流水水槽 的英文怎麼說

中文拼音 [liúshuǐshuǐcáo]
流水水槽 英文
stream aquarium
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : 名詞1 (盛牲口飼料或飲料等液體的器具) trough; manger (for water animal feed wine vat) 2 (兩邊...
  • 流水 : 1 (流動的水) running water; stream2 (舊時指商店的銷貨額) turnover (in business)流水搬運作用...
  • 水槽 : water channel; trough; pentrough; mantle; water slide (運木材用); cistern; scoop channel; gulle...
  1. The flumes are used extensively to measure watershed turnoff.

    廣泛用於測量集區的經量。
  2. These meters find wide use in open channel measurement and are usually a type of weir or flume.

    這些量計在明渠測量中得到廣泛地應用,通常是以或堰的形式出現。
  3. Through the study above, a refined description and modeling to flow field and water surface near the groyne in river is conducted with 2 - d and 3 - d mathematical models. the results by simulation are consistent well with experiment data

    通過上述研究,作者採用二維和三維數學模型對試驗和天然河道中丁壩附近場和面形態進行了精細地描述和模擬,計算結果和實測結果吻合良好。
  4. I can sleep in late, waking up occasionally to hear soothing patter on the roof, water racing down the gutter

    我可以睡到很晚,時而醒來傾聽屋檐上柔和的拍打,順著往下的聲音。
  5. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧庫供工程取頭部由引、節制閘、進閘、泄閘等建築物組成。由於本工程場地條件限制,增設旁通管后布置非常緊湊,管道急轉角度大且轉彎距離較小,對于管內態是否滿足要求,需要經過模型試驗進行論證,以確保工程的可靠性。旁通管具有上與泄要求,對其過能力也要經試驗確定,為碧庫增建旁通管設計提供依據。
  6. Observed tidal harmonic constants in many stations are used to verify the astronomical tides in the compound fluid model. the wave model is tested by a set of wave flume data at first. then the results are compared by the actual processes of significant wave height in gauging stations

    其中復合場模型中的天文潮利用眾多測站的實測調和常數進行驗證;波浪模型首先進行了實驗的檢驗,然後在臺風過程中,進行了測站有效波高過程線的比較。
  7. Standards for municipal wastewater discharge measurement. broad - crested weir

    城市排量堰測量標準.寬頂堰
  8. The incident wave height h1 / 3 is in the range from 0. 1m to 0. 25m, and the peak period tp in the range from 1. 0s to 2. 0s. the ratio of s / h1 / 3, which refers to the subface level of wharf deck ( s ) to the incident wave height ( h1 / 3 ), is between - 0. 1 and 0. 7. three different shore connecting types : open - piled, permeable slope with armored 1ayer of dolosse b locks and impermeable slope with armored layer of concrete plate, are set in the experiment for the research on the effects of boundary condition with different shore connecting types on the wave impact

    本文的物理模型試驗在大連理工大學海岸和近海工程國家重點實驗室的大波中進行,試驗中選用的隨機波靶譜為改進的jonswap譜,入射波波高h _ ( 1 / 3 )范圍為0 . 1m 0 . 25m ,譜峰周期t _ p范圍為1 . 0s 2 . 0s ,碼頭面板的相對凈空(碼頭面板底面距離靜面的距離s與入射波波高h _ ( 1 / 3 )的比值)范圍為- 0 . 1 0 . 7 ,其中s / h _ ( 1 / 3 )為負值時表示碼頭面板底面位於靜面以下。
  9. The flume experiment with single spur dike is carried out. water surface profile and velocity field of flow in flume are measured by manometer tube and propeller current meter respectively

    首先進行了單丁壩實驗,採用測壓管和旋漿速儀對實驗位以及速場進行了詳細的測量。
  10. Only the method for using backwater expression can predict the variation of water surface near the spur dike very well. numerical simulations of the flume experiment cases are carried out with the standard k - e turbulence model

    隨后採用標準k一e紊數學模型,依據試驗資料,數值模擬了繞壩和漫壩兩種情況下動過程。
  11. The results of flume experiment indicated that, the flow velocity and froude number of the overland flow would fall with the rainfall splash intensity rose ; the flow depth and resistance coefficient would enhance with the rainfall splash intensity increased

    試驗結果表明:面薄層速及弗汝德數隨雨滴打擊強度的增加而降低,深、阻力系數隨雨滴打擊強度的增加而增加。
  12. By means of the study the main results are listed as follows : ( 1 ) the results of flume experiment and simulated rainfall experiment with a fixed intensity indicated that, the influencing degree of rainfall on overland flow velocity had something to do with the runoff discharge above and rainfall intensity

    通過研究取得了如下結論: ( 1 )試驗和定雨強模擬降雨試驗結果表明,降雨對坡面薄層速的作用與放量和雨強大小有關。
  13. The flow - measuring system adopts the khafagi flume as the first sense organ to realize the flow / head signal conversion. the head signal is picked up and converted into voltage signal by the buoy - level mechanism and the magnet - resistant angle measuring sensor

    量測量系統採用卡發基作為一次敏感器件實現了位的信號轉換,並通過浮子?杠桿測量機構和磁阻式角度傳感器對位信號進行拾取並轉化為電壓信號輸出。
  14. Then, with the water running off him, he got into an old smock and skirt that had belonged to his grandmother and bought a grammar of the bull s language to study but he could never learn a word of it except the first personal pronoun which he copied out big and got off by heart and if ever he went out for a walk he filled his pockets with chalk to write it up on what took his fancy, the side of a rock or a teahouse table or a bale of cotton or a corkfloat

    「此後, 」文森特先生曰, 「哈利於當眾廷臣之面,將頭扎進牛之飲,及至從中伸出頭后,告以自己之新名142 。彼聽任嘩嘩淌,身著祖母所遺舊罩衫及裙子,並購一冊公牛語143語法書習之。然而只學會人稱代名詞,遂用大字抄錄,默記之,每當外出散步,衣袋中輒裝滿粉筆,在巖石邊沿茶館桌子棉花包或軟木浮子上胡亂塗寫。
  15. Wastewater collected from canteen kitchens, including that from basins, sinks and floor drains shall be fitted into foul sewer via grease traps capable for providing at least 20 minutes retention during peak flow

    來自食堂廚房的廢,包括來自池、和地面排管的,應經由最大量時能夠保持20分鐘的集油器,排入污道。
  16. An inclined trough in which crushed ore is washed with running water to flush away impurities

    洗礦,淘汰盤一個傾斜的,在其中被碾壓的礦石被沖刷以沖走雜質
  17. The outline tests on the alignment of spur dikes in the flume with repeated tidal flow were carried out based on the alignment of the regulation structures in the north trough of the deep waterway in the yangtze estuary

    摘要結合長江口深航道治理二期工程北中整治建築物的布置形式,在潮汐往復中進行了丁壩群不同布置形式的概化試驗。
  18. Thousands of tons of pesticides are blown off the fields into the sea, detergents from millions of sinks kill fish, and fertilizers, flushed out to sea, nourish explosions of plankton which cover bathers with itchy slime

    數以千噸計的農藥從農田裡擴散出來並最終入大海;從數百萬中排放出來的清潔劑導致(大量)魚(類)的死亡;化學肥料奔入海,促使浮游生物的迅猛繁殖和分泌出使泳客渾身發癢的黏液。
  19. Finished the following important consulting projects in recent years : ( 1 ) to take charge of and participate in the design of the project of 25 thousand - ton petrol and gas quays of the jiangyin petrol company. ( 2 ) to take charge of and parricipate in the design of the project of 25 thousand - ton petrol and gas quays of zhang jia gang hada company. ( 3 ) to organize the feasibility study on the coastal engineering test hall construction project of nhri. to take charge of and participate in the design of the hall ( a large - size wave basin, 70m long and 50m wide. was constructed in it ). ( 4 ) to organize the project feasibility study of the laboratory of nhri for the basic law research on sediment transport, to take charge of the design of the project, and to participate in the design of the wind and wave flume ( 180m long ), in which the scientific research projects of waterway training works and coastal engineering structures can be carried out under the combined action of wind, wave and current

    近幾年來主要完成以下幾項重大工程: 1 .主持並參與江陰石油公司2 . 5萬噸級油氣碼頭的設計; 2 .主持並參與張家港哈德公司2 . 5萬噸級油氣碼頭的設計; 3 .編寫了南京科院海岸工程試驗廳可行性研究報告,主持並參與該試驗廳的工程設計,在該試驗廳內建有70米長50米寬的大型波浪池; 4 .編寫了南京科院「泥沙運動基本規律研究實驗室」工程可行性研究報告,並主持該項工程設計,參與完成180米長風浪設計,該建成后,可在風、浪、綜合作用下進行航道整治和海岸工程的科學研究。
  20. A furrow or groove formed by running water

    犁溝由形成的或小溝
分享友人