涌水井 的英文怎麼說
中文拼音 [yǒngshuǐjǐng]
涌水井
英文
artesian flowing well-
The practice of grout solidifying and caulking of the underground hydrology drill after water outburst
井下水文鉆孔涌水后注漿固孔與堵水實踐Based on analysis of geologic foundation record about pingzhuang basin, a lot of sino - foreign geothermal geology record and investigation of field geology, measuring of ground temperature in person and geo - chemical analysis of ascension spring, gushing water of fault, the fact that the anomaly of geothermal gradient of pingzhuang basin, which is in region of low geothermal gradient, is caused by redistribution of conduction - oriented geothermal heat flow which is result from upheaval and depression of basin foundation bed is pointed out. after the field of ground temperature is simulated under the background of conduction - oriented geothermal heat flow by means of ansys, the characteristic of ground temperature distribution of top surface of basin foundation bed ( yixian team ) is revealed. the sound condition of transmissibility fault and feeding water source, which are imperative in formation of the low - medium temperature geothermal system of convective type, is possessed in pingzhuang basin
通過對平莊盆地基礎地質資料、國內外大量地熱地質資料的分析和野外地質調查、礦井實測地溫以及上升泉、斷層涌水的地球化學分析等工作基礎上,指出地處低地溫梯度背景區的平莊盆地地溫梯度異常是由於盆地基底隆起和坳陷引起傳導型大地熱流再分配所致;運用州sys數值模擬了大地熱流向地表傳導背景下的盆地地溫場,從而揭示了盆地基底(義縣組)頂界面地溫分佈特徵;闡明了盆地具有形成中低溫對流型地熱系統所必需的導水斷裂、補給水源等的良好條件,中低溫對流型地熱系統是地熱勘查的主要對象;圈定了平莊盆地北部朝陽溝?駱駝營子地熱勘查遠景區。Construction of a 1000m plus deep shaft in a high temperature and heavy water flow environment
大涌水高溫條件下千米深井的施工實踐Nerval network forecasting method and application of mine water - discharge amount based on matlab
的礦井涌水量神經網路預測方法及應用From studies of these characteristics of structures, palaeontology, drilling, well logging, seismic profile, salt chemistry and lacustrine sedimentary system, it is recognized that the new characteristics occur in of section pukou and in huaiyiri sag, and the huge thickness of salt rocks is formed by the crust salt materials upwelling along deep fracture in the form of hot bittern and entering lacustrine basin in this area
通過該區構造、古生物、鉆井、測井、地震、鹽巖化學及湖盆內沉積體系等特徵的研究,認為淮陰凹陷浦口組二段和三段的沉積構造有其特殊性,巨厚的鹽巖層是殼深部鹽類物質沿深大斷裂上涌以熱鹵水形式進入湖盆的結果。Experiences to reduce construction preparation period of mine shaft sinking
使井筒涌水量降至The theoretic calculating method of the maximum and the minimum water level in the differential surge tank has been derived firstly. also the explicit method of calculating surges in the differential surge tank has been deduced firstly by use of thaler series expansion. the calculating method of section of the well and the effective impedance hole in the surge tank has been gived
根據差動式調壓室的基本微分方程,首次推導出了差動式調壓室涌浪幅值的理論計算公式;並同樣利用泰勒級數展開方法推導出了差動式調壓室水位波動的顯式計算式;導出了差動式調壓室大井面積和有效阻抗孔面積的計算方法。Based on euclidean distance, applied in water detection by electrical sounding, the gradient k method can estimate the location of the well and its flowing yield with measured data, and can obtain satisfactory geologic results
摘要梯度k法以歐氏距離公式為基礎,應用於電測深找水,它能夠利用實測數據較準確地確定最佳井位和估計涌水量,並獲得較佳的地質效果。A research over treatment of gushing water in geleshan tunnel
7號斜井涌水地段注漿整治技術Water requirement forecast for rice from well irrigation on the basis of time series analysis method
基於井灌區管道輸水系統的波涌灌技術Prediction of quaternary aquifer water inflow in mine shaft of liliangdian
李糧店第四系井筒涌水量預測Water in the uppermost " hole " or upper - most section of the ditch is meant exclusively for drinking ; the next lower section is where people wash rice and vegetables for cooking ; and washing of clothes is allowed only in the lower - most section of the ditch
他們用水十分講究,名為三眼井,即泉水噴涌的第一眼井供飲用下流第二眼井為洗菜再下流第三眼井方可用以洗衣服,嚴格分開,不準亂用。S2 well water gushing mechanism analysis in qingyuhe water - head site, sanyuan
2井涌水機理分析Grey interaction analysis of mine inflow growth of meiyukou mine
煤峪口礦礦井涌水量的灰色關聯分析Technical norms for prediction of mine water quantity with numerical methods
數值法預測礦井涌水量技術規范Study of multifractal singularity in mine discharge ' s time series
礦井涌水量時間序列多重分形的局部奇異性研究" tree planting for the public " will be organised from 10 am to 4 pm at shui tseng wan on lantau island on march 18, pak tam chung in sai kung on march 25 and shek lung kung in tai lam on april 1
公眾植樹活動將於三個地點舉行,分別是三月十八日在大嶼山水井灣、三月二十五日在西貢北潭涌和四月一日在大欖石龍拱,時間由上午十時至下午四時。For three days the water in the village wells rose and fell, rose and fell
這三天,這個村莊的井裡面的水,上涌下落。上涌下落。And she felt her reason would give way, or she would die. she fled as much as possible to the wood. one afternoon, as she sat brooding, watching the water bubbling coldly in john s well, the keeper had strode up to her
她盡可能地常常逃到樹林里去,一天下午,當她坐在約翰井旁邊,思索著,望著泉水冷清地沸涌的時候,守獵人突然出現在她的旁邊。Rescue workers are still working against time to search for the 181 miners trapped at two collieries in east china ' s shandong province since friday, despite dimming hopes of their survival five days after a swollen river flooded the pits
早中國東部的山東省從星期五以來,雖然洶涌的洪水進入了礦井五天礦工們的生還的希望以很渺茫,救援的工人們仍在夜以繼日的尋找被困在兩個礦井中的181名礦工。分享友人