洪泛 的英文怎麼說

中文拼音 [hóngfàn]
洪泛 英文
waterflooding
  • : i 形容詞(大) big; vast; grand Ⅱ名詞1. (洪水) flood 2. (姓氏) a surname
  • : Ⅰ動詞1 [書面語] (漂浮) float; drift 2 (透出; 冒出) be suffused with 3 (淹沒) inundate; floo...
  1. Civilization flourished first on fertile flooded plains.

    人類文明首先繁榮于肥沃的洪泛平原。
  2. Flood plain management institutions and their development in the united states

    美國洪泛區管理機構及洪泛區管理沿革
  3. A study of the flooding surface in the high - resolution stratigraphic sequence of continental deposit

    陸相高解析度層序地層中洪泛面特徵研究
  4. Floodwater pumping scheme

    洪泛抽水系統
  5. The parana floodplain marsh retains a large amount of nutrients being stored mainly in the sediment compartment

    巴拉那洪泛區濕地保存著大量的營養物,主要儲存在沉澱物質里。
  6. This result lays a solid foundation for the research. 2. based on the study of petrology facies, facies association and sedimentary sequences, the sedimentary processes and systems are established. they consist of debris and hyper concentration flow deposits, channel deposit of braided and meandering streams, and alluvial fans, floodplains, fan - deltas and lacustrine turbidities

    根據巖相、相組合以及沉積層序的研究,確立了研究區的沉積作用類型和沉積體系,它們包括碎屑流和超濃縮流沉積、辮狀河河道沉積,以及沖積扇沉積、洪泛平原沉積、扇三角洲沉積和湖相濁流沉積。
  7. Integrated concept of land - use for the flooding area of the h rdter rheinaue, germany

    勒瑙洪泛區土地利用綜合設想
  8. Flood - plain wetland ecoenvironmental functions and its management countermeasures

    洪泛區濕地生態環境功能及管理對策
  9. Flood control planning should include the protected objects, aims and tasks of flood control, flood control measures and act ion plans, delimit the flooded area, the flood storage and detention area and the flood control protected area, and determine the principle for use of the flood storage and detention area

    規劃應當確定防護對象、治理目標和任務、防措施和實施方案,劃定洪泛區、蓄滯區和防保護區的范圍,規定蓄滯區的使用原則。
  10. The state council and relevant people ' s government s of provinces, autonomous regions and municipalities directly under the central government may formulate measures for control of safety and construction within flooded areas and flood storage and detention areas and measures for giving support, compensations and aids to flood storage and detention areas

    國務院和有關的省、自治區、直轄市人民政府可以制定洪泛區、蓄滯區安全建設管理辦法以及對蓄滯區的扶持和補償、救助辦法。
  11. ( 3 ) the idea suggested in this paper of converting flood into utilizable resource 、 attempering flood by engineering means and supervising human behaviors in the flooded area. to overcome the various barriers arising from ideology 、 systems 、 technology and economy which the establishment of risk management system of flood will be confronted with, this paper also suggests a statistical approach to estimate extremum and the concept of gray - uncertainty risk in figuring flood risk and analyses the severe harmfulness of accidents of extremum risk, furthermore, supplements and perfects present quantity - analyzing method of risk loss

    3 、本文提出水資源化的觀念,以工程手段對水進行調節,以法律、行政、經濟、教育等綜合性的手段對人類在洪泛區中的行為進行管理,是削弱水的危害性、減輕水風險的有效方式,提高的防安全保障需求,實行水風險管理是必由之路。水風險管理體制的建立必然面臨觀念方面、體制方面、技術方面與經濟方面的重重障礙,並提出災風險評價的極值統計學方法和灰色-隨機風險率的概念,建立了其表達形式與計算方法,它完善了現有的風險損失量化方法。
  12. Article 32 people ' s government s of provinces, autonomous regions and municipalities directly under the central government in places where flooded areas or flood storage and detention areas are located should, as required by flood control planning, organize relevant departments and units to formulate safety and construction work plans for flooded areas and flood storage and detention areas, to bring under control population growth within flood storage and detention areas, to move residents in a planned way out of flood storage and detent ion areas which are frequently in use, and to take other necessary safety and protective measures

    第三十二條洪泛區、蓄滯區所在地的省、自治區、直轄市人民政府應當組織有關地區和部門,按照防規劃的要求,制定洪泛區、蓄滯區安全建設計劃,控制蓄滯區人口增長,對居住在經常使用的蓄滯區的居民,有計劃地組織外遷,並採取其他必要的安全保護措施。
  13. Construction of a village flood pumping scheme for pok wai in yuen long for solving the flooding problem in this black spot was completed in august

    位於元朗?圍的鄉村洪泛抽水計劃於八月竣工,解決了該黑點的水浸問題。
  14. In addition to the major river training works, village flood pumping schemes have been implemented to protect low - lying villages from flood hazards

    除了大型河道治理工程外,渠務署還實施鄉村洪泛抽水計劃,以解決低洼村落的水浸問題。
  15. It also includes an important sample of varzea ecosystems, igapo forests, lakes and channels which take the form of a constantly evolving aquatic mosaic that is home to the largest array of electric fish in the world

    保護區內不僅有平坦耕地生態系統、洪泛森林生態系統,還有無數湖泊和河流,這些水域以不同的形式相互演變,為世界上最大的發電魚類種群提供了棲息地。
  16. Considering the limited energy and transmission range of sensor nodes in sensor networks, an innovative routing algorithm named self - adaptive flooding based on delay is proposed. in this algorithm, sources deliver route request packets ( rreq ) and sink answers route reply packets ( rrep ) to build routes. in order not to miss optimum routes with the best metrics, the algorithm is to wait a specific amount of time to ensure that almost the rreq near the best metrics is received

    為此本文在無線傳感器網路中研究了基於自適應的路由演算法,主要工作如下:針對傳感器節點能量及傳輸范圍有限等特點,提出了一種基於延遲的自適應洪泛路由演算法,首先通過源節點在網內用較小的路由請求報文和路由回復報文來建立路由,路由建立的過程中自適應地確定等待時間以使更優的路由請求報文得到轉發,然後源節點再沿著建立好的路徑轉發較大的數據報文。
  17. And discuss the structure types, depositional array and stacking pattern of the three orders of cycle sequences. on the basis of these studies, high degree of accuracy of time distinguishability and isochronous stratigraphy framework is established. and directing the sands into these isochronous stratigraphy framework, making isochronous tracing correlation

    通過這些研究建立了以中期旋迴層序界面和洪泛面為年代地層框架、以短期和超短期旋迴層序為?時地層對比單元的高時間精度解析度等時地層格架。
  18. Ice will not only influence shipping, transportation, hydraulic power, water and sewage, but also lead to ice flood and cause huge losses when ice blocks the river course severely

    河流中的冰凌不僅直接影響到冬季的航運、交通、引水發電、給排水等水利工程建設事業,而且當冰凌嚴重阻塞河道時,往往會導致凌洪泛濫成災,給人民生命財產帶來重大損失。
  19. In the research of flooding arithmetic, at first, we analyse the flooding efficient, robustness by the 3 - neighbor, 4 - neighbor and 6 - neighbor ’ s wsn. so we extend to the n - neighbor ’ s wsn. we give the formula about area of wsn ’ s deploy, count of wsn ’ s node, max distance of communications and average of neighbor ’ s count, and validate this formula by the simulate program. in the last, we analyse the flooding arithmetic ’ s lose rate, data efficient rate, energy efficient rate, network life, delay time by the simulate program

    洪泛演算法研究中,首先針對3 -鄰點、 4 -鄰點和6 -鄰點的無線傳感器網路分析了洪泛效率、網路健壯性,然後推廣到n -鄰點的無線傳感器網路中,並給出無線傳感器網路部署面積、節點個數、最大傳輸距離、和平均鄰點數之間的經驗公式,並用模擬程序進行了驗證。
  20. It is most important to define the sequence boundary and the maximum flood surface for sequence classification. sequence boundary is the turn - point of the falling and rising of the baselevel. the maximum flood surface is the turn - point of the rising and falling of the baselevel

    層序的劃分最重要是確定層序界面和最大洪泛面,層序界面為基準面下降和上升的轉折點,而最大洪泛面是基準面上升到下降的轉折點,這兩個面一旦確定,就可以劃分一個相對完整的層序。
分享友人