涵洞 的英文怎麼說

中文拼音 [hándòng]
涵洞 英文
culvert; ponceau
  • : Ⅰ動 (包含; 包容) contain Ⅱ名詞(涵洞) culvert
  • : Ⅰ名詞(物體上穿通的或凹入較深的部分; 窟窿; 洞穴) hole; cavity Ⅱ形容詞(深遠; 透徹) profound; thorough; clear
  1. They ran for the culvert and ducked in.

    他們跑到涵洞跟前,鉆了過去。
  2. After days of hard work, the culvert was at last completed.

    經過幾天的苦戰,總算把涵洞修好了。
  3. Standard specification for corrugated aluminum box culverts

    波紋鋁箱形涵洞標準規范
  4. Frost heaving analysis of corrugated pipe culvert without foundation in permafrost region

    多年凍土地區無基波紋管涵洞凍脹分析
  5. Standard practice for least cost life cycle analysis of concrete culvert, storm sewer, and sanitary sewer systems

    混凝土涵洞,雨水溝,排污溝系統的最低成本
  6. Standard practice for life - cycle cost analysis of corrugated metal pipe used for culverts, storm sewers, and other buried conduits

    涵洞雨水管道和其它地下管道用波紋形金屬管壽命周期成本分析的標準實施規范
  7. Standard practice for structural design of corrugated aluminum pipe, pipe - arches, and arches for culverts, storm sewers, and other buried conduits

    涵洞排水和其它地下管道用波紋鋁管管拱和拱結構設計的標準實施規程
  8. Standard specification for precast reinforced concrete box sections for culverts, storm drains, and sewers

    涵洞雨水管和污水管道用預制鋼筋混凝土箱形斷面的標準規范
  9. Standard specification for precast reinforced concrete box sections for culverts, storm drains, and sewers metric

    涵洞雨水管和污水管道用預制鋼筋混凝土箱形斷面的標準規范
  10. Too much embankment of filled soil will result the destroy of road surface or instability of high - stack soil ; soil pressure at the top of culvert is the key parameter of culvert structure design, more or less of the parameter will result in economic waste or failure of structure

    堤頂沉降過大,輕者破壞路面,重者路堤失穩,涵洞頂部土壓力是涵洞結構設計的控制指標,計算過大導致經濟浪費,過小導致涵洞開裂,影響其使用壽命。
  11. Through discussion of numerical solution, the author get the effect of height of filled soil, size of culvert, width of valley, property of filled soil, construction procedure and techniques on soil stress of the culvert top ; 3. through the centrifuge test, the paper validates the reliability of numerical calculating on high - stack soil ; 4. the paper puts forward the simplified calculating method of soil stress of the culvert top on the foundation of numerical simulating and centrifuge modeling

    通過對數值解的討論,得到填土高度,涵洞截面尺寸,溝谷底部寬度,溝壁坡角,填築體性狀,施工速度,地下水對豎向位移場及涵洞頂部土壓力的影響情況; 3通過離心機的模擬試驗,驗證了數值計算對高路堤的計算結果的可靠性; 4在數值模擬和室內離心機模型試驗的基礎上,提出了高填方涵洞頂部土壓力簡化計算方法。
  12. Culvert under high - stack soil is a ubiquitous phenomena in road constructions in mountain, self - compression of high - stack soil can not be ignored, soil pressure at the top of culvert is affected by many factors, including the height of high - stack soil, section size of culvert, width of the bottom of valley, grade of valley, property of filled soil, construction procedure and techniques

    高路堤下埋設涵洞是山區公路建設的一種較為普遍的現象,高路堤自身壓縮較大,不可忽視,涵洞頂部土壓力的大小又受很多因素的影響,包括填土高度,涵洞截面尺寸,溝谷底部寬度,溝壁坡角,填築體性狀,施工工序與工藝等。
  13. A sewer or drain crossing under a road or embankment

    涵洞橫在公路或堤岸下面的下水道或排水管
  14. Using uprising method to raise tunnel with reinforced concrete cover

    用頂升法抬高鋼筋混凝土蓋板涵洞
  15. Application of beam supporting method for push launching of railway culvert

    抬梁法在鐵路涵洞頂進加固中的應用
  16. Corrugated steel culvert

    波紋鋼管涵洞
  17. Hydraulic structures - part 1 : crossing works, culvert works and drain works

    水工建築結構.第1部分.交叉結構工程涵洞工程和排水
  18. Study on arch action and earth pressure theory for culverts under high embankment

    山區公路高填方涵洞的成拱效應及土壓力計算理論研究
  19. The collapsible loess is often met during the construction of the high - grade highway in the loess area, and the main failure is the uneven subsidence of the roadbed and the culvert, which affects the safe usage of the roadbed and the culvert, etc. directed against this, based on the chankou - lanzhou freeway construction, the paper analyzes the application of the composite ground formed by lime - soil pile under the bridge and designs the project, discusses the rules of the contact pressure, the stress ratio of the pile and the soil, compares the p - s curves of one pile, the composite ground formed by one pile and the composite ground formed by two piles based on the in - situ plate loading test, evaluates the bearing capacity of the composite ground of the project

    黃土地區的高等級公路建設中經常遇到濕陷性黃土問題,其病害類型主要是地基土受水浸濕后引起路基、橋臺、涵洞等的不均勻沉降,直接影響路基、構造物等的正常使用。針對此問題,本文依託甘肅讒口至蘭州柳溝河高速公路建設工程,對橋基灰土樁復合地基應用的可行性進行了深入分析,根據具體工程進行了合理的設計與計算,並配合現場靜載荷試驗及壓力盒實測數據,探討了基底應力分佈規律,樁土應力比,變形模量的變化關系,對比分析了單樁、單樁復合和雙樁復合的p ? s關系,對橋基灰土樁復合地基承載力進行了整體評價。
  20. Based on the concrete engineering of the culvert under the embankment of the high - stacked soil in north second ring highway of guang zhou city, the paper researches the soil pressure distribution and change characteristic through on - the - spot arrangement of the test component

    本文依託廣州市北二環高速公路高填土路堤下涵洞的實體工程,通過現場布設測試元件測試,研究了其頂土壓力的分佈與變化特徵。
分享友人