混流工水輪機 的英文怎麼說

中文拼音 [húnliúgōngshuǐlún]
混流工水輪機 英文
francis turbine
  • : 混形容詞1. (渾濁) muddy; turbid2. (糊塗; 不明事理) foolish; stupid
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : Ⅰ名詞1 (工人和工人階級) worker; workman; the working class 2 (工作; 生產勞動) work; labour 3 ...
  • : 名詞1 (由兩個氫原子和一個氧原子結合而成的液體) water 2 (河流) river 3 (指江、河、湖、海、洋...
  • : Ⅰ名1 (輪子) wheel 2 (像輪子的東西) wheel like object; ring; disc 3 (輪船) steamer; steamboa...
  • : machineengine
  • 輪機 : turbine
  1. Washed air purifier working principle : siphon and using centrifugal principle will be mixed in water pure plant essential oils inhaled through its siphon principle the motor base coaxial centrifugal turbines in the bottom of straw through exchanges cover a very high - speed rotary motor, reuse centrifugal principle, will be mixed in water pure plant essential oil spray bottle in the form within a water film bile, the dust in the air and inhaled bacteria in water purification at the same time after the indoor air insufflation, quickly and efficiently by removing indoor toxin biological, dust, cigarette smoke, the smell, virus

    洗空氣清新作原理:是利用虹吸以及離心原理;將合於的純植物精油通過虹吸原理吸入其電底座的同軸離心渦下部的吸管中,通過交罩極電高速旋轉,再利用離心原理,將合於的純植物精油噴在瓶膽內形成一層膜,將空氣中的灰塵以及細菌吸入中,同時將經過凈化的空氣吹入室內,快速有效地去除室內的有毒素生物、灰塵、煙味、臭味、病毒等。
  2. The transient cfd simulation including the spiral case, stay vane, guide vane, runner vane and draft tube at different operation points is studied fitly, then the result of the pressure distribution on runner blade is provided for the runner transient structural simulation by fluid - structure interaction ( fsi ) method

    文中首先對高頭小負荷的渦帶況下場進行非定常cfd計算,得到渦帶況下葉片表面不同時刻的壓力載荷,並利用固耦合方法對轉進行結構場瞬態特性計算,分析轉葉片的動應力特性。
  3. Technological guide for erection and welding of split runner of francis turbine

    分瓣轉組裝焊接.藝導則
  4. Abstract : a brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    文摘:介紹三峽程的科研項目,綜述三峽程開以來的主要科研成果及程應用情況,包括:一期土石圍堰基礎處理與施技術;大江截上下游土石圍堰平拋墊底研究;二期圍堰防滲程研究;大江截計算科學管理;大壩凝土澆築方案及主要施械選型;凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及力學、高邊坡穩定、凝土襯砌墻的結構與支護研究;特大型發電組的科學研究。
  5. A brief introduction to scientific research in the three gorges project ( tgp ) and the applications of research achievements is given, which include treatment of newly slited layer on the foundation of the first stage earth - rock cofferdam, dumping bottom technique of river closure in deep water, construction of cut - off walls in the second stage earth - rock cofferdams, 3 - d computer simulation of river closure, concrete casting alternatives and selection of major construction equipment for the second stage construction optimization of durability of raw materials of concrete, deep sliding resistance and stability of the intake dam section, the section of the intake of the power station, the intake penstock of the power station, layout and hydraulics problems of shiplocks, stability of high slopes of shiplocks, and optimization of the system structural anchor bars to reduce the risk of cracking in the concrete wall and 700mw turbine generator units

    介紹三峽程的科研項目,綜述三峽程開以來的主要科研成果及程應用情況,包括:一期土石圍堰基礎處理與施技術;大江截上下游土石圍堰平拋墊底研究;二期圍堰防滲程研究;大江截計算科學管理;大壩凝土澆築方案及主要施械選型;凝土的原材料和耐久性優化試驗研究;大壩基礎深層抗滑穩定研究;三峽電站進口型式研究;鋼襯鋼筋凝土引管道研究;蝸殼打壓、廠壩間伸縮節問題研究;永久船閘的引航道布置、輸系統及力學、高邊坡穩定、凝土襯砌墻的結構與支護研究;特大型發電組的科學研究。
  6. The development of the dynamic test - bed for fluid flow machine, one of the sub - projects within the " national 211 project ", can carry out the tests on the static and dynamic properties of not only both the hydraulic turbine units and water pump flits with the types of axial - flow, mixed - flow and inclined - flow, but also the centrifugal pump unit ; of which the testing process is automatically controlled by a pc with higher testing precision

    摘要械動態試驗臺是國家「 211程」建設項目之一,可以進行軸式(貫式) 、式、斜組的靜特性、動特性試驗,也可以進行軸式(貫式) 、式、斜式、離心式組的靜特性、動特性試驗,試驗過程由微型計算自動控制,試驗精度高,操作方便、靈活。
  7. The consequence of computation indicated above method not only can approach turbine blade surface accurately but also can be provided for extend and intersection while the precision can be controlled. it realized anticipated goals of the application of turbine blade and engineering exercises. thus, it provide the foundation to the reconstruct and optimize design of turbine blade as well as the cam of turbine blade

    算例結果表明,上述方法不僅可精確擬合式、軸葉片,而且還能對葉片進行求交、延展運算並控制精度,實現了nurbs曲面造型技術應用於葉片設計和程實際的預期目標,為葉片的改型設計和優化設計、葉片的計算輔助製造打下了基礎。
  8. In this paper, at first the cfd simulation including the spiral case, stay vane, guide vane, runner vane and draft tube at different operation points is studied, then the result of the pressure distribution on runner blade is provided for the runner structural simulation by fluid - structure interaction ( fsi ) method

    本文首先對道內場進行了多況的cfd計算,得到不同況下轉葉片表面壓力載荷,並利用順序固耦合方法對轉在各種況下的應力特性進行計算。
  9. Through the study on the large francis turbine parameters selection, it gives a definite instruction in runner parameters alternative selection with the same head, and also practices an important role for laxiwa turbine calling for bid

    通過對大型參數選擇的研究,對同頭段的轉參數選擇比較具有一定的指導意義,同時對拉西瓦在招標設計作中具有重要的實際意義。
分享友人