渠閘 的英文怎麼說

中文拼音 [zhá]
渠閘 英文
canal lock
  • : Ⅰ名詞1 (人工開鑿的水道) canal; ditch; channel 2 [書面語] (車輪外圈)outer wheel3 [書面語](盾...
  • : anchor gate
  1. The analysis show that the project target of detaining the coarse and discharging the fine can be got with the related measures, such as placement of the warping sluice on the concave bank of a bending reach ; arrangement of the overflow weir on a bending reach and reasonable zoning and scientific control of the desilting channels etc

    分析表明,採用將放淤布設在彎道上段的凹岸、彎道設置溢流堰、淤沙條的合理分區和科學調度等措施,可以實現試驗工程淤粗排細的目標。
  2. In many low head hydraulic structure, expecially canal system structure, we are used a dopting underflow energy dissipation

    在眾多的低水頭水工建築物中,特別是系建築物中的涵下游,多採用底流消能。
  3. Article 37 no unit and individual may damage, occupy or destroy flood control works such as dams, embankments, sluices, bank revetments, pumping stations and drainage systems, hydrological and communications facilities and standby apparatuses and materials for flood control

    第三十七條任何單位和個人不得破壞、侵佔、毀損水庫大壩、堤防、水、護岸、抽水站、排水系等防洪工程和水文、通信設施以及防汛備用的器材、物料等。
  4. Hydraulics test research on diversion sluice for extension project of taocha canal headwork

    陶岔首樞紐擴建工程引水水力學試驗研究
  5. Open - channel, fabricated - metal slide gates and open - channel, fabricated - metal weir gates

    預制金屬滑動門和明預制金屬溢流堰
  6. In the turbulent flow, the fluid ’ s physical parameters has the stochastic change along with the time and the space, it is very difficult to carries on its rate process ’ s precise computation and the simulation with mathematics method, but unstable condition navier - stokes equation regarding open canal current of water transient motion suitable

    后水流經過加糙的海漫段時,其水流狀態屬明紊流。流體中的各種物理參數,都隨時間與空間發生隨機的變化,很難用數學的方法對其運動過程進行精確計算和模擬。
  7. This system had been applied to strobe engineering of tongjiyan and run well

    該系統已經在通濟堰首取水工程門工程中投入使用,取得了良好的運行效果。
  8. The reason to creates this kind of destruction to be very many, the main of them is that the apron partially has not been able fully to display it to eliminate energy affect so causes the ditch bed to wash out, forms flushes the pit, leading to the apron, to guard against flushes the trough and both banks slope protection destruction, for a long time, disappear power design of plunge basin and layout have been focused on disappear power. but not to give the enough value on uses the sea to inundate the section to disappear power and adjust speed to reduced downriver washes out

    下沖刷破壞的部位絕大多數發生在消力池下的海漫和防沖槽處,造成這種破壞的原因很多,其中很大一部分是由於海漫部分未能充分發揮其消能作用而引起床沖刷,形成沖坑,導致海漫、防沖槽及兩岸護坡的破壞。一直以來,人們把消能的研究重點放在消力池的消能設計及平面布置上,而對海漫段消能及調整流速功能研究甚少,至於對海漫加糙水流運動建立數學模型,在國內外還很少見相關的論文資料。
  9. By using the p + pr algorithm and the technique of synchronous gate operation, a mathematical model of multireach canal systems in the mode of constant water - volume control was developed ; and it was programmed to simulate the control process

    摘要應用門同步操作技術和p + pr演算法,建立了多段串聯系並有側出流的等體積控制模型,並編程對控制過程進行實時模擬。
  10. In the thirteenth year under the reign of the yongle emperor, after investigation and reconnaissance, chen xuan dug a 20 li - long river from the west of huai an city. the river channels off the water of guanjia lake into the huai rver. the river was named as qingjiangpu. along the river such four watergates as yifeng gate, qingjiang gate, fuxing gate and xingzhun gate were built to control the water level

    永樂十三年,陳?通過實地走訪查勘,淮安城西鑿20里,導管家湖堤水至鴨陳口入淮,此河命名為清江浦,河上遞建移風清江福興新莊四,以便調節水位,此後,漕船可直入黃河,節省了大量費用。
  11. Piping and valves maintenance, drainage systems maintenance, heating systems maintenance, sanitary fittings maintenance, water tanks maintenance, etc

    喉管與閥維修、務系統維修、供熱系統維修、衛生設備維修、水缸維修等
  12. Through analysis and study, it is believed important and feasible that the implemented projects, the importing feng jia - shan reservoir into yang mao - wan reservoir and the water supply from shi tou river to xi ' an city ; form the synthetic analysis of the main factors - quantity, time, apace and user " character, it can be conferred that it is not necessary for the four projects in the western areas to join together at present ; adding gate at the 2 head of lin jiacun trench can only help to relax the problem of lack of water in bao jixia irrigation area, to solve the problem of short of water in the irrigation area needs to take project measures at the trunk and branches of wei he river from lin jia village to the upper stream ; the mode of supplying water of the four projects in the western areas are all by gravity, they can only be supplied one way and ca n ' t be supplied each other

    通過分析研究認為:已實施的引馮濟羊工程和石頭河西安供水工程,是十分必要的和可行的;從水資源配置的主要要素? ?數量、時間、空間和用戶性質的綜合分析研究來看,西部四大工程目前尚無整體聯網的必要;林家村首加對解決寶雞峽塬上灌區缺水僅能起到緩解作用,從根本上解決塬上灌區的缺水問題,還必須從林家村以上渭河干支流上採取進一步的工程措施;西部四大工程均為重力供水,只能單補,而不能互補。
  13. Sluice an artificial channel for conducting water, with a valve or gate to regulate the flow

    人工道,堰一種人工挖掘的溝,用於引水,用閥門或水控制水流
分享友人