清算價格 的英文怎麼說

中文拼音 [qīngsuànjià]
清算價格 英文
clearing price
  • : Ⅰ形容詞1 (純凈) unmixed; clear 2 (寂靜) quiet 3 (清楚) distinct; clarified 4 (一點不留) w...
  • : Ⅰ動詞1 (計算數目) calculate; reckon; compute; figure 2 (計算進去) include; count 3 (謀劃;計...
  • : 名詞1. (價格) price 2. (價值) value 3. [化學] (化合價) valence
  • : 格象聲詞rattle; gurgle
  • 清算 : 1. (徹底地計算) clear (accounts); square; audit 2. (列舉全部罪惡並做出處理) settle accounts; expose and criticize
  • 價格 : price; tariff
  1. Discussions on the liquidation price of real property

    房地產清算價格評估探析
  2. The computer then find the infornation about this prodouct ( price, inventory data ) and sends it instandtly backe to the terminal at the checkout counter. at the same time, it keeps an inventory for the store manager. many products have labels with these stripes

    機就能找出有關的商品的信息(、存貨等資料)並立即把信息送回到受款臺的終端,同時它也是為商店經理留一份存貨單,許多產品的標簽已標有這種條紋。
  3. The real estate development cost control methods are specified of decision, design, execution stage to reduce the construction cost, and it is compiling feasibility study report and capital invest estimation in decision, optimizing the design scheme and designed rationally in the technique and construction drawing design stage, electing rational construction scheme in construction stage, controlling the change in the work and field visas strictly, examining and approving budge detailed, budge planning use the quantities list, electing the best subcontractor, preventing some monopoly raise the price, collecting the detailed data in the fieldwork, making strict bargain

    討論了房地產開發項目的決策階段、設計階段、實施階段分別需要採取的相關措施和方法,以盡量降低項目的工程造,即在決策階段編寫詳細的可行性研究報告和編制投資估;在設計階段優化設計方案,進行合理的技術設計和施工圖設計;在實施階段選擇合理的施工方案,嚴控制工程變更和現場簽證,嚴審核工程施工圖預,工程造的預採用工程量單報,擇優確定專業分包單位,防止少數壟斷性行業任意抬,深入現場,收集和掌握施工有關資料,制定嚴密的合同條款。
  4. Second, by analyzing the domestic project cost form, we can find there are some problems throughout the inviting public bidding and the bid, in the aspects of the cost form. with the rapid development of the economy, the traditional budget ration holds back the competition and limits the positivist and creativity of the producer and the operator. at last, by analyzing the inter national project cost form and according to the project cost rule in our country, we must accord with the international conventions, introduce the principle and means of fixing a price of a foreign project and establish the calculating rule of the project quantity

    其次,本文通過對國內工程造的構成進行分析得出,本文對工程造構成中的人工費、材料費、機械臺班費的計,體現與市場機制一致,按照市場,改變以往工程造的計取方式;同時改變定額? ?只考慮各分項工程中所消耗的人工、材料、機械臺班的數量標準,不考慮人工、材料、機械臺班的(這個應按市,不是一定時期內固定不變的) ;改變取費方式;改變工程造在招標投標中對評標的確定方式,應採取工程量單報方式。
  5. The author considers as follows : ( 1 ) we should understand how to define the price of architecture products the cost of engineering and the price of engineering, we should compare the connotations of plan price, float price and market price, we should clarify how engineering cost and architecture installation engineering cost are formed and what is the difference between balance price and final accounts price ; ( 2 ) through analyzing and comparing the account bases and composing contents of enterprise individual production cost and social average production cost, analyzing from the design mechanism ' s function of auction and bid and the purpose of actualizing auction and bid, we can confirm that the foundation that the titles are weeded when judged is enterprise individual production cost, not social average production cost ; ( 3 ) the author considers there is diverge between shop drawing budget based on ration and auction and bid, carrying out bill quantity of construction works can advance the formation of cons truction - product market price, also is the outset and integrant route to close international, but though code of valuation with bill quantity of construction works has a lot of advantage to advance the form of architecture market price, we also see it has lack and it should be amended

    針對以上問題,筆者認為:應該了解建築產品與工程造、工程是如何界定的、比較建築產品的計劃、浮動與市場的含義,搞楚工程造的構成和建築安裝工程費用的構成以及竣工結與決的區別;通過分析、比較建築產品的「社會平均生產成本」和「企業個別生產成本」的計依據和構成內容,從招標投標的設計機制的功能和實施招投標的目的來分析,確認在評標中剔除低於成本標書的依據是投標企業的個別生產成本,而不是社會平均生產成本;筆者認為以定額為計依據的施工圖預方法與招標投標之間存在悖論,工程量單計的推行是對建築產品市場形成改革的推進,也是建築產品形成方式與國際接軌的開端與必經之路,但是也必須認識到雖然《建設工程工程量單計規范》具有推進建築市場形成的諸多優勢,但仍存在不足與需要完善的地方。
  6. Private companies positioning their books and financial statements for an ipo also become keenly aware that the ipo price of their stock is generally derived from a multiple of its reported earnings

    非上市公司為了首次公開募股公開財務結和帳薄,還應該十分楚地認識到,公司股票第一次募集的基本上取決于對它所報告的收入的綜合分析。
  7. For example, the administratively monopolized access regulation that caused the upper section ( railway network operation ) and lower section ( the transportation businesses ) integrated ; the relatively closed investment mechanism that at first mainly depended on government allocation, then mainly relied on railway ' s building fund ; the price regulation that controls the right of price setting strictly and keeps a low price level for a long time ; the income distribution regulation that with its income and expense carried out in two separate ways ; finally, the regulation framework that with the roles wrongly arranged and with inadequate supervision and lagged legislation

    由此可以看出,我國鐵路規制體制的計劃經濟痕跡非常明顯:在進入上,實行「上下一體」的行政性壟斷;在投資上,實行先以國家為主而後以鐵路建設基金為主的相對封閉的投資體制;在運上,國家嚴控制定權,並長期以來保持低位;在收益分配上,實行收支兩條線的制度;最後,在規制的組織架構方面,不僅角色錯位,而且缺乏監督,立法滯后。
  8. Currently, many problems are as follows : some people and engineers sometimes confuse or mistake so many conceptions and meanings of the price of construction product as to lead to troubles ; the cost of the construction product in the construction - auction - bid cannot be ascertained definitely ; the method of shop - drawing budget which is based on budget - ration cannot form effective market competition and market price of construction product. the management system of construction cost is not perfect

    目前建築產品形成中存在以下問題:有關主管部門和少數工程人員有時混淆建築產品相關概念及其內涵,產生諸多誤解,以致造成工作上的摩擦;對建築工程招標投標中建築產品成本內涵界定不晰;以預定額為依據的施工圖預方式難以形成有效的市場競爭以及形成建築產品的市場;當前未能形成完善的工程造管理體制。
  9. Furthermore, due to the influence of nforork loss, the market clearing price will differ from point to point by use of the new auction method, hence it can be used as a price signal to motivate siting of power plants in the long run

    此外,由於考慮了網損的影響,應用該方法時,各節點的清算價格有所不同,因此還可作為指導電廠選址的一個經濟信號。
  10. Railroad conveyance cost is the importance basis to investigate the economic performance, to proceed on profit and loss analysis, and to decide management decisions of railroad enterprise. railroad conveyance cost is still the important basis to formulate and adjust railroad conveyance price, to account labor clearing prices among enterprises

    鐵路運輸成本是考核鐵路企業經濟效益、進行盈虧分析、經營決策和投資決策的重要依據;鐵路運輸成本還是制定和調整鐵路運輸以及企業間勞動清算價格的重要依據。
  11. Thirdly, it discussed the application of the marginal opportunity cost ( moc ) pricing model on water pricing, and then evaluated the feasibility of the model, taking the water pricing of qingzhen city as the example and the result indicated that the water price is 2. 389, 2. 218, 2. 072, 2. 024, 1. 987yuan per cubic meter at the discount rate of 3 %, 5 %, 8 %, 10 %, 15 % respectively

    然後,在古典資源理論與現代西方經濟學資源理論的比較研究基礎上,運用moc模型對水資源進行了研究。在moc模型中,分析了水的各個組成部分及其計方法,最後以鎮市為例,運用moc模型對鎮市水資源進行計和分析。
  12. Based on netomac, a software package for power system simulation, the model and algorithm of pre - dispatch schedule in generation markets, excitation system parameter setting, and power system small signal stability anaylsis are studied in this thesis. the main work is as follows : a model of pre - dispatch schedule is proposed, whose target is to minimize the market purchasing price ( mpp ) in the whole pre - dispatch period. then according to the characteristics of pre - dispatch schedule, the model of pre - dispatch schedule is simplified to minimize the mpp in each pre - dispatch time, and a three - step algorithm of pre - dispatch schedule is designed : dealing with the optimal problem in the whole period of pre - dispatch with static planning method, solving the problem of combination of machines with pr1 method, resolving problem of optimal power flow ( opf ) with modified powell method

    本文基於netomac模擬軟體,以發電市場預調度計劃模型及演法、勵磁系統參數整定和電力系統小擾動穩定性分析為研究內容,主要做了以下工作:建立了以整個預調度計劃周期內的市場購電最小為目標的發電市場預調度計劃模型,並根據預調度計劃問題狀態數多、變量多、混合整數、非解析的特點,將預調度計劃模型的目標函數簡化為各時段的市場最小,設計了三段式預調度演法:用靜態規劃法求解整個預調度計劃周期內的優化問題;用優先級法求解機組組合問題;用改進的powell法求解最優潮流問題。
  13. This artick introduced the design of project amount bill counfing system based on excel, which will improve the project accounting settlement level and pronda a tool for accountant

    摘要本文介紹了用日常通用電子表軟體excel編制工程量單計系統,為實現工程預結化的快速普及和提高提供參考,並為相關造人員提供一種實用的計工具。
  14. Some experts believe efforts by societe generale to close out mister kerviel ' s financial positions played a part in driving down european stock prices early last week

    一些專家相信,興業銀行科維爾先生財務狀況的工作在推動上周早期歐洲股票下跌中起著作用。
  15. The main results of this paper are as fellows f 1 ) illtroducing the ultrasonic technology to the rigid measurement, successful1y exploits the practical small intellectualized ultrasonic device of measuring rigidity by applying mechanical technology, electronic technology and computer science 2 ) reading clearcf displaying more various, applying more information, being easiest to accept by user because of adopting liquid crystal display ( lcd ) 3 ) theorizing the mathematical model between the signal of frequency and the rigid value on the device, possessing very importan practical significance 4 ) optimizing the every parts of the device, achieving the goals of lower wastage of energy, smaller, lighter and inexpensive 5 ) taking the measure to reduce the wastage of energy and adopting reasonable management in power supply for the device, making the device skimp more energy, prolonging the life - span of battery 6 ) utilizing the interface of rs - 232, discussing the communication between the ultrasonic device of measuring rigidity and computef, and also forecasting the foreground of advanced exploitation by user

    本文工作的主要成果是: 1 )將超聲波技術引入零件表面硬度的檢測當中。應用機、電、計機技術,研製成功較為實用的小型智能超聲波硬度檢測儀2 )採用lcd ( liquidcrystaldisplay )液晶顯示,使讀數更晰、顯示多樣化、信息量多、易於為用戶接受3 )在理論上建立了該系統的頻率信號與硬度值的數學模型,具有非常重要的實踐意義4 )對各元器件進行優選,達到低能耗、體積小、重量輕、便宜等目的5 )採取措施降低整個系統的能耗並對系統的供電進行了合理的管理,使其進一步達到低能耗,延長了電池的使用壽命。 6 )利用rs - 232標準介面,討論了該超聲波智能硬度測量儀與系統機進行通訊以及用戶進行二次開發的前景
  16. This paper brings forward many reformation measurements, which include constrainedly pushing uniform calculation rules of quantities in the whole country, establishing uniform norm of using quantity, reforming actual fee modes, setting up the price system forming price by the market, consummating the tendering management system and pushing the tendering mode of boq

    本文提出的改革措施包括如下內容:強制推行全國統一的工程量計規則;制定全國統一的消耗量定額;改革現行的取費方式;建立以市場形成為主的機制;完善工程招投標管理體制,推行工程量單招標。
分享友人