深鉆孔 的英文怎麼說

中文拼音 [shēnzhēnkǒng]
深鉆孔 英文
deep drillhole
  • : Ⅰ形容詞1 (從上到下或從外到里的距離大) deep 2 (深奧) difficult; profound 3 (深刻; 深入) thor...
  • : 鉆Ⅰ名詞1. (打眼用的工具) drill; auger 2. (指鉆石) diamond; jewel Ⅱ動詞(用尖物在另一物體上轉動) drill; bore
  1. Construction technique of deep - drill of outburst coal seam

    突出煤層深鉆孔施工技術
  2. This study is a post - cruise study of this leg, calcareous nannofossil samples from sites 1146, 1147 and 1148 of leg 184 were analyzed to provide a high - resolution biostratigraphy for this leg and to investigate morphological variation of coccolith genus gephyrocapsa. the main results of this study are : 1. 12 late pliocene to pleistocene bio - events were recognized and 6 zones of martini ( 1971 ) were determined for the upper sediment sequences of sites 1146 and 1148

    本文作為大洋探項目船下后續研究的一部分,對184航次中的1146站位和1147 、 1148站位的樣品進行了分析和研究,在船上科學家已經建立起的地層框架的基礎上進一步加密采樣,對生物事件標志化石類別進行數量統計,進一步確定了12個生物事件在中的度,建立起了兩個站位的高解析度的鈣質超微化石生物地層框架。
  3. Benthic foraminifer fauna, ams14c dating and acoustic sub - bottom profile was analyzed in the core ey02 - 2 and ey02 - 1 drilled from the muddy deposit in the middle southern yellow sea and the mid - shelf of north east china sea. considering the results of core qc2 ? dz4 and the standard oxygen isotope curves, we discussed the late - quaterenary paleo - environment evolution, benthic foraminifer fauna, paleo - climate, the climate events and water mass in postglacial period, average sedimentation rates, paleo - water depth, origin of sediments, average sea level rise rate in the shelf of south yellow sea and east china sea. at last we discussed the condition of sea level rise in the east china, green house effect and the protection of coastal zone

    本文根據南黃海中部泥質區和東海中陸架的兩個巖芯的古生物、 ams ~ ( 14 ) c測年、淺地層剖面等,參考qc _ 2 、 dz _ 4成果及標準氧同位素曲線探討了黃東海陸架晚第四紀古環境演化、底棲動物群特徵、古氣候、冰後期以來氣候事件、古水團、沉積速率、古水、沉積物源、海平面平均上升率,討論目前中國東部海平面上升的狀況、溫室效應及海岸帶保護。
  4. The investigation of a lot of parameters about treated sandstone, brick materials and earthen materials with fluorited polymers has been carried out, such as the formation of polymer, the penetration depth, porosity, capillary absorption and penetration coefficient, water uptake, compressive strength, drilling resistance, absorption isotherms of water vapor, water vapor diffusion, color changes as well as resistance to desegregation of water, frizzing - throwing cycles, worming - cooling cycles, and so on. in addition, the influence of salt crystallization, acid and base, and uv aging have also been assessed in order to better understand the protection effects and utilization possibility of two fluorinated polymers, mainly according to astm standard and the combination of international methods together with general technological

    分別以國家級文物保護單位的土質、砂巖和磚材文物樣品為對象,依據astm標準及國際通用文物保護研究方法與評估準則相結合,通過膠化物形成周期、滲透度、隙度、毛細吸水和滲透系數、持水量、抗壓強度、抗強度、吸附水蒸氣的能力、透氣性、外觀顏色等系列參數的測定,及凍融、冷熱循環、酸堿腐蝕后抗壓強度的衰減、可溶鹽對保護效果的影響、酸堿及光照對表面保護效果的影響,對兩種含氟聚合物及其與有機硅的共混物在文物加固保護和表面防護中的可行性和保護效果給予了系統研究。
  5. Qz - 65. 90c multifunctional pneumatic drill

    最大
  6. Rotatory boring cast - in - place pile

    基礎回轉灌注樁
  7. Then the article analyses the effecting elements about the economic result of blasting and puts forward some improving measures, and summarizes optimizing model on economic result of blasting both internal and overseas bearing upon. the theory is based on the blasting cost model, which proposed by dr. zhong hanrong. combining with the specialties of water and electricity engineering, starting off through blasting result, it emphasizing considers drilling cost, deep hole bench blasting cost, reblasting cost, and the cost of bottom fleet hole blasting that in mixed loading emulsion explosive blasting

    本文在加拿大鐘漢榮博士提出的爆破成本模型基礎上,結合水電工程的特點,從爆破效果出發,著重考慮了應用混裝乳化炸藥爆破的成本、梯段爆破成本、二次爆破成本和爆破后根底淺爆破成本,以塊度、振動、安全為約束條件,以這四項成本最小為目標函數,廣泛收集各種爆破經濟技術條件,建立了爆破優化經濟數學模型。
  8. The study of the long bored cast - in - situ pile construction in huanghe overflow area

    黃河漫灘區灌注樁施工探討
  9. Abstract : this paper describes the working principle of drillhole radar and recommends two working patterns : single - drillhole reflection and crosshole tomographic imaging. the technique was used to make lithologic evaluation of deep strata and detect geological anomalous bodies with obvious effects obtained

    文摘:闡述了雷達的工作原理,介紹了單反射和跨層析成像2種工作方式,並將其用於部巖層巖性評價和地質異常體探測,效果顯著。
  10. Hole diameter drilling capacity

    直徑度:
  11. Core drill drilling capacity

    度:
  12. Based on the construction of large diameter pile foundations at deep water riverbed without overburden for the shengmi bridge in nanchang, the construction difficulties and construction control key points involved in the method for bored pile construction with floating gantry are described

    摘要通過對南昌生米大橋水無覆蓋層大徑樁基施工實踐,介紹浮式龍門樁施工方法中的施工難點和控制重點。
  13. Our factory has full production facilities, which are used on glass cutting, polishing, printing, hole making and sandblasting. we are willing to build up our abilities to develop more new products line according to different market demand

    本廠生產設備全,可進行玻璃切割磨邊印刷打砂等加工,及擁有因應市場需要而開發新產品之能力。
  14. Ground coupled heat pump system two vertical and two inclined bore holes 32 metres into the earth capture underground heat and provide cooling or heating

    地源熱泵系統由兩個垂直和兩個傾斜的32米深鉆孔及埋管組成,利用地下蓄熱的特性提供熱源或冷源。
  15. Trailed tree deep planting earth auger

    牽引式栽造林
  16. The same type of cement - soil mixing pile with concrete core, concrete pile and cement - soil pile that means they have the same pile length and pile diameter is deeply analyzed by finite element program. we get the q - s curve, the axis force of pile body curve, the stress of pile curve and the side and the end sharing load ratio of the pile curve by finite element program. with the help of the finite element program, the paper finds the relations between the pile ' s parameter and its bearing capacity and load transferring properties

    利用有限元計算分析了同比(樁長相同、樁徑相同)水泥土組合樁、水泥土攪拌樁和混凝土灌注樁,得到了它們的荷載沉降曲線、樁身應力曲線、樁身軸力曲線、樁側樁端分擔荷載曲線等,通過這些曲線對它們的荷載傳遞規律以及變形特性進行了入的分析。
  17. Since the pebble structure is of big pellet easy to be permeated ant it is difficult to smash and drill, the appliance with big diameter and deep cast - in - place pile has been greatly restricted

    卵石地基具有顆粒大、透水性強、進尺和破碎困難、容易垮等困難,限制了大直徑灌注樁在其中的應用。
  18. The latest constructing machine and the newest technology were adopted to ensure that the borehole is perpendicular to the rock face of roof and that the depth of borehole and the torsional moment of the anchoring bolt meet the design requirement

    採用最新錨桿施工機具及工藝,保證垂直於頂板巖面,及錨桿扭矩滿足新型機械錨桿的設計要求。
  19. Considering the engineering of trail pile in hubei jingzhou yangtze river highway bridge, the construction process of deep cast - in - place pile under pebble geological structure, the limit load - bearing capacity of single pile, side friction stress and head drag are researched in this thesis deeply

    論文結合湖北省荊州長江公路大橋的試驗樁工程,入研究了江漢平原地區卵石地基深鉆孔灌注樁的施工工藝、單樁極限承載能力、樁側摩阻力和端阻力。
  20. Drilling, gun - drilling, turning, milling of hardened steel, white cast iron, non - iron metals, plastics an synthetics. high wear resistance and edge durability and good toughness properties

    對硬鋼、白鑄鐵、非鐵金屬、塑料、合成材料等進行深鉆孔、車削、銑削等加工的牌號。具有高的耐磨性、切面穩定性和好的韌性。
分享友人