測流站設備 的英文怎麼說

中文拼音 [liúzhànshèbèi]
測流站設備 英文
gauging station equipment
  • : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
  • : Ⅰ動1 (液體移動; 流動) flow 2 (移動不定) drift; move; wander 3 (流傳; 傳播) spread 4 (向壞...
  • : Ⅰ動詞1 (站立) stand; be on one s feet 2 (停下來; 停留) stop; halt; pause Ⅱ名詞1 (停車點) st...
  • : Ⅰ動詞1 (設立; 布置) set up; establish; found 2 (籌劃) work out : 設計陷害 plot a frame up; fr...
  • : Ⅰ動詞1 (具備; 具有) have; be equipped with 2 (準備) prepare; provide with; get ready 3 (防備...
  • 設備 : equipment; device; facility; implementor; apparatus; installation; appointment; furnishing; setou...
  1. We can get the unqualified light hydrocarbon back to fractional tower to resume fractionating which greatly insures the quality, we combine the science and technology tackle project from da qing natural gas company - the research on microcomputer detection and control system in light hydrocarbon blending crude oil, analyze the machining technology of production device in gas disposing station, study the physical and chemical character of impurity blending in the light hydrocarbon and establish the detection scheme finally

    並讓不合格的產品重新回到分餾塔中進行重新分餾加工,以確保產品質量。本文結合大慶天然氣公司的科技攻關項目? ?輕烴含原油微機控系統研製,對一分公司油氣處理的輕烴生產進行了生產工藝程分析,同時也對輕烴和混入的原油雜質進行物理和化學性質的分析,確立了監控計方案。
  2. Highways winter maintenance plant and highways side equipment maintenance - deicing agent sprayer - fixed station test method for flow rate measurement

    高速公路冬季維修和高速路路邊維修.除冰劑噴灑機.量固定試驗方法
  3. On the day they tested the machine, the temperature refused to budge, and the men took turns standing on the stepladder and dumping buckets of boiling water over the gas canisters

    白天他們在,可溫度沒有變化,工人輪在活梯上將一桶桶污水倒在天然汽灌上。
  4. Fifth, a monitoring center for guarantee of apec communications was set up to undertake round - the - clock real - time supervision, which included supervision of traffic flowing in exchanges that were installed in all meeting venues and key hotels ; supervision on tv signals ; supervision on the running of 82001 equipment ; supervision on the traffic of the shanghai internet node ; supervision on the traffic of the apec mirror site on shanghai hotline ; supervision on the status of the cdpd equipment ; supervision on the status of the adsl equipment and supervision on the status of the atm equipment

    第五,建立apec通信保障監控中心,實施2 4小時實時監控。包括對各場館、重要賓館交換的話務監;電視信號監; 82001運行情況監;網際網路上海節點的量監;上海熱線apec鏡像網量監; cdpd運行情況監; adsl運行情況監; atm運行情況監,形成了一個縱觀全局的指揮平臺。
  5. It includes : dynamic show of technics flow, real time data acquirement and show, history data save and print, fault alarm, etc. the plc control system mainly accomplishes the wastewater technics flow control, harmonizes the logical relationship among local intelligent control instruments and transmits the state of each local equipment to the industrial computer simultaneously, the plc control station receives the control commands from the industrial computer ; the local intelligent units take charge of the correlated parameters measure, disposal and control, and it will transmit the related parameters to the computer, etc. in this thesis, introduced municipal wastewater treatment technics, the integrated application program development of computer, the design method of plc control station, the communication between plc control system and computer, and the network of wastewater treatment with profibus - dp was also discussed

    上位計算機主要實現遠程監和管理功能,具體包括:工藝程動態顯示、實時數據獲得及顯示、歷史數據存儲與列印、故障報警等功能plc控制系統主要完成工藝程式控制制以及協調現場各智能儀表之間的邏輯關系,將現場各的運行狀態通過通訊網路傳輸到上位計算機,並接收上位計算機的控制指令;現場各智能儀表單元負責各相關參數的監和處理、控制,並將有關參數送往上位監控計算機進行處理、保存等。本文以莎車污水處理項目為例,介紹了城市污水處理工藝、上位監控計算機的綜合應用程序開發、城市污水處理自動控制系統plc控制計和採用profibus系列中廣泛應用於現場的profibus - dp總線。
  6. To overcome this problem, not only the meteorological observation network has to be equipped with automated, higher precision, and more economical devices and instruments, but also a synthetic mobile observation system is required for filling in the data gaps between the surface and upper air sounding stations

    為了克服這一問題,除了研製自動化程度高、量精度高和性能價格比高的儀器來裝現有的定點大氣觀網外,還應建一些動的大氣監系統,以獲得常規大氣觀空檔間(如大洋、山區和荒漠等無人區)的天氣現象和大氣環境變化的信息。
  7. In the present grounding measurements in substations, the large electric current method is used to raise the ratio of signal to noise, but this method does not obviously decrease the measurement error. the test instruments are unwieldy, and it is easy to threaten personal safety

    在現有變電接地網接地量中,採用大電試法來減小量誤差,其消除干擾的效果並不理想,且此方法笨重,還可能危及人身安全。
  8. In light of the problem of the precision of flood forecasting being influenced by the data errors of rainfall and water stage caused by the failures of the communication and the relevant equipments of the gauging stations concerned, the techniques for the automatic hydrologic data collection and transmission system such as data extraction, examination of rationality, error identification, rainfall interpolation and the intelligent error correction are studied based on the analysis on the cause of the errors occurred in the system

    摘要針對域洪水預報和水庫調度中雨量水位點可能因通信和故障引起雨量和水位數據錯誤,而影響洪水預報精度的問題,通過分析水文遙系統雨水情信息錯誤的原因,研究水文遙系統雨水情數據的提取、合理性檢驗、錯誤識別方法、雨量插補、數據的智能化糾錯處理等技術。
  9. It is one of the most important works to run economically in today and future. the system of electric control automation in zhao zhaou is open, it bases on the net of rs485 bus control and centrally manages substation by control the main machine. the system controls the run parameter of electric equipment and the run environment by using the computer measure, communication and automation technology, it can realize measure, communicate, control and allocate in the remote area, transmit data and control through collect data and automatic count parameter

    肇州縣電力調度自動化系統是以rs485總線工業現場控制網路為基礎,通過監控主機對變電進行集中管理的完全開放式系統,該系統綜合了計算機、量、通訊和自動化的專業技術來監控電力的運行參數、監控運行環境,通過對輸變電線路及的交電壓、電的數據採集,自動計算出功率、電量、功率因數、頻率等參數,實現四遙:遙、遙信、遙控、遙調及數據傳輸和監控功能。
  10. When the data of logistics in current process are used for input of simulating logistics in future 100 % continuous casting process, supply of hot metal from iron - making process may not satisfy the needs of 100 % continuous casting on raw materials. because planning scheme in continuous casting process depends greatly on smelting scheme in convertor vessel, it is important for operator to balance raw materials supply, smelting and casting in order to realize the scheme of 100 % continuous casting. when some equipment are work abnormally, mixer of hot metal and lf furnace can be used for logistics buffer

    用攀鋼煉鋼生產數據對模擬軟體系統進行的試和模擬研究結果表明:模擬系統的隨機數發生演算法可以實現對作業時間的依分佈隨機抽取;在相似的輸入條件下,模擬結果與實際生產物的時間分佈規律基本吻合,達到了模擬軟體計的預期目標;若以攀鋼提釩煉鋼廠現工藝的鐵水輸入作為全連鑄后的輸入條件,則現工藝的物料供應能力可能難以滿足全連鑄生產的要求;連鑄機的連澆計劃對轉爐爐次計劃的編制有很高的要求,合理安排來料、煉鋼與澆鑄三者間的物平衡關系將是保證全連鑄作業的重要條件;當出現異常情況時,可以利用混鐵爐與lf爐前等待作為物緩沖池,通過延長系統的平均物時間來緩解因檢修和故障等擾動所造成的影響,確保生產的順利進行。
  11. The industrial computer mainly implements the functions of long - range supervision and management it includes : dynamic show of technics flow, real time data acquirement and show, history data save and print, fault alarm, etc ; the plc control system mainly accomplishes the wastewater technics flow control, harmonizes the logical relationship among local intelligent control instruments and transmits the state of each local equipment to the industrial computer, simultaneously, the plc control station receives the control commands from the industrial computer ; the local intelligent units take charge of the correlated parameters " measure > disposal and control, and it will transmit the related parameters to the computer, etc. in this thesis, introduced municipal wastewater treatment technics, the integrated application program development of computer, the design method of plc control station, the communication between plc control system and computer, and the network of wastewater treatment with industrial ethernet was also discussed

    上位計算機主要實現遠程監和管理功能,具體包括:工藝程動態顯示、實時數據獲得及顯示、歷史數據存儲與列印、故障報警等功能; plc控制系統主要完成工藝程式控制制以及協調現場各智能儀表之間的邏輯關系,將現場各的運行狀態通過通訊網路傳輸到上位計算機,並接收上位計算機的控制指令;現場各智能儀表單元負責各相關參數的監和處理、控制,並將有關參數送往上位監控計算機進行處理、保存等。本論文介紹了城市污水處理工藝、上位監控計算機的綜合應用程序開發、城市污水處理自動控制系統plc控制計和採用工業以太網技術的污水處理通信網路。
  12. This paper, according to the characteristic and requests of measurement for the medium loss of electric capacitive equipment and the resistive weight of moa leak current in a power substation, according to the on - line monitoring principle and implementing scheme of electric equipment in substation relying mainly on the means through the software analysis, finish the design and the fabrication of monitoring system hardware and software, and then empolder the on - line monitoring equipment fitting for the 220kv substation of dazhuling in chongqing, have finished the installation, debugging and the data analyzing of the running device

    本文針對變電電容性介質損耗和moa泄漏電阻性分量量的特點和要求,按照以軟體分析為主的變電電氣絕緣在線監的原理和實施方案,完成了監系統硬體、軟體的計、製作並開發了適合於重慶大竹林220kv變電電氣絕緣的在線監裝置,完成了裝置的安裝、調試和運行的數據分析。
  13. This thesis associated with the communication system of hvdc, investigated the realization of profibus controlling system, designed decentralized field control device which based on profibus - dp protocol and to serve as a decentralized field control device in a microprocessor based station control and monitoring system

    論文結合高壓直輸電控制保護系統的數據通信結構,計了基於dp協議的智能從,它的作用是在一個基於微處理器的控制和檢系統中作為一個分佈的現場控制
  14. Based on the detailed investigation about the present conditions of polution in yichang and three gorges dc converter stations and its prediction, and concerning the esdd measurement of dc, ac equipment near the three gorges dc converter station, the operating experience and the atmospheric characters of the yichang city, the porper data of esdd of three gorges dc converter station is presented. and further more, presents the related structural parameters of outer insulation of out door dc, ac equiptment

    針對宜昌市大氣污染和三峽換址附近污穢狀況,結合三峽換附近交、直鹽密量和運行經驗以及宜昌氣候特徵,提出了三峽換適用的等值附鹽密度值,並在此基礎上提出了交、直戶外外絕緣的有關結構參數。