海堤 的英文怎麼說
中文拼音 [hǎidī]
海堤
英文
coastal levee; sea embankment; sea wall; groyne; groin; [地質學] levee- 堤 : 堤形容詞[書面語] (水清見底的樣子) (of water) clear
-
The west sea coffer dam, which is not used for potable water could then be used as a water ski centre to help establishing this sport in hk
用作貯存非飲用水的西海堤便可因而用作滑水中心,以協助在香港推廣這項活動。Water ski centre at the west sea coffer dam would, on a shared basis, provide the " classic " water - skiing towed by boat. cable ski course may also be offered
設于西面海堤的滑水中心會提供傳統的由小艇拖行的滑水活動,亦可提供使用繩索的滑水活動。The proposal is to make use of the west sea coffer dam and chong hing water sports centre as a water ski centre to reduce potential risk of collision in open sea while the existing activities to be relocated to the high island reservoir
這項建議旨在使用西面海堤和創興水上活動中心作為滑水中心,以減低在海面進行滑水活動可能發生碰撞的危險,而現有的活動則可遷往萬宜水庫。Longer term post - construction monitoring of sloping seawall for hard coral establishment, and in case of non - establishment of corals undertake additional mitigations and or translocation of coral polyps
延長斜坡海堤築成后的監察期,確保硬體珊瑚健康成長若未能達致預期效果,則採取其他緩解措施及或移殖珊瑚蟲Sudden drawdown also occurs at low tide behind any sea wall which is wetted at high tide.
在高潮時浸濕的任何海堤的後面,當低潮時也會出現急遽的水面降落現象。The analysis indicates that the recovering rate of the salt marshes is related to the residual salt marshes area outside the seawall
分析表明鹽沼恢復的速度與圍墾以後海堤外側予留的鹽沼面積有關。The sea wall sustains the shock of the waves.
海堤能抵擋海浪的沖擊。The sea wall sustained the shock of waves
海堤經得起海浪的沖擊。The sea wall completlon ceremony
海堤落成典禮Sea wall opening
海堤通孔Because of the fact that they are largely surrounded by a sea wall, they are particularly vulnerable to pollution from vessels using them and from the shore
避風塘三面被海堤包圍,潮汐漲退沖刷能力低,特別容易受岸邊和灣內船隻的污染物影響。The seawall sustains the shock of the waves.
海堤是能抵擋海浪的沖擊。We have effectively killed smooth cordgrass ( spartina alteriflora ) outside the qingjiao dyke of haicang by using selective herbicide on 15th, july, 2005
摘要2005年7月15日對廈門海滄青礁海堤外的互花米草進行藥物殺除,試驗選用的除草劑對互花米草的殺除有效。Application of method of disposing for quick dike building on undersaturated weakground
深水軟基快速處理方法在海堤工程中的應用Seawall and sluice are the parts constructed in advance, while final closure is the last part in construction. the hydraulic condition during the final closure process is worse than that during any other processes. and with the compressing of the entrance, the hydraulic condition becomes badly, the drop height of entrance can reach 2 to 3 meter, the maximum velocity of flow even reaches 6 to 8 meter per second and flow condition also becomes complex
海堤和水閘的修建都是圍海工程先期施工的部分,堵口則是海堤修築的最後階段,堵口合龍成敗關繫到圍海工程成敗,由於此階段所遇到的水力條件十分惡劣,口門落差可達2 3m ,流速最大可達到6 8m / s ,且水流極其復雜,根據我國《圍海工程技術規范》規定圍海堵口必須進行龍口水力計算。As a new foundation improvement technology, the cast - in - situ concrete thin - wall pipe pile ( pcc pile ) is applied widely in the construction of the highway, civil architecture, haven and sea embankment etc. the pcc pile has a great prospect because it has superiority in the treatment of soils, such as construction period, cost and environment protection
現澆混凝土薄壁管樁(簡稱pcc樁)及其復合地基是一種全新的地基處理新技術,已應用於高速公路、民用建築、港口、海堤等工程建設中, pcc樁在處理效果、工期、造價、環保等方面具有較大的優越性,因此在地基處理中具有廣闊的應用前景。The use of a vertical seawall resting above the rock fill mound would minimize the width of the base
在毛石堆上建造垂直海堤可減少底座的闊度Associated reclamation and seawall construction ; and
進行相關填海及海堤建造工程及Discovery bay plaza la coasta capeland drive
愉景廣場海堤居蘅安徑Reclamation and associated construction of a 970m long seawall
填海及興建相關的一條970米長的海堤分享友人