活動鏈 的英文怎麼說

中文拼音 [huódòngliàn]
活動鏈 英文
active chain
  • : Ⅰ動詞1 (生存; 有生命) live 2 [書面語](救活) save (the life of a person):活人無算 (of a goo...
  • : Ⅰ名詞1. (鏈子) chain Ⅱ動詞(用鏈栓住) chain; enchain Ⅲ量詞(計量海洋上距離的長度單位) cable length
  • 活動 : 1 (運動) move about; exercise 2 (動搖) shaky; unsteady 3 (不固定) movable; mobile; flexible...
  1. Be based on the reason of above, at tuberculosis the young men and women of mobile period shoulds not be marry live together, at present the many specific that fight consumptive disease is like streptomycin, isoniazid, acerbity to ammoniac willow natrium, rifampin to wait, can make much new come on the patient passes a year of to a year of half cure heal, its recrudesce rate is very low also

    基於以上的原因,處在肺結核期的男女青年不宜結婚同居,目前有大量的抗癆特效藥如黴素、異煙肼、對氨柳酸鈉、利福平等,可使大部分新發病患者經過一年到一年半治療而痊癒,其復發率也很低。
  2. Additional trials on aeronautical telecommunication network ( atn ), surface movement guidance and control system ( smgcs ), electronic flight strips ( efs ), secondary surveillance radar mode s data link and very high frequency data link ( vdl ) are planned for this year

    此外,有關航空通訊網路、地面引領管制系統、電子飛行紙條、 s模式的二次監察雷達數據路和甚高頻數據路的進一步試行運作,亦計劃在本年進行。
  3. Reach news, events hot links

    Reach新聞,與熱點
  4. This paper added a need essential, mutual industry, at the base of five competitive essential and added another main activity, immateriality asset, to the value chain

    在波特的五種競爭要素的基礎上又加入了互補產業這一要素;在波特的價值中,增加了另一項主體? ?無形資產創造
  5. If the scm model matches to the company ’ s strategy and production type, it can help the company carry out supply chain and realize bpr on basis of customer ’ s demand what will eliminate inefficacy activity of the operation. it can lead to the company get the initiative status. quite reverse is true, inefficacy brings negative effect

    與企業戰略和產品類型相匹配的供應運作模式可以幫助企業實現供應戰略;使企業能夠根據客戶需求重組業務流程,消除業務流程中不增值的無效,從而降低成本,提高收益,在市場競爭中占據主
  6. Through entity and nonentity value action analysis, we emphasis on study on system operation of logistics in integrated supply chain

    結合集成供應的實體和非實體價值,重點對集成供應中物流整體化運作從物流范圍和物流主體層面進行了詳細的分析。
  7. The new organization framework must be made sure the all and the parts work smoothly. establishing medium industrial link focusing on information industry which is formed by multi - medium and multi - performance

    構建一個以信息資源為中心,由多種介質形式、多種傳播構成的傳媒產業,實現經濟最優化;激人力資本。
  8. The activity had propagandized our club as well

    相關報道的接:高校交流中心主頁。
  9. Gets or sets the color used to display an active link

    獲取或設置用來顯示活動鏈接的顏色。
  10. Structure representing the active link color

    表示活動鏈接顏色的
  11. Gets or sets the color of the an active link in the control

    獲取或設置控制項中的活動鏈接的顏色。
  12. The toolbar consists of seven links, with the active link highlighted

    工具欄包含了7個接,其中高亮顯示了活動鏈接:
  13. Gets or sets the color of active links in the executable commands region

    獲取或設置可執行命令區中的活動鏈接的顏色。
  14. Gets or sets the color used to display an active link within cells in the column

    獲取或設置用於在列的單元格中顯示活動鏈接的顏色。
  15. Set the activity links to make the process appear as in figure 7

    設定活動鏈接,使流程如圖7所示。
  16. Shows how to set whether urls are displayed as active links or as plain text in the editor

    演示如何設置url在編輯器中顯示為活動鏈接還是顯示為純文本。
  17. Gets or sets the color of the active link in the control while the mouse pointer is over the link

    獲取或設置當鼠標指針處于控制項中的活動鏈接上時該接的顏色。
  18. The maximum number of active connections that can be allocated from this pool at the same time, or zero for no limit

    理解:同一時間能夠從池中獲取的最大的活動鏈接數。 (也就是一個池的最大並發量) ,為0表示不限制。
  19. Event types : process instance, activity, link and variable

    事件類型:流程實例、接和變量。
  20. ( 2 ). wbs is an important basis in project management and a necessary clue of activity chain. taking the aim and function of the srttep plan as a starting point in consideration, with the introduction of the prearranging ideas such as concept design, detailed design and rolling design, the thesis puts forward project working structure resolving method based on wbs three - class model, thus realizing the working structure resolution by using gradually - deepened gradation model and laying foundation on better plan, staff disposition and budget plan

    ( 2 )項目工作結構分解( wbs )是項目管理的重要依據和活動鏈接的必要線索,本文從川塔施建工程項目工作計劃的目的和作用出發,引入概念設計、詳細設計、滾設計的事前規劃思想,提出了基於wbs三級模型的項目工作結構劃分方法,利用逐級深入的層次模型實現項目的工作結構分解,為項目進一步的進度計劃、人員分配、預算計劃奠定了堅實的基礎。
分享友人