深層鉆探 的英文怎麼說

中文拼音 [shēncéngzhēntàn]
深層鉆探 英文
deep prospecting
  • : Ⅰ形容詞1 (從上到下或從外到里的距離大) deep 2 (深奧) difficult; profound 3 (深刻; 深入) thor...
  • : i 量詞1 (用於重疊、積累的東西 如樓層、階層、地層) storey; tier; stratum 2 (用於可以分項分步的...
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  • : Ⅰ動詞1 (試圖發現) try to find out; explore; sound 2 (看望) call on; visit; see 3 (向前伸出)...
  • 深層 : deep (layer); deep (stratum)深層采水 [海洋學] deep-casting; 深層語法 deep grammar
  1. This study is a post - cruise study of this leg, calcareous nannofossil samples from sites 1146, 1147 and 1148 of leg 184 were analyzed to provide a high - resolution biostratigraphy for this leg and to investigate morphological variation of coccolith genus gephyrocapsa. the main results of this study are : 1. 12 late pliocene to pleistocene bio - events were recognized and 6 zones of martini ( 1971 ) were determined for the upper sediment sequences of sites 1146 and 1148

    本文作為大洋項目船下后續研究的一部分,對184航次中的1146站位和1147 、 1148站位的樣品進行了分析和研究,在船上科學家已經建立起的地框架的基礎上進一步加密采樣,對生物事件標志化石類別進行數量統計,進一步確定了12個生物事件在孔中的度,建立起了兩個站位的高解析度的鈣質超微化石生物地框架。
  2. Benthic foraminifer fauna, ams14c dating and acoustic sub - bottom profile was analyzed in the core ey02 - 2 and ey02 - 1 drilled from the muddy deposit in the middle southern yellow sea and the mid - shelf of north east china sea. considering the results of core qc2 ? dz4 and the standard oxygen isotope curves, we discussed the late - quaterenary paleo - environment evolution, benthic foraminifer fauna, paleo - climate, the climate events and water mass in postglacial period, average sedimentation rates, paleo - water depth, origin of sediments, average sea level rise rate in the shelf of south yellow sea and east china sea. at last we discussed the condition of sea level rise in the east china, green house effect and the protection of coastal zone

    本文根據南黃海中部泥質區和東海中陸架的兩個孔巖芯的古生物、 ams ~ ( 14 ) c測年、淺地剖面等,參考qc _ 2 、 dz _ 4成果及標準氧同位素曲線討了黃東海陸架晚第四紀古環境演化、底棲動物群特徵、古氣候、冰後期以來氣候事件、古水團、沉積速率、古水、沉積物源、海平面平均上升率,討論目前中國東部海平面上升的狀況、溫室效應及海岸帶保護。
  3. Based on 3 - d seismic well and logging data, mainly by means of advanced seismic theories of reservoirs prediction and other corelational multidisciplinary, an extensive and indepth studying on the tight sandstone reservoir with fracture of the second part of the xujiahe formation in west sichuan depression has been carried out. a series of theoretical viewpoints and research fruition are concluded as follows :. 1 on the basis of analysis of the regional and local structure characteristics and evolution, a conclusion comes in to being : inchoate and nowadays structure traps and the match model between structure and fracturation system are the main factors in controlling the formation of effective traps

    本文綜合利用三維地震、井、巖心、測井資料,採用地震儲預測方法為主線的多學科綜合研究思路對川西坳陷上三疊統須家河組二段緻密裂縫性砂巖儲進行了較為廣泛、入的研究和索,取得以下一系列理論認識和研究成果: 1 、通過區域及局部構造特徵及構造演化史分析,認為古今構造圈閉、構造與斷裂系統配置關系是控制有效圈閉形成的主要因素。
  4. On the basis of previous research works, new exploration wells, new appraisal wells and 3d seismic material are added to new research work in which rock and mineral, sedimentary facies and oil bearing characters are studied deeply by employing the methods of petroleum geology, sedimentary geology and reservoir geology. the results of reservoir prediction on fluvial sandbody in the upper of formation of guantao group obtained by using coherent analysis and acoustical impedance inversion bring good effect to the exploration and development of chengdao oilfield

    本文在以往工作的基礎上,補充新井、評價井和三維地震資料,運用石油地質學、沉積地質學、儲地質學等原理方法,對埕島油田主力含油系館上段地的巖礦、沉積相及油氣富集特徵進行了入的研究,對館上段河流相砂體進行了以測井約束地震反演為主的儲預測研究,研究成果為繼續開展埕島油田的勘開發提供了重要依據。
  5. Abstract : this paper describes the working principle of drillhole radar and recommends two working patterns : single - drillhole reflection and crosshole tomographic imaging. the technique was used to make lithologic evaluation of deep strata and detect geological anomalous bodies with obvious effects obtained

    文摘:闡述了孔雷達的工作原理,介紹了單孔反射和跨孔析成像2種工作方式,並將其用於部巖巖性評價和地質異常體測,效果顯著。
  6. With regard to its field drilling applications in the geologically loose sandy pebble layers, kl vegetable - gum drilling fluid showed itself with excellent rheological behaviours in its abilities of lubrication, lost circulation, suspension and removal of debris, anti - shear shinning, and high coring rates, which satisfactorily meet the demands of geological boring in the dam foundation of huangjin ping hydroelectrical power plant

    通過在黃金坪水電站壩基厚砂卵石覆蓋取芯的現場試驗,證明了kl植物膠沖洗液具有優良的流變特性,潤滑、堵漏、懸浮排除巖屑和抗剪切稀釋能力顯著,可實現高取芯率,能很好的滿足地質對取芯質量的要求。
  7. It is directed by the 1atest theory of terrain stickin plate tectonic, and based o n petrographical series and stratum layers. from the aspects of structural analysis, stratigraphy, petrology, sedimentology, structure geology, remote sensing geology, geophysics as well as tectonics, the author put the ordos basin into a bigger and deeper studying field while using the combination of sedimentation and structure analyses, the data of outcrops around the basin and the deep drilling coring data in the middle of this basin, geochemistry analysis, seismic methods and non - seismic methods, etc. this paper discussed the relationship between the crystalline basement and the suprastructure in and surrounding the ordos basin, and also the influences of deep geology on the basin platform cover, and some new point of view and better understanding have been brought forward on the basement growth of ordos basin and it ' s platform cover

    論文以板塊構造研究的最新地體拼貼理論為指導,以巖系、地為基礎,將沉積與構造分析相結合,並以地學、巖石學、沉積學、構造地質學、遙感地質學、地球物理學、大地構造學等多學科入手,在充分整理現有資料及前人研究的成果基礎上,利用盆地周緣野外露頭以及盆地中部分部取芯資料、地球化學分析資料、地震、非地震等資料將鄂爾多斯盆地置於一個更大的尺度,更的范疇,討論了鄂爾多斯盆地及其周緣地區結晶基底與淺構造之間的關系,討了部地質對盆地蓋的影響,以不與前人雷同的視角對鄂爾多斯盆地基底發育及其蓋中存在的問題提出了新的觀點和認識。
  8. The teaching skill, as its priority, has scientific feature, as its spirit, has artistic, and can be thought to the level reached by the teacher who has taken the theory on the education and the speciality as well as the relative as the guide to put a love, based on the exploration and creative work, into the course and students, to form a highly level of the teaching

    可以認為教學藝術是教師的教學所達到的一種境界,是教師本人以教育教學理論、學科專業理論及其他相關理論為基礎,結合自身教學實踐經驗和積累,並傾注了對教育事業、對學生熱愛的情感,經過不斷索、潛心研和創造性勞動而形成的,是高次的教學行為方式。
  9. The article introduces the basic concepts and common methods of fuzzy mathematics, initially discussing the applications of fuzzy mathematics in the following aspects : 1 ) division of " skidding " strata with grade of membership that are drilled with diamond bits ; 2 ) comprehensive evaluation on the application in evaluation of diamond bits, classification of rock drillability, and evaluation of clay ; 3 ) classification of " hard rock " through fuzzy clustering analysis ; 4 ) estimation of completion time of boreholes and evaluation of underg round water with fuzzy mathematics ; 5 ) identification of new ore areas and option of best water resource area with fuzzy model ; 6 ) option of diamond bits and evaluation on oil field development plan with fuzzy resemble option and the improved calculation method ; ? ) prediction of mud slurry performance and of the amount of surging water in ore pits with fuzzy control ; 8 ) comprehensive evaluation of diamond bits and supporting plan of deep foundation pit with fuzzy optimal theory

    初步討了以下幾方面的應用: 1 )用隸屬度劃分金剛石進「打滑」地; 2 )綜合評判在金剛石頭評價、巖石可性分級及造漿粘土評價中的應用; 3 )用模糊聚類分析進行「硬巖石」分類; 4 )用模糊數進行孔竣工時間預估及地下水質評價; 5 )模糊模式識別在新礦區類型識別和最佳水源地選擇中的應用; 6 )模糊相似選擇及其改進演算法在金剛石頭選擇和油田開發方案評價中的應用; 7 )模糊控制在泥漿性能和礦坑涌水量預測中的應用; 8 )優化理論模型在金剛石頭和基坑支護方案綜合評價中的應用。
  10. Abstract : aimed at the circumstances including deeper formation, wider wells " distance, few data in new exploratory zone and lower drilling success rate, etc., the paper discussed the drilling geological environmental factors such as seismic velocity and acoustic wave logging velocity, and put forward a set of technical methods including basical data treatment in deep exploratory wells, drilling optimal design and operations

    文摘:針對塔里木盆地沙雅隆起井眼、井距大的難點和新靶區井參考資料少、井設計盲目性大、井成井率低等問題,分析討了地震速度和聲波測井速度等井地質環境因素變化規律,提出了一套井基礎數據處理、井優化設計和優化施工的技術方法。
  11. This differ with computation modal that design the foundation pier very big, bearing power too than design increment ; usage mechanics numerical analysis device with limited a logarithm of timw fitting method logt, noted the rock strength in stake tip of the borehole cast - in - place concrete pile to proceed with the structure steadiness the simulation compute to study with the fixed amount, designing for the engineering to start construction to provide for science with the spot

    本研究結合現場試驗、力學數值分析和有限單元分析,對巖溶地段孔灌注樁的施工工藝、荷載傳遞機理、持力頂板厚度及嵌巖度等方面作一些討性研究,為該工程的設計和施工積累經驗,並為該類課題的進一步研究奠定了基礎。
  12. This article aims at the characteristics of a baibie harbor great bridge, by the spot construction test and mechanicses, limited an analysis, dissolve to the construction technics and loading capacity, stake deliver mechanism, bearing stratum and glazing rock depth area curve etc. s of the borehole cast - in - place concrete pile in the karst terrain do the some study research

    國內外對于巖溶地區孔灌注樁的研究,主要是針對具體工程的施工方案描述和施工故障及處理措施,對巖溶地段基樁的承載機理及承載力的綜合研究則未見報道。本文針對白墅港大橋的特點,通過現場施工試驗及力學、有限元分析,對巖溶地區孔灌注樁的施工工藝、荷載傳遞機理、持力厚度及嵌巖度等方面做一些討性研究。
  13. In this paper, the author synthetically applied continental lake basin high - resolution sequence stratigraphy, sedimentation, well logging, petroleum geology, mathematics geology, etc, on the basis of studying on the core of the well drilling in the district, fully utilize logging well, well drilling core and testing and analyzing materials, adopting well logging - sedimentary facies automatical identification to study the characters of sedimentary facies and sub - facies further. and study sedimentary facies profoundly, and carry on sedimentary facies contrast well to well, to study yanchang 3 sector and yanchang 4 + 5 sector lithofacies palaeogeography character and evolution further

    本文綜合應用陸相盆地高解析度序地學、沉積學、測井學、石油地質學、數學地質等理論,在對研究區內有關井巖芯觀察的基礎上,充分利用測井、井巖芯以及測試分析資料,並採用測井?沉積相自動識別等方法,入研究了沉積相、沉積微相特徵,並進行井間沉積相對比,進而討了長3 、長4 + 5期的巖相古地理特徵及其演化。
  14. On the basis of sedimentary facies division, the author firstly divided super short - term and short - time base - level cycle on well drilling cores, and playback the cores to well logging curves to scale them, and set up different classes of base - level cycles answered to well logging respond models. finally the author discussed how to use log well curve to divide super short - term and short - time base - level cycle characters, and to set up super short - term and short - term base - level cycle comparison framework, and analyzed sand body origin cause of formation type and spreading rules

    入的沉積相研究基礎上,對井巖芯進行了超短期?短期基準面旋迴劃分,將巖芯歸位,並對測井曲線進行刻度,建立了不同級次基準面旋迴的測井響應模型,進而應用測井曲線劃分低級次基準面旋迴,建立了超短?短期基準面旋迴地格架,討了砂體成因類型及展布規律。
  15. Nautilus has spent about $ 12m in the past year on exploration, and dr scott says one test drilling found deposits 19 metres deep

    鸚鵡螺公司在過去的一年中花費了1200萬美元在勘測上,斯科特博士說,有一次發現了19米的礦物
  16. Based on the successful application of mudlogging data analysis in evaluations of oil and gas beds, formation preessure and monitoring drilling engineering in the pushen well no. 1, one of the key - wells of the daqing oilfield, the authors explain the importance of this mudlogging technique in exploration of oil and gasp and emphasize the significance of the technique for the exploration projects of oil and gas of similar category

    摘要根據大慶油田重點預井葡1井錄井施工過程中綜合錄井資料在評價油氣、地壓力檢測和井工程監測等方面的成功應用,闡述了該技術目前在油氣勘中的重要作用,及對今後同類油氣勘項目建設的借鑒意義。
  17. Results mr - ml technology can be used to quickly and effectively evaluate petrophysics and the property of pore fluids, and compensate the low resolution of seismic data, command the drilling situation of reservoir and lower the exploration risk

    結果通過磁共振錄井技術可快速、有效地評價儲的物性及流體性質,從而彌補部儲由於地震資料解釋精度低、儲落實程度差的不足,對于及時把握儲情況、降低勘風險具有重要的意義。
  18. In this paper, depending on the enormous 356 pile testing date detailed with soil and pile parameters and p ~ s curves, covering xi ' an and adjacent areas, we analyzed the load transmission mechanism of pile in loess foundation, and proposed a kind of hyperbolic load transmission function between pile and it ' s neighboring soil. meanwhile, we created a mathematical model to predict p ~ s curve and bearing capacity of single pile. by analyzing the compacting effect caused by pile - sinking of pressed pile in loess and it ' s influence on bearing capacity and settlement, two parameters, kc and ke are introduced to modify the soil cohesive c and deformation modulus es

    本文利用現己收集到的西安及其周邊地區356根打入樁、靜壓樁、灌注樁的現場試樁資料(其中打入樁67根,靜壓樁121根,孔灌注樁168根,並有詳細的地資料,樁資料,荷載沉降?曲線)對西安黃土地基中的打入樁、靜壓樁、灌注樁的荷載傳遞機理進行了分析研究,認為用雙曲線型的荷載傳遞函數模擬樁土之間的荷載傳遞函數是合適的,並用荷載傳遞分析的方法建立了計算p s曲線的數學模型及極限承載力的確定方法。
  19. Which often produces some unexpected problems, such as prolonging time limit of project, increasing engineering quantities and cost, etc. through test on the site, dynamic value analysis, finite element unit method, the paper researchs construction technology of in - situ pile, transfer theory, thickness of supporting layer of head slab and depth of pile in karst area, provides some important conclusions, directs effectively the design and construction of this kind of projects

    但因溶洞的分佈規律性差,現有勘手段難於事先查明它的準確位置及大小,因而常常給施工帶來意想不到的問題:工期延長、工程量增加及工程費用增加等。本文通過現場試驗、理論計算和有限單元分析,對巖溶地區孔灌注樁的施工工藝、荷載傳遞機理、持力頂板厚度及嵌巖度等方面進行了較為系統的研究,得出了一些重要結論,有效地指導了該類工程的設計和施工。