友人