深海淤泥 的英文怎麼說

中文拼音 [shēnhǎi]
深海淤泥 英文
abyssal ooze
  • : Ⅰ形容詞1 (從上到下或從外到里的距離大) deep 2 (深奧) difficult; profound 3 (深刻; 深入) thor...
  • : Ⅰ動詞1 (淤積) become silted up 2 (血液不流通) (of blood) stagnateⅡ名詞(淤積的泥沙) silt Ⅲ...
  • : 泥名詞1 (含水的半固體狀的土) mud; mire 2 (像泥的東西) any paste like matter; mashed vegetable...
  • 深海 : abysmal sea; abyssal sea; deep sea深海捕撈 deep sea fishing; 深海捕魚 deep sea fishing; 深海采礦 ...
  • 淤泥 : sludge; ooze; slush; mire淤泥層 mud; 淤泥沉積 siltation; 淤泥沉積物 mud deposit
  1. Multispectral data for bathymetry is often performed in relatively clear shallow waters, up to now, no one use multispectral data for bathymetry in estuary waters of yellow river, where the highest sediment concentration in the world has been observed. in another part of this thesis, multispectral data acquired by landsat - 5 tm and in situ data are used for bathymetry in estuarine waters of yellow river. statistical models based on one band and two bands of tm respectively are developed

    利用兩期水的比對可以揭示黃河水下三角洲的沖演變規律,但由於實測水資料獲取較為困難,因而利用遙感來反演水是一個重要的選擇,為此,本文在黃河口現代黃河三角洲沖演變規律與遙感應用研究端走取兩個試驗區進行了多光譜遙感水反演試驗,試驗結果表明,在極高沙濃度、較強水動力條件的黃河口域,用多光譜遙感反演水是可行的。
  2. As the increase of domestic high - rise buildings, more and more deep foundation trench supporting constructions have come into existence. among the general geographical condition of the urban district in qingdao, most of regions, which mainly consist of strong de composed rocks, are in quite good condition. except for the sandy soil and oozy soil along sea sides. but the development of rock cracks and breaking zones and unstable lamprophyre still exist, so blasting is needed during constructions of foundation trench. blasting have bad influence on the stability of slopes. moreover. the slope - liding has happened for several times, so the engineering project of foundation trench attracts more attention of people

    隨著國內高層建築的發展,基坑支護工程越來越多,綜合青島市區的地質狀況,除邊有砂性土及軟土外,大部分地域巖土條件相對較好,多以強風化巖為主,但巖石裂隙發育,間或有斷裂帶和穩定性極差的煌斑巖穿插其中,基坑施工時需要爆破施工,對邊坡的穩定造成了不利影響,加之連續出現的幾次滑坡失穩事件,基坑支護工程越來越引起了各方面的重視。
  3. On the assumption that swc piling works will be carried out by drilling rigs mounted on barges with suitable mitigation such as silt curtains, the construction of the bridge will not cause any non - compliance with water quality objectives for deep bay ; and

    假設港西部通道的打樁工程將以裝于躉船的挖鉆機進行,並輔以適當的緩解措施,如設置網,興建大橋將不會導致水質不符合后灣水質指標的情況;及
  4. At present, many fields remain to further research, especially the profound combination of gis technique with ece ( estuarine and coastal engineering ), which should be developed for the purposes as follows : ( 1 ) to serve the huge comprehensive work in changeable natural conditions and difficult construction conditions which takes a long period and covers a large region, e. g. the regulation work of deepwater channel in the yre ( yangtze river estuary ) ( 2 ) to combine the gis with applied numerical model ( 3 ) to study the hydrodynamic processes and characteristics of waves, tidal currents and sediment transport, as well as the affection carried by the regulation work in an estuary ( 4 ) to monitor and to analyze ees ( evolution of erosion and sedimentation ) and the variation of riverbed ( 5 ) to play a role of dynamic supervising of a engineering project

    目前尚有許多有待進一步研究的領域,尤其是以服務于長江口水航道治理這樣規模大、周期長、影響區域廣、自然條件復雜、施工情況多變的國家重點工程為目的,將gis與專業應用數學模型結合,對河口岸波浪、潮流、沙運動的動力機制,以及整治工程建築物對其影響的研究,對入航道沖和河勢演變的監測分析,對施工進展和工程效果實現「動態」監控和管理,尚缺乏同gis技術的入有效結合。
  5. That put it in deeper water ( around 20 meters ) and above a seabed that consisted of 20 meters of soft alluvial silt and mud deposits

    將它放到更的水裡( 20米左右)並且在床上包括20米的軟的和沉積。
分享友人