流入物槽 的英文怎麼說

中文拼音 [liúcáo]
流入物槽 英文
influent tank
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : Ⅰ動詞1 (進來或進去) enter 2 (參加) join; be admitted into; become a member of 3 (合乎) conf...
  • : 名詞1 (東西) thing; matter; object 2 (指自己以外的人或與己相對的環境) other people; the outsi...
  • : 名詞1 (盛牲口飼料或飲料等液體的器具) trough; manger (for water animal feed wine vat) 2 (兩邊...
  • 流入 : inflow; influx; indraught流入角 fluid inlet angle; influx angle; 流入量 influx; inflow
  1. The incident wave height h1 / 3 is in the range from 0. 1m to 0. 25m, and the peak period tp in the range from 1. 0s to 2. 0s. the ratio of s / h1 / 3, which refers to the subface level of wharf deck ( s ) to the incident wave height ( h1 / 3 ), is between - 0. 1 and 0. 7. three different shore connecting types : open - piled, permeable slope with armored 1ayer of dolosse b locks and impermeable slope with armored layer of concrete plate, are set in the experiment for the research on the effects of boundary condition with different shore connecting types on the wave impact

    本文的理模型試驗在大連理工大學海岸和近海工程國家重點實驗室的大波中進行,試驗中選用的隨機波靶譜為改進的jonswap譜,射波波高h _ ( 1 / 3 )范圍為0 . 1m 0 . 25m ,譜峰周期t _ p范圍為1 . 0s 2 . 0s ,碼頭面板的相對凈空(碼頭面板底面距離靜水面的距離s與射波波高h _ ( 1 / 3 )的比值)范圍為- 0 . 1 0 . 7 ,其中s / h _ ( 1 / 3 )為負值時表示碼頭面板底面位於靜水面以下。
  2. The material was change to liquid material after pass through a chute and then flow into the flow valve, which can prevent the flow control parts from forming columnar material

    料先通過一段小斜,使態化,然後再進量閥,這樣可避免在量控制部分形成料柱。
  3. Thousands of tons of pesticides are blown off the fields into the sea, detergents from millions of sinks kill fish, and fertilizers, flushed out to sea, nourish explosions of plankton which cover bathers with itchy slime

    數以千噸計的農藥從農田裡擴散出來並最終大海;從數百萬水中排放出來的清潔劑導致(大量)魚(類)的死亡;化學肥料奔海,促使浮游生的迅猛繁殖和分泌出使泳客渾身發癢的黏液。
  4. ( 2 ) a series of experiments on time scale distortion are made with real river model, inflow and outflow boundary condition, and continuous simulation. by means of analysis of the experimental data on model water level, water - surface gradient, cross velocity, outflow discharge process and the sediment transportation capacity, the main physical reasons for the above hydraulic parameters deviations caused by time scale distortion are illustrated : response delay of model channel storage capacity and rate of water level with time

    ( 2 )採用真實的河工模型和邊界控制條件以及連續模擬的方法進行了有關時間變態率的系列試驗,通過模型水位、比降、速、出口量過程線和斷面挾沙力試驗資料的分析,闡明了時間變態引起上述各種水力參數偏離的主要理原因:模型的蓄響應和洪水過程時間變化率的響應滯后。
  5. The large water conservancy engineering transporting water from south to north will relieve the lack of water resource of north - west and north - china regions. it has been wrote into " tenth five - year plan " of china. as a building spanning rivers to transport water, large - scale aqueduct plays an important role in this water conservancy engineering

    南水北調水利工程是為緩解我國西北及華北地區水資源缺乏而將興建的大型水利工程,現已列我國「十五」發展計劃,其中大型渡作為跨越河等的輸水建築在南水北調水利工程中佔有重要地位。
  6. These are usually caused by accidental entry of a spoon, bottle cap or other foreign object. to correct this, turn off electrical switch and water. after disposer has stopped, remove object with long handled tongs

    噪音很大通常是由於磨碎內有堅硬的品意外掉,如湯匙或瓶蓋等,排除故障要先關掉食垃圾處理器和水,等磨碎轉盤停止后,用長臂夾子檢查機器並取出異
分享友人