測量隧 的英文怎麼說
中文拼音 [cèliángsuì]
測量隧
英文
survey party- 測 : 動詞1. (測量) survey; fathom; measure 2. (測度; 推測) conjecture; infer
- 量 : 量動1. (度量) measure 2. (估量) estimate; size up
- 隧 : Ⅰ名詞1. (隧道; 地道) tunnel; underground pass2. [書面語] (道路) road3. (郊外的地方) suburbsⅡ動詞[書面語] (旋轉) turn
- 測量 : measure; survey; gauge; meter; measurement; measuring; surveying; mensuration; metering; gauging;...
-
Probe into some problems in tunnel demarcation surveying
隧道限界測量若干問題探討This paper utilized the deformation characteristics of rock and expatiates on the strain test method of surrounding rock by which to judge the surrounding rock ' s stability, and to choose the suitable opportunity and style of the secondary lining
摘要利用巖體的變形特性,通過測試隧道圍巖應變出隧道凈空實際收斂量,從而判定施工過程中隧道圍巖的穩定性,為選取合適的支護時機和方式提供依據。Lighting of street tunnels and underpasses ; calculation and measurement
隧道和地下通道的照明.計算和測量And some ancillary equipment such as : dosing units, feeding systems etc., they allow to operate in the most different job - site conditions : from large tunnels to small caverns and mining, from swimming pools construction to large channels maintenance
另外還有一些輔助設備,如測量設備,上料設備等。該類機器被廣泛使用到礦山鐵公路隧道水電工程巖土工程地下建築地鐵和市政基礎設施建設中。In this paper, we study the most serious damming section of the east - one main canal, which is from the entrance of the hao wan flume ( chainage12 + 123. 6 ) to the exit of shang tian yuan tunnel ( chainage24 + 091. 1 ). the main content is analyzing the flow characteristic of the canal, setting up mathematical model of the discharge condition of the east - one main canal, according to the survey section and actual roughness factors, building, bend and so on, we divided the canal into more than loocaculation segments. each segment is calculated by microsoft excel electrical table through computer as permanent transition flow of non - prismatic channel
本論文研究的渠段為陸渾灌區東一乾渠壅水最為嚴重的渠段,從郝灣渡槽進口(樁號12 + 123 . 6 )至上天院隧洞出口(樁號24 + 091 . 1 ) ,其主要內容是,分析渠道水流特徵,建立東一乾渠輸水狀況的數學模型,根據測量斷面及實際糙率、建築物、彎道等因素的不同,將渠道劃分成120多個計算段,每段按非稜柱體恆定漸變流,運用microsoftexcel電子表格進行編程計算。An experimental unit for measuring the instantaneous speed of a high - speed train passing through tunnel
高速列車進出隧道瞬時速度測量實驗裝置Analysis and study on gauge survey of an existing tunnel
某既有隧道測量及限界分析與研究Problems needing attention in survey of immersed tunnel
沉管隧道測量中值得注意的幾個問題First, on the base of investigating geleshan geologic environments, the author carefully analyzes them, studies their water storage structure, discusses the relationship of underground water dynamic changes and tunnel drainage by desiccation ; secondly, the author makes the dynamic analysis, regression analysis, routine hydrochemistry analysis, isotope analysis, so draws to guan - yin gorge anticlire east and west slot ' s karst developing features, alternated conditions underground water and supplying drain ways ; thirdly, by stating the fissuring ' s surveying data, the author calculates the seeping tensor
作者在進行歌樂山地質環境調查的基礎上,仔細分析了大量觀測資料,研究其儲水構造,掌握地下水動態變化與隧道施工涌水的關系,及補給受降雨的影響情況。對隧道周圍的地下水進行動態分析、回歸分析、常規水化學分析以及同位素分析,得出觀音峽背斜東西翼槽谷的巖溶發育特徵,及地下水的循環交替條件、補給排泄途徑;統計分析裂隙測量數據,計算滲透張量。On the basis of the practice on work of extra - insufficient control and the subsidence of vault and the earth ' s surface, cases of engineering surveying techniques applied in the construction supervision in tunnels are discussed
摘要通過超欠挖控制、拱頂下沉、地表下沉的工程實踐,討論在隧道施工監控量測中工程測量技術的應用情況。The present status of parameter measurement are argued in firing process of ceramic kiln, including the methods and appliance of temperature and pressure and medium and so on, and the restriction of firing process of ceramic kiln applies to them
本文對目前陶瓷隧道窯燒成過程各參數的檢測狀況進行了全面的介紹,主要包括燒成過程中溫度、壓力、氣氛等參數進行測量的常用方法和儀表,以及燒成過程對這些方法和儀表的特殊要求。By analyzing the limits of the breakthrough error in tunnel boring survey, the requirement data of the measurement error in different construction stages are obtained, and the precision, methods and schemes of the surveying are determined to ensure the tunnel breakthrough successfully
摘要通過貫通誤差的限值分析得到不同施工階段的測量限差要求,確定測量精度、方法,制定測量方案,確保盾構隧道貫通。This paper discusses elimination of disturbance, detection of air - raid shelter, check up of road surface and lining quality of channel and detection of karst cave
文章針對消除干擾的方法、關于防空洞探測、關于公路路面檢測和隧道襯砌質量檢測、地下巖溶探測等內容進行了探討。Optimum design for construction management by limiting the period of survey, drilling, loading and exploding, ventilating and transporting is intensively studied and the applicability of boosting the speed of construction by well organization of space, manpower and machine is fully illustrated
論文重點闡述了通過縮短測量劃線、鉆眼、裝藥爆破、通風排煙、裝碴運輸作業時間,達到快速施工組織設計優化的目的,說明了採用鉆爆法施工充分利用隧道空間,合理配備人力、機械,隧道開挖施工進度得到提高的可行性。Tunnel section laser distance measuring instrument
隧道斷面測量儀中的激光測距Survey technique in shield construction of subway sectional tunnel
地鐵區間隧道盾構法施工中的測量技術Now he is a registered surveyor of singapore, mainly engaged in various services relating to surveying & mapping as well as relevant software r & d, including shield tunnelling survey and automated real time 3d monitoring
現為新加坡注冊測量師,主要從事各種測繪專業技術服務以及相關的軟體研發工作,包括隧道盾構掘進測量與自動化實時三維監測。The direction guidance system plays an important part in the shield excavation, such as the prevention of snake motion, the reduction of ground settlement of tunnel construction and the insurance of tunnel quality etc. based on the principle of guidance system, a precise direction guidance system with high accuracy, high efficiency and more reliability is developed, it has the advantages of less times of surveying, real time positioning and shield behaviors monitoring
盾構導向系統是盾構掘進時的指揮系統,對指導盾構掘進、隧洞貫通、減少地表沉降以及保證隧洞的質量等具有重要的作用。本文在研究盾構導向工作原理的基礎上開發研製了一套盾構導向系統,精度高、工作可靠,可極大地縮短導向測量的時間和減輕勞動強度,實現了盾構掘進的實時定位和姿態監測。Breakthrough clearance survey of metro tunnels transferred from existing air - raid tunnels
利用既有隧道修建地鐵的貫通性限界測量及分析But for trainee teacher and pinglin graduate wang kunwei the noise has been a continual annoyance since construction on the tunnel started when he was a junior high school student
根據教育局實地測量分貝,全在合格?圍,但在坪林國中擔任實習老師的王?韋,自己還在就讀坪林國中時,他經歷了雪山隧道開挖最吵的施工期。分享友人