派生構造 的英文怎麼說

中文拼音 [pàishēnggòuzào]
派生構造 英文
derivative structure
  • : 派構詞成分。
  • : Ⅰ動詞1 (生育; 生殖) give birth to; bear 2 (出生) be born 3 (生長) grow 4 (生存; 活) live;...
  • : Ⅰ動詞1 (構造; 組合) construct; form; compose 2 (結成) fabricate; make up 3 (建造; 架屋) bui...
  • : Ⅰ動詞1 (做; 製作) make; build; create; produce 2 (假編) cook up; fabricate; concoct 3 [書面語...
  • 構造 : structure; construction; constructional detail; tectonic; structural; makeup; anatomy; constituti...
  1. Alkali basite, which came from upper mantle or lower crust, invaded through those structure, which not only bring cu et al mineralizing elements, but also the most important is that thermal energy. it cycled the formation water ( yinmin fonnation and luoxue formation ), and form alkali - rich, middle - high temperature and salinity fluid mixed with alkali - rich magmatic water. there were high rate of percolation and well voidage in the contact zone between yinmin purple stratum and yinmin rubblerocks, which is in favor of the transposition and mineralization of minerogenetic fluids

    因此,總結東川稀礦山式銅礦成礦模式為沉積( fe 、 cu ) ?熱液疊加( cu )改:晉寧-澄江期,小江深大斷裂發走滑運動,在東川礦區成右行旋扭及其派生構造,形成「 z 」字形落因破碎帶,同時來自深源(下地殼或上地幔)堿基性巖漿侵入,不僅帶來了大量cu等成礦物質,更重要的是提供了熱源,促使地層水(落雪組白雲巖和因民組紫色層)循環,與富堿( na和k )巖漿水混合,形成富堿中高溫高鹽度流體。
  2. D ) the invasion of jinningian - chengjiangian alkali basite were unambiguous, the distribution of those rocks form " z " in shape, which similar with luoyin fracture zone and the distribution of copper deposit. it shows that copper deposits were controlled by discordogenic fault and its derived sub - structure, and there are relationship between copper deposit and jinningian - chengjiangian alkali basite. e ) most of minerogenetic age of copper deposit, which located in kunyang rift valley, belongs to jinningian - chengjiangian ( between 900 - 650ma ), similar with the time limit of breaking - up of rodinia

    東川礦區晉寧-澄江期堿基性巖侵入活動明顯,常作為因民組復雜角礫巖膠結物和巖脈(體)產出,多分佈於深大斷裂及其的次級附近,明顯受南北向小江深大斷裂走滑運動引起的右行旋扭及其派生構造控制,與「落因破碎帶」和「銅礦分佈」較吻合,均為「 z 」字形。
  3. System issues and application frameworks were constructed with abstract objects, and the instance objects were derived from the abstract objects to separate the frameworks with the instance objects

    在用抽象對象作為惟一元素出穩定的系統組織結和應用框架后,從抽象對象出實例對象以實現框架和實例對象的分離。
  4. For example, when a class is unsealed a developer can add a constructor to a type derived from the class, and use that constructor to initialize the base class properties to the values required for the scenario

    例如,如果某個類是未密封的,則開發人員可以向從該類的類型添加一個函數,然後使用該函數將基類屬性初始化為所需的值。
  5. The constructor on each derived class is using its base class initializer

    每個類的函數都使用其基類的初始值設定項。
  6. Use the constructors of derived classes to get an instance with different settings ; for example, the

    使用類的函數來獲取帶有不同設置的實例。例如,
  7. Method must be called at the end of the constructor for derived classes to complete the initialization of the

    給繼承者的說明必須在類的函數的末尾調用
  8. If you override the base class constructor, you should explicitly call it in the constructor of your derived class

    如果重寫基類函數,則應在類的函數中顯式調用它。
  9. The study of geological characteristics and geochemical conditions of mazhuangshan gold deposit shows that it is closely related with old metamorphic basement and volcano - magmatic activities as well as volcanics and volcaniclastics of mazhuangshan - mingshui superimposed volcanic basin, and controlled by structures derived from closure of late palaeozoic honghe basin

    摘要對馬莊山金礦地質特徵及地球化學條件研究表明,馬莊山金礦的形成與古老變質基底、火山巖漿活動及馬莊山一明水上疊火山巖盆地的火山巖、火山碎屑巖緊密相關,並受到晚古代紅河盆地閉合而控制。
  10. Through a comprehensive study of several schools, the author tries to build up a dynamic system model, points out that competitive advantage roots in the competitive advantage of strategic resource reserve, potential energy by combining the value chain of the network based on the favorable strategy ecological value - chain node, the constant adjustment according to the requirement of environment changing and even prearranged dynamic advantage and innovative advantage based on strategy implement

    由此架出融合各個理論學有益觀點的競爭優勢來源的系統動態模型,提出企業持續競爭優勢主要來源於戰略性資源存量的競爭優勢、基於有利的戰略態價值鏈節點整合網路價值鏈的位勢優勢、根據環境發展變化而不斷調整適應甚至預先創的動態優勢以及基於戰略執行的創新優勢等等。
  11. It indicates there are close relationship between the forming of copper deposit in kunyang rift valley and the breaking - up of rodinia

    表明東川礦區銅礦形成與深大斷裂及其次級和晉寧?澄江期堿基性巖侵入活動關系密切; 5
  12. The main idea of this hybrid algorithm is : at first, all candidates in task collection is lined according to a dispatching rule ( earliest due date, edd ), then this linear queue is divided into some tiers under a criterion that partial order is not allowed to exist in the every tier, many feasible sequences is generated by constructing a neighborhood of a initial sequence in every tier, the allocation of the resources over time is conducted to perform every feasible task sequence, and a set of approximate optimal scheduling schemes is achieved as the precondition of the next tier ’ s disposal in meeting multiple scheduling objectives to obtain the global near - optimal schedule which makes these program run tier by tier until the last task is completed

    該演算法按照最早完工時間優先( ect )分規則,先將參加排序的工序合併成一個串列序列,然後按照同層內不存在偏序關系的原則,將其分解為若干個時間上相互銜接的層次,在每個層次內部,通過鄰域產出多個可行序列,對每個可行序列進行設備配置,採用鄰域搜索演算法進行方案的尋優,保留一組滿足評價要求的可行方案作為下一層設備配置的背景環境,通過層層遞進最終獲取全局的近似最優解。
  13. This constructor is called by derived class constructors to initialize state in this type

    函數調用此函數初始化該類型中的狀態。
  14. This constructor is called to initialize state in the type whenever an instance of the derived class is created

    每當創建類的實例時,都會調用此函數以初始化類型中的狀態。
  15. At that point, the code in the constructor for the base class executes, followed by the code in each constructor in all derived classes and the code in the most derived classes is executed last

    函數,直到到達基類的函數。此時,基類函數中的代碼執行,接著執行所有類中每個函數的代碼,最後執行最相近的類中的代碼。
  16. Regarding the need to assign resources to every project over time and avoid conflicts due to resource contention, this study applies high level petri nets to simulate the multi - project network, thus generates a schedule that minimizes makespan while preserving resource feasibility

    考?需要對個別專案分資源以及避免專案間因資源競爭所成的沖突,本研究應用高階斐氏圖建多重專案的網?模型,並且經由模擬成總體時間為最短、卻?成資源沖突的排程。
分享友人