流程布置 的英文怎麼說

中文拼音 [liúchéngzhì]
流程布置 英文
layout
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : 名詞1 (規章; 法式) rule; regulation 2 (進度; 程序) order; procedure 3 (路途; 一段路) journe...
  • : 動詞1. (擱; 放) place; put; lay 2. (設立; 布置) set up; establish; arrange; fix up 3. (購置) buy; purchase
  • 流程 : 1 (水流的路程) flow path; the distance of the flow water2 (各項工序安排的程序) procedure; tec...
  1. From four parts, the paper expounds upon the feature of the new process and the plant arrangement, and discussed emphatically the procedure of manufacturing 1 - hexene from 2 - butene isomerazation reaction & 1 - butene automethathesis and hexene isomerazation reaction

    摘要論述了天津石化乙烯回收新技術擴大中試裝的工藝特點、新工藝的主要和設備的設計方法。
  2. Study on refrigerant circuitry design for condensers

    冷凝器流程布置方案的研究與探討
  3. According to the design principle of systems construction, this paper offers the collectivity layout projet which particularly introduces design thought in some aspects, for example : in function, in physical structure, in configure of software and hardware and son on. finally, this paper detailedly introduces the principle, the function, the flow and the systems structure of six subsystems which involved in urban public safety traffic management control system. the six subsystems are : geography information system

    按系統建設的原則,論文給出了系統建設的總體設計方案,從功能上、物理結構上和軟硬體配等方面詳細介紹了城市公安交通管理控制系統的設計思路,最後,論文詳細地介紹了城市公安交通管理控制系統的六個子系統? ?地理信息系統、指揮調度管理系統、交通信號控制系統、車輛闖紅燈自動拍照系統、交通信息發系統和電子數據大屏顯示系統等的原理、功能和處理和系統構成。
  4. At the moment when i entered her subbranch in tongbo road, my dream became concrete which was abstract before. i saw her future from every smiling face of her client, i saw her standardized management from the settings of her hall and its ruly operation flow, and i saw her employees ' commitment from their service manner

    就是邁入招商銀行桐柏路支行的那一剎那,我的夢想瞬間由抽象變得具體:從顧客那一張張笑臉我中看到了招行的前途,從大廳環境和有條不紊的業務中我看到了規范的管理,從服務態度中我看到了員工的敬業。
  5. By arrangement of the control channels through which the hydraulic fluid flows from the discharge chamber into the oil reservoir, this allows any gas bubbles being released from the hydraulic fluid during the suction stroke to be expelled into the oil reservoir

    通過液壓油經控制通道由排出腔入油槽的這種,使得任何在吸入沖從液壓油中釋放出來的氣泡都被排到油槽中。
  6. The optimization of laying out these structures, paths of flow jets and a water cushion pool for a high arch dam is first discussed systematically in this paper

    本文首次系統地對高拱壩壩身泄洪孔口、泄以及壩下水墊塘的優化問題進行了討論。主要內容和成果有1
  7. To provide necessary data for design bypass pipe, an enlargement to bi liu river reservoir, the following problems have been studied by hydraulic model and theoretical analysis : the energy losses in water head of the bypass pipe system and of the flow - control valve and their scale effects, measurement and calculation of the discharge of the bypass pipe system during the bypass pipe system operation with and without the new water power station, the hydraulic characteristics of the water tunnel and draw - off pipe, the flow rate of the aqueduct bridge and the draw - off pipe and the water elevation of the flow in the aqueduct bridge during the old water power station operation with and without the new water power station

    大連市碧河水庫供水工取水頭部由引水渡槽、節制閘、進水閘、泄水閘等建築物組成。由於本工場地條件限制,增設旁通管后非常緊湊,管道急轉角度大且轉彎距離較小,對于管內水態是否滿足要求,需要經過模型試驗進行論證,以確保工的可靠性。旁通管具有上水與泄水要求,對其過能力也要經試驗確定,為碧河水庫增建旁通管設計提供依據。
  8. It elucidates the grade and layout of the construction diversion structures, testifies the technical rationality and economic advisability that the alternative of the cofferdam uses to dam up the discharge ( p = 10 %, q = 275. 2m3 / s ) during the post - flood period, was made by hydraulic calculation, structural design, investment comparison, progress analysis and investment risk analysis

    文中說明了施工導建築物的等級、水工。通過水力學計算、結構設計、導方案投資比較、進度分析和投資風險分析,說明了四湖溝水利樞紐工採用圍堰擋汛后時段洪水導方案的合理性和經濟性,為施工決策提供理論依據。
  9. The subject of this thesis is to study ironless moving coil linear permanent magnet synchronous motor and the major works in this thesis are summarized as follows : 1 ) two analytical formulas are derived by concentrated current method and distributed current method to determine the magnetic field due to pm, based on the current model of pm. besides, two method ( magnetic charge method and solution by laplace equation method ) are also introduced with comparing their advantages and disadvantages. then the effects of the motor parameters on the flux distribution are discussed

    本文對空芯動圈式直線同步電動機進行了深入細致的研究,內容包括: ( 1 )採用電模型推導出兩種計算永磁磁極二維氣隙磁場的解析公式(集中電法、分佈電法) ,同時介紹了兩種永磁電機氣隙磁場計算方法(磁荷法,直接求解拉氏方法) ,分析各種方法的優缺點,討論電機參數對氣隙磁密的影響; ( 2 )介紹了單層同心繞組的方式,根據安培定律推導出空芯動圈式直線永磁同步電動機的靜推力計算公式,分析靜態力?位移特性; ( 3 )建立空芯動圈式直線永磁同步電動機動態模擬模型,模擬不同驅動方式下電動機起動、穩態運行時電磁力、速度、位移的變化情況。
  10. The outline tests on the alignment of spur dikes in the flume with repeated tidal flow were carried out based on the alignment of the regulation structures in the north trough of the deep waterway in the yangtze estuary

    摘要結合長江口深水航道治理二期工北槽中整治建築物的形式,在潮汐往復水槽中進行了丁壩群不同形式的概化試驗。
  11. According to the mis configuration and flows, dfmis - 1 software system has been programmed which is composed of inventory management subsystem, purchasing management subsystem and manufacturing schedule management subsystem. through studying deeply manufacturing schedule management, we find a way to make mrpii and jit be jointed together into manufacturing schedule and monitoring block. the study discusses especially how to make certain the producing period of all of component during dynamic manufacturing with methods of jit and " electronic bulletin ", how to get true capability of implementing plans in all working procedure section, and how to empower monitoring manufacturing in order to avoiding break between working procedure sections

    其中一項就是設計並實施了整個公司的網路綜合線和計算機系統的配;第二項是根據公司最急需的功能,從「信息」 、 「物」和「資金」的角度,提出了相適應的mis結構和,據此開發出具有庫存、采購和生產計劃管理功能的dfmis - 1軟體系統,並對其中的生產計劃管理模塊進行了較深入的研究,實現了mrpii和jit在生產計劃、生產監督上的結合和應用,特別對利用jit及其「電子看板」在生產動態中確定零部件的生產周期、獲得各工序段實際執行計劃的能力,以及在加強生產監督、避免各工序之間的脫節上做了進一步的探討。
  12. Describes the design and realization of partial run - time reconfigurable fpga in detail. in order to reduce the affect of the reconfiguration time on system execution time, mostly static circuit design method in logical design stage and incremental routing method in component implementation stage are proposed. the fft parallel processing algorithm is examined through vvp platform

    本章詳細闡述了基於vvp平臺的多sharc功能插板的具體硬體實現,以動態重構fpga設計為核心,論述了局部動態重構fpga設計和方法,提出了極大靜態電路邏輯設計方法和遞增式線方法,以達到減小動態重配時間,提高系統運行效率的目的。
  13. In this paper, reasons of sedimentation and current movement status in mawei docks often thousands tons were studied, furthermore, a good many questions brought forward from engineering practice are satisfactorily answered

    整治工時,應以落潮為主,盡量使得港池水域位於彎曲水凹岸,同時位於頂沖點附近,以利於維持和改善港池水深。
  14. Numerical simulation and study of refrigerant circuitry in evaporator

    蒸發器流程布置的數值模擬研究與分析
  15. Based on the - ntu method, numerically simulates the refrigerant circuitry of the condensers with 2 to 4 rows of tubing and analyses the characteristics of the heat transfer and flow

    摘要運用分佈參數模型對2 ~ 4排管冷凝器的流程布置方式進行了模擬計算,並對其換熱和動特性進行了分析和研究。
  16. In order to get a reasonable layout of technological process, the breaker is designed in two ways of installation of which customers can make a choice. with the operator facing the charging hopper, the motor installed on the left side is called left installation, otherwise, called right installation. they can not be exchanged with each other

    為適應合理的工作流程布置,我廠設計有左、右安裝兩種形式,供用戶選擇,左右安裝的區別為:以人面對機器進料口為準,如電動機在左側為「左裝」反之,電動機在右側為「右裝」 ,兩種型式不能互換。
  17. This article first introduces physical geography general situation, clarifies the rank of this hydroproject, the grade and layout of its hydraulic structures, and expounds the necessity and feasibility of this project. then, this paper further gave a clear explanation of the developing summarize of construction diversion for embankment dams. this study made a theoretical preparation for its construction diversion

    本文首先介紹了四湖溝水利樞紐工的天然地理概況,闡明了水工建築物的等級及工,說明了四湖溝工建設的必要性和可行性,文中進一步闡明了土石壩施工導發展的概況,為四湖溝水利樞紐工施工導作出了理論上的準備。
  18. For tianjin olympic center stadium project, parameters determination of a natural lake used as cooling pond and the layout plan of the lake were introduced, including the flow scheme of recirculating cooling water system, calculation of heat released from cooling pond, engineering arrangement for the lake, and the lake water treatment, etc

    摘要結合天津奧林匹克中心體育場工,介紹了利用天然湖作為冷卻池的參數確定及湖平面設計,具體包括冷卻循環水系統、冷卻池排熱量計算、冷卻湖的工、湖水水質處理等。
  19. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽工的科研項目,綜述三峽工開工以來的主要科研成果及工應用情況,包括:一期土石圍堰基礎處理與施工技術;大江截上下游土石圍堰平拋墊底研究;二期圍堰防滲工研究;大江截計算機科學管理;大壩混凝土澆築方案及主要施工機械選型;混凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進水口型式研究;鋼襯鋼筋混凝土引水管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道、輸水系統及水力學、高邊坡穩定、混凝土襯砌墻的結構與支護研究;特大型水輪發電機組的科學研究。
  20. In light of the special natural conditions and project layout characteristics of xiangjiaba hydropower station, a stage diversion scheme with the left bank being closed at the first stage and the right bank closed at the second stage has been selected through comparison of several schemes under the consideration of the aspects such as construction layout, late - stage flood control, navigation during the construction, and the construction period before the commissioning of the first hydropower generating unit

    摘要針對向家壩水電站特殊的自然條件和工特點,其施工導經過對多個方案進行比較,從施工、後期度汛、施工期通航、發電工期等方面考慮,選擇了第一期圍左岸、第二期圍右岸的分期導方案。
分享友人